The OPSIM Dynamic Operator-Plant Model: Implementation and Some Results (Englisch)
- Neue Suche nach: Dang, V. N.
- Neue Suche nach: Siu, N. O.
- Neue Suche nach: Dang, V. N.
- Neue Suche nach: Siu, N. O.
In:
Probabilistic safety assessment: Moving toward risk-based regulation
;
253-260
;
1996
-
ISBN:
- Aufsatz (Konferenz) / Print
-
Titel:The OPSIM Dynamic Operator-Plant Model: Implementation and Some Results
-
Beteiligte:Dang, V. N. ( Autor:in ) / Siu, N. O. ( Autor:in )
-
Kongress:International topical meeting, Probabilistic safety assessment: Moving toward risk-based regulation ; 1996 ; Park City; UT
-
Erschienen in:
-
Verlag:
- Neue Suche nach: ANS
-
Erscheinungsdatum:01.01.1996
-
Format / Umfang:8 pages
-
Anmerkungen:Also known as PSA '96
-
ISBN:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Inhaltsverzeichnis Konferenzband
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 3
-
Risk Impact of Switchyard Maintenance Through Use of the Safety MonitorHook, T. G. et al. | 1996
- 9
-
Application of the EOOS Monitor[TM] at Arkansas Nuclear One 1 & 2 to Assess On-Line Maintenance RiskHarris, R. / Lloyd, M. / Gough, W. S. et al. | 1996
- 12
-
Safety Monitor[TM] Implementation Project at Wolf Creek, Callaway, and Comanche Peak StationsStamm, J. / Tunink, J. A. / Hamzehee, H. / Morgan, T. A. et al. | 1996
- 20
-
The Plant Outage Safety Monitoring (POSM) SystemPeng, C.-M. / Chang, Y. Y. / Ko, C. M. et al. | 1996
- 25
-
Sentinel On-Line Maintenance Planning and Configuration Safety ManagementWilson, D. et al. | 1996
- 35
-
An Approach for Risk-Informed DecisionmakingRamey-Smith, A. M. / El-Bassioni, A. / Guttmann, J. / Hardin, W. B. et al. | 1996
- 38
-
Incorporation of PSA Into the Regulatory Process - An Example to Promote DiscussionRosztoczy, Z. R. et al. | 1996
- 46
-
Call to Action: Pilot Programs for Performance-Based RegulationChristie, B. et al. | 1996
- 54
-
The Importance of Utilizing a Blended Approach in Regulatory Applications of Probabilistic Safety AssessmentTrue, D. / Fleming, K. N. / Burns, E. / Sellers, C. D. et al. | 1996
- 63
-
On the Road to "Human Error"Hollnagel, E. et al. | 1996
- 70
-
An HRA Data-Based Approach Using Power Plant SimulatorsSpurgin, A. J. / Bareith, A. et al. | 1996
- 78
-
A Survey of International Practice in HRAHirschberg, S. / Dang, V. N. / Reiman, R. et al. | 1996
- 85
-
HRA Tailored for Risk Informed Decisions for Shutdown SafetyMacLeod, D. E. / Burns, E. T. / Lee, L. K. et al. | 1996
- 93
-
Development of a Full-Score Shutdown PSA for the Muehleberg Nuclear Power PlantSummitt, R. / Torri, A. / Haschke, D. et al. | 1996
- 100
-
A Methodology for Evaluation of Transition RiskFinnicum, D. / Jaquith, S. / Hackerott, A. / Labrecquec, R. et al. | 1996
- 106
-
Reflux Condensation Effect Analysis During Mid-Loop Operation with Shutdown Cooling System FailureKwon, J.-J. / Hong, S.-Y. / Son, Y.-S. et al. | 1996
- 113
-
Analysis of Loss of RHR Cooling During Mid-Loop OperationFujimoro, H. / Yoshihara, K. / Watada, M. / Ohtani, M. et al. | 1996
- 121
-
An Overview of Aging Risk Assessment Methods and ApplicationsWu, J.-S. / Apostolakis, G. / Milici, A. / Guarro, S. et al. | 1996
- 127
-
Evaluations of the Risk Effects of AgingVesely, W. E. et al. | 1996
- 133
-
Natural Conjugate Prior Distributions for Bayesian Analysis of Aging PhenomenaHuang, Y.-S. / Bier, V. M. et al. | 1996
- 141
-
Aging Issue of Japanese Research and Development Program for LWR Components and MaterialsHiguchi, M. / Kishida, K. / Honjin, M. / Ishimoto, S. et al. | 1996
- 151
-
Influence Diagrams and Decision Trees for Severe Accident ManagementGoetz, H. / Seebregts, A. / Bedford, T. et al. | 1996
- 159
-
Improvements to Discrete Dynamic MethodologiesSmidts, C. / Swaminathan, S. et al. | 1996
- 167
-
Risk and Reliability Assessment for Telecommunications NetworksWyss, G. D. / Schriner, H. K. / Gaylor, T. R. et al. | 1996
- 175
-
Generation of Minimal Vertex Cutsets of k-Terminal NetworkShin, Y. Y. / Kim, T. W. et al. | 1996
- 183
-
Risk Profiles from Quantification MethodsKalache, M. / Cragg, C. D. / Putney, B. F. / Gough, W. W. et al. | 1996
- 187
-
Automated Shift Supervisor Log Program at Northeast UtilitiesCietek, F. O. / Gough, W. S. / Cragg, C. D. et al. | 1996
- 190
-
A Missing Cutsets Finding Algorithm for Risk Monitor (McFarm)Kim, K. / Han, S. et al. | 1996
- 195
-
Development of a Reliability Engineer Workstation and Applications on a Nuclear Power PlantMeslin, T. B. et al. | 1996
- 203
-
Some Perspectives on Risk Importance MeasuresWall, I. B. / Worledge, D. H. et al. | 1996
- 209
-
System Impact on Core Damage FrequencyChristie, B. / Jondle, D. / Ramirez, J. et al. | 1996
- 215
-
Developing Useful Insights and Avoiding Misleading Conclusions from Risk Importance Measures in PSA ApplicationsFleming, K. N. et al. | 1996
- 222
-
Importance Measures for Risk-Informed Regulatory Applications: Information Content and UncertaintiesSherry, R. et al. | 1996
- 230
-
Consideration of Probabilistic Uncertainty in Risk-Based Importance RankingModarres, M. / Agarwal, M. et al. | 1996
- 237
-
Effect of Probabilistic Safety Assessment Truncation Limits on Risk Achievement Worth CalculationCanavan, K. T. et al. | 1996
- 245
-
Assessment of Cognitive Errors and Organizational Aspects Based on Evaluation of Plant ExperienceStraeter, O. et al. | 1996
- 253
-
The OPSIM Dynamic Operator-Plant Model: Implementation and Some ResultsDang, V. N. / Siu, N. O. et al. | 1996
- 261
-
Empirical Investigation for Team Performance Evaluation on Crew Composition and Procedure TypesKim, S.-C. / Lee, J. I. et al. | 1996
- 268
-
Development of the Advanced Emergency Operating Procedures Using Task Allocation and Synthesis of PRA ResultsKang, K. S. / Sung, K. S. / Seo, J. T. et al. | 1996
- 276
-
Influence of Organizational Factors on Maintenance Performance of NPPsHuang, Y. / Chou, G.-H. / Hwang, S.-L. et al. | 1996
- 287
-
Risk Informed Decisions: Incorporating IPEEE Analyses Into the Living PSAAndersen, V. M. / Burns, E. T. et al. | 1996
- 293
-
Multiple System Responses and Interaction Issues: Adequacy of Treatment in IPE/IPEEE SubmittalsCronenberg, A. W. et al. | 1996
- 301
-
Development of Seismic PSA Code SystemSakagami, M. / Oguro, E. / Tatsumi, Y. / Hirano, M. et al. | 1996
- 309
-
Estimation of Functional Failure Probability of Sea Water Intake Channels Under Earthquake MotionEbisawa, K. / Andoh, K. / Kohno, K. / Itoh, M. et al. | 1996
- 319
-
Simplified Radiological Source Term Generation AlgorithmGough, S. T. et al. | 1996
- 325
-
A Combined Procedure of RSM and LHS for Uncertainty Analyses in Source Term Quantifications Using MAAP3.0B CodeChun, M.-H. / Han, S.-J. / Tak, N.-I. et al. | 1996
- 333
-
PST-A New Method for Estimating PSA Source TermsRempe, J. L. / Cebull, M. J. / Gilbert, B. G. et al. | 1996
- 338
-
Moving Toward a More Realistic DBA Radiological Source TermCrandall, R. A. et al. | 1996
- 345
-
Comparison of NUREG-1465 and MAAP4 with MAAP4-Dose ApplicationElicson, G. T. / Raines, J. C. / Hammersley, R. J. et al. | 1996
- 355
-
A Decision Model for the Optimization of Plant Shutdown Criteria and Test IntervalsHolmberg, J. et al. | 1996
- 363
-
Prioritise Safety Upgrades for Reactors on the Basis of Risk Reduction and CostsIslamov, R. T. et al. | 1996
- 368
-
Achieving High Reliability and Capacity Factor of Nuclear Power Plant Systems with Extended Refueling Cycle LengthLi, F. / Golay, M. W. et al. | 1996
- 378
-
Risk Based Optimization of the Frequency of EDG On-Line Maintenance at Hope CreekKnoll, A. / Samanta, P. K. / Vesely, W. E. et al. | 1996
- 385
-
Probabilistic Safety Assessment Improves Technical SpecificationsCepin, M. / Mavko, B. et al. | 1996
- 395
-
An Analytical Framework for Risk-Based Environmental Decision MakingToll, J. / Robinson, S. / Cardwell, R. / Pavlou, S. et al. | 1996
- 403
-
A Practical Approach for Sites Providing Risk Based Budgeting Information to the Environmental Management ProgramBowman, B. S. / Unione, A. / Zocher, M. et al. | 1996
- 411
-
Regulatory PSA Applications in The NetherlandsVersteeg, M. F. et al. | 1996
- 416
-
PSA Based Backfitting and Accident Management in The NetherlandsBorst, M. V. D. / Versteeg, M. F. et al. | 1996
- 423
-
Integrated Evaluation of Fire and Flooding PSAs for Power Generation States at Nuclear Power PlantsCarlsson, L. / Karlsson, C. / Werner, W. et al. | 1996
- 431
-
Handbook of Methods for Risk-Based Analysis of Technical SpecificationsSamanta, P. K. / Kim, I. S. / Mankamo, T. / Vesely, W. E. et al. | 1996
- 441
-
PSA Application in Nuclear Plant Barrier Control ProgramMotamed, M. E. / Roldan, Z. S. et al. | 1996
- 445
-
Experience with the OSPRE Program: Integrating Risk Management Software Into Work ControlShaneyfelt, S. / Budowle, R. et al. | 1996
- 448
-
PRA Support to Outage Risk Management at Northeast UtilitiesCietek, F. O. / Dube, D. A. / Labrecque, R. C. / Hamlin, T. L. et al. | 1996
- 451
-
On-Going PSA Applications for Safe and Cost-Effective OperationsGuey, C. et al. | 1996
- 457
-
Safety Analysis and Design Framework in ITERPoucet, A. / Pier, S. J. et al. | 1996
- 464
-
The Use of ISAD Software for ITER Sequence AnalysisPinna, T. / Caporali, R. / Poucet, A. / Carpignano, A. et al. | 1996
- 470
-
ITER Plant Safety Assessment Tools and Data: Sequence Analysis Computer CodesCarpignano, A. / Nordvik, J. P. / Pinna, T. / Poucet, A. et al. | 1996
- 481
-
The "Impact Super-Simulation" Project-Basic FrameworkUjita, H. / Nagumo, H. / Abe, N. / Vierow, K. M. et al. | 1996
- 497
-
Faster than Real Time Accident Management Predictions at CSN Using MarsDawson, S. M. / Raines, J. C. / Hammersley, R. J. / Munuera, A. et al. | 1996
- 507
-
Fire Risk Analysis for Loviisa 1 During Power OperationLehto, M. / Jaenkaelae, K. / Mohsen, B. / Vaurio, J. K. et al. | 1996
- 515
-
The Current Activities of Fire PSA at INS/NUPECUchida, T. / Fukuda, M. / Hirano, M. et al. | 1996
- 522
-
A Computerised Fire PSABertrand, R. / Bonneval, F. et al. | 1996
- 533
-
Duke Power Co. Fire Protection IPEEEKachnik, L. J. / Brandes, D. et al. | 1996
- 539
-
Recent Risk Assessment Developments in CaliforniaLapin, C. A. et al. | 1996
- 542
-
Numerical Environmental Quality Guidelines: The Predictability of the Current Generation of Sediment Quality GuidelinesDillon, F. S. / Johns, D. M. et al. | 1996
- 550
-
Technical and Policy Challenges in Developing and Implementing Risk-Based Environmental RegulationsPavlou, S. P. / Zillioux, E. J. / Anderson, P. D. / Serie, P. J. et al. | 1996
- 559
-
PSA Based Event Analysis of Incidents and Failures at TVO BWRJulin, A. / Virolainen, R. K. et al. | 1996
- 564
-
PSA Based Plant Modifications and Backfits an International SurveyLanore, J. M. et al. | 1996
- 571
-
Safety Management of a VVER Plant by Risk AssessmentVaurio, J. K. / Jaenkaelae, K. E. et al. | 1996
- 579
-
Living PSA as a Plant Safety Management ToolBalfanz, H.-P. et al. | 1996
- 589
-
Development of a Risk Informed Operations Program for the CE Owner's GroupHackerott, A. / Jaquith, S. C. / Schneider, R. E. et al. | 1996
- 597
-
Enhancing PSA Use in Outage Scheduling Applications at Grand Gulf Nuclear StationHewitt, J. / Rao, D. et al. | 1996
- 600
-
PSA-Operations Synergism for the Advanced Test Reactor Shutdown Operations PSAAtkinson, S. A. et al. | 1996
- 605
-
Enhancing the H. B. Robinson Probabilistic Safety Assessment: Improved Support of Plant Risk-Based OperationsLaur, S. A. / Johnson, N. H. et al. | 1996
- 615
-
Systems Reliability Analysis for the National Ignition FacilityMajumdar, K. C. / Annese, C. E. / MacIntyre, A. T. / Sicherman, A. et al. | 1996
- 623
-
Safety Analysis and Risk Assessment of the National Ignition FacilityBrereton, S. / McLouth, L. / Odell, B. / Singh, M. et al. | 1996
- 631
-
Time and Motion Study for the National Ignition Facility Target AreaLatkowski, J. F. / Tobin, M. T. et al. | 1996
- 637
-
Component Reliability Data Estimation for Fusion Safety and Risk AssessmentCadwallader, L. C. / Marshall, T. D. et al. | 1996
- 651
-
Probabilistic Modeling of Safety Risks of Aircraft Crashes Into StructuresMensing, R. W. / Barondes, A. D. et al. | 1996
- 658
-
A Method to Estimate the Frequency of General Aviation Crashes Occurring During Non-Airport OperationsStutzke, M. A. / Haley, T. A. / Barto, A. B. et al. | 1996
- 664
-
Improved Assessment of Aviation Hazards to Ground Facilities Using a Geographical Information SystemSandquist, G. M. / Slaughter, D. M. / Kimura, C. Y. et al. | 1996
- 671
-
A Process for Application of Atheana - A New HRA MethodParry, G. W. / Bley, D. C. / Cooper, S. E. / Wreathall, J. et al. | 1996
- 679
-
Knowledge-Base for the New Human Reliability Analysis Method, "A Technique for Human Error Analysis" (ATHEANA)Cooper, S. E. / Bley, D. C. / Parry, G. W. / Wreathall, J. et al. | 1996
- 686
-
Trial Application of a Technique for Human Error Analysis (ATHEANA)Bley, D. C. / Cooper, S. E. / Parry, G. W. / Wreathall, J. et al. | 1996
- 691
-
Dynamic vs. Static Human Reliability Approaches: A Comparison of HERMES and THERP on a Nuclear Study CaseCacciabue, P. C. et al. | 1996
- 701
-
Risk Criterion and Index of RiskWang, J. C. / Johnson, R. O. / Lee, D. W. et al. | 1996
- 708
-
An Integrated Societal and Utility Risk Analysis Model for Nuclear Power Plant Severe Accident ConsiderationsKlopp, G. T. et al. | 1996
- 716
-
Estimating the Economic Worth of an Average Member of a Given Population GroupSandquist, G. M. / Rogers, V. C. et al. | 1996
- 721
-
The Treatment of Uncertainties in Risk Analysis: Management Relevance and Comparison IssuesPate-Cornell, M. E. et al. | 1996
- 731
-
A Survey of Risk-Based Regulation in the Chemical, Petrochemical and Petroleum IndustriesKaiser, G. D. et al. | 1996
- 738
-
Issues Associated with Risk-Informed Regulation of Nuclear Power PlantsEl-Bassioni, A. / Guttman, J. / Hardin, W. B. / Ramey-Smith, A. et al. | 1996
- 742
-
Development of a Surrogate Risk Measure for Risk Benefit AssessmentSummitt, R. et al. | 1996
- 748
-
A Cross-Comparison Process for Validation of PSA ApplicationsHackerott, A. / Jaquith, S. C. / Schneider, R. E. et al. | 1996
- 756
-
Use of Risk Analysis in the Regulations of the Norwegian Petroleum IndustryNielsen, L. / Sklet, S. / Oeien, K. et al. | 1996
- 765
-
Improved Guidance on the Use of Experts: Probabilistic Seismic Hazard Analysis and Other ApplicationsBudnitz, R. J. / Apostolakis, G. / Coppersmith, K. J. / Cornell, C. A. et al. | 1996
- 769
-
Common-Cause Failure Data Collection and Analysis System ResultsMarshall, F. M. / Mosleh, A. / Rasmuson, D. M. et al. | 1996
- 777
-
Status of Common Cause Failure Analyses in PSA in GermanyBerg, H. P. / Goertz, R. / Schaefer, T. / Schott, H. et al. | 1996
- 783
-
Common Cause Failure Probabilities for Partial Diverse Component GroupsKreuser, A. / Verstegen, C. et al. | 1996
- 791
-
An Application of the Go-Flow Methodology-Evaluation of Emergency Decay Heat Removal Systems for New Type Marine ReactorMatsuoka, T. / Kobayashi, M. / Yamaji, A. / Mitomo, N. et al. | 1996
- 796
-
RCM Approach to Improve the Reliability of Diesel Generators at NPPKim, T. W. / Singh, B. et al. | 1996
- 805
-
Applying the Event-Sequence Paradigm to Learn from an AccidentYellman, T. W. et al. | 1996
- 813
-
Relating Aviation Service Difficulty Reports to Accident Data for Safety Trend PredictionFullwood, R. R. / Hall, R. E. / Martinez-Guridi, G. / Uryasev, S. et al. | 1996
- 818
-
Estimate of Air Carrier and Air Taxi Crash Frequencies from High Altitude En Route Flight OperationsSanzo, D. / Kimura, C. Y. / Prassinos, P. G. et al. | 1996
- 825
-
The Frequency of Aircraft Crashes on Facilities Near the Salt Lake City International AirportKimura, C. Y. / Glaser, R. E. / Sandquist, G. M. et al. | 1996
- 833
-
Assessment of Aircraft Risk Reduction at Pantex PlantLin, Y. T. / Hedtke, R. / Fike, D. / Diniz, J. et al. | 1996
- 841
-
SWISRUS: A Swiss/Russian PSA Project for the Novovoronezh-5 Nuclear Power PlantSchmocker, U. / Chakraborty, S. / Meyer, P. / Khatib-Rahbar, M. et al. | 1996
- 846
-
Overview of Novovoronezh Unit 5 PSALubarsky, A. / Kouzmina, I. / Shubeiko, E. / Berg, T. et al. | 1996
- 852
-
Preparation and Analysis of Data for the Novovoronezh-5 PSAKouzmina, I. / Lubarsky, A. / Soldatov, V. / Sysoev, N. et al. | 1996
- 860
-
The Database of Safety Component Reliability (CRDB) for VVER PSA in UkraineRodionov, A. et al. | 1996
- 867
-
Summary of Level 1 PSA Results for the Dukovany and Bohunice VVER-440 Model 213 Nuclear Power PlantsPuglia, W. J. et al. | 1996
- 879
-
Environmental Risk-Based Regulations: A Panel DiscussionNitschke, R. L. / Campbell, A. / Cirone, P. / Connor, T. et al. | 1996
- 883
-
Configuration Management of On-Line Maintenance and Dynamic Risk ImportanceGrantom, C. R. et al. | 1996
- 889
-
Synergy of Design Basis Analyses and PSADube, D. A. et al. | 1996
- 896
-
Development and Application of a PSA-Model for Safety Evaluation Preceding Restart and Modernization of Oskarshamn Unit 1Gunnarsson, K. et al. | 1996
- 904
-
Risk Based Regulation Using Probabilistic Risk Assessment in Undefined EnvironmentsSmidts, C. / Brannigan, V. et al. | 1996
- 915
-
Application of the Risk Oriented Accident Analysis Methodology (ROAAM) to Severe Accident Management in the AP600 Advanced Light Water ReactorScobel, J. H. / Theofanous, T. G. / Sorrell, S. W. et al. | 1996
- 924
-
A SCDAP/RELAP5 Evaluation of External Reactor Vessel Cooling in AP600Knudson, D. L. et al. | 1996
- 932
-
Reactor Cavity Flooding as an Accident Management StrategyCatton, I. et al. | 1996
- 940
-
Integration of Severe Accident Assessment and Management to Fulfill the Safety Goals for the Loviisa NPPLundstroem, P. / Tuomisto, H. / Theofanous, T. G. et al. | 1996
- 948
-
Applications of Level 2 PSA Results and Insights in the System 80+[TM] Reactor Containment DesignSchneider, R. E. / Jacob, M. C. / Finnicum, D. J. et al. | 1996
- 954
-
Preliminary Evaluation of KNGR's Containment PerformanceLee, S.-M. / Lee, S.-J. et al. | 1996
- 963
-
Comparison of Methodologies for Assessing the Risks from Nuclear Weapons and from Nuclear ReactorsBenjamin, A. S. et al. | 1996
- 971
-
A Discussion of the Use of Hazards Assessment and Probabilistic Safety Analysis Techniques for Nuclear Explosive OperationsBott, T. F. / Eisenhawer, S. W. / Fischer, S. R. et al. | 1996
- 977
-
Initiating-Event Frequencies for Nuclear Weapon Dismantlement Hazard AnalysisEisenhawer, S. W. / Bott, T. F. et al. | 1996
- 983
-
Extension of Nuclear Reactor Risk Assessment Techniques to the Analysis of Public and Worker Risks from an Army Chemical Weapons Disposal FacilityBrandyberry, M. D. et al. | 1996
- 993
-
An Overview of NRC Research Activities in Probabilistic Risk AnalysisCunningham, M. A. / Drouin, M. T. / Ramey-Smith, A. M. / VanderMolen, H. J. et al. | 1996
- 1000
-
Risk Based Management Application for BWR in JapanWatanabe, T. / Miyata, K. / Tomioka, Y. / Tanaka, H. et al. | 1996
- 1008
-
Application of Level 1 PSA to FugenSotsu, M. / Iguchi, Y. / Ikeda, H. / Chujou, M. et al. | 1996
- 1016
-
The SBO Probability Analysis Depending on Configuration of Diesel Generator in Multi-Unit SiteKim, M.-K. / Hang, S.-Y. / Roh, S.-R. et al. | 1996
- 1021
-
The Conversion of a Support State PSA/PRA Model Benefits and InsightsAnoba, R. C. / Laur, M. N. et al. | 1996
- 1029
-
The Use of a Risk-Based Approach to Implement Improvements in Technical Specifications at the Dukovany VVER/440 V-213 Unit 1Puglia, W. J. / Dusek, J. et al. | 1996
- 1037
-
Description of PSA Activities at the Bohunice V1 and V2 Nuclear Power PlantsPnacek, I. et al. | 1996
- 1045
-
Route Characterization for Risk Assessment of Highway Transport of Nuclear MaterialsSagartz, M. J. et al. | 1996
- 1051
-
A Case Study of Probabilistic Safety Assessment of Radioactive Materials Transport in Tunnel FiresWatabe, N. / Suzuki, H. et al. | 1996
- 1058
-
Risk/Cost Analysis: A Case Scenario in the Decommissioning of a Radiological SiteThompson, A. J. / Chambers, D. B. / Wiatzka, G. M. et al. | 1996
- 1066
-
Probabilistic Criticality Assessment for a DOE Order 5480.23 Safety Analysis of a Spent Fuel Storage Facility (U)O'Kula, K. R. / Paddleford, D. F. / Williamson, T. G. / Garrett, R. L. et al. | 1996
- 1075
-
Joint USNRC/EC Consequence Uncertainty Analysis: An OverviewLui, C. H. / Harper, F. T. / Goossens, L. H. J. / Kelly, G. N. et al. | 1996
- 1083
-
Joint USNRC/EC Consequence Uncertainty Study: The Ingestion Pathway, Dosimetry and Health Effects Expert Judgment Elicitations and ResultsHarper, F. / Goossens, L. / Abbott, M. / Boardman, J. et al. | 1996
- 1089
-
Overview of MACCS and MACCS2 Development EffortsYoung, M. / Chanin, D. et al. | 1996
- 1096
-
A Comparison of NUREG/CR-4214 and BEIR-V Health Effects Models for Nuclear Accident Consequence Analysis in Hong KongYeung, M. R. / Yang, L. / Walton, A. et al. | 1996
- 1107
-
Prospects for Standardizing Data Analysis in PRAMosleh, A. et al. | 1996
- 1115
-
A PSA Application at the South Texas Project Electric Generating Station: Generic Letter 89-10 MOV PrioritizationBidwell, D. A. / Grantom, C. R. / Fleming, K. N. et al. | 1996
- 1123
-
Risk-Based Optimization of In-Service TestingHamzehee, H. G. / Karpyak, S. D. / Tirsun, D. M. / Parkinson, B. et al. | 1996
- 1128
-
Risk-Informed Improvement of the Nuclear Power Plant Reactor Containment Leakage Rate Test Program at the South Texas Project Electric Generating StationLiming, J. K. / Loh, W. T. / Lardner, W. T. / Modenhauer, A. C. et al. | 1996
- 1134
-
Insights on the Use of a Large Cut Set Equation to Quantify Risk Associate with Different On-Line Maintenance ConfigurationsKrueger, G. A. / Vanover, D. E. et al. | 1996
- 1143
-
Response Surface Approach for Level 2 AnalysisSummitt, R. et al. | 1996
- 1150
-
Applications of the ATRD Model for Expert Opinion UtilizationPetkov, G. I. et al. | 1996
- 1158
-
Models for the Analysis of Precursor Data that Preserve Inequality RelationshipsYi, W. / Bier, V. M. et al. | 1996
- 1167
-
Quantitative Hazard Assessment of a US Department of Energy Nuclear Explosive OperationO'Brien, D. / Fischer, S. R. / Gerdes, E. R. et al. | 1996
- 1174
-
Interim Guidance Risk Assessment of the Device Assembly Facility at the Nevada Test SiteAltenbach, T. J. et al. | 1996
- 1185
-
Lessons Learned from CORA ProgramHagen, S. / Hofmann, P. / Noack, V. / Schanz, G. et al. | 1996
- 1193
-
Lessons from PHEBUS FPT0 Experimental ResultsGonnier, C. / Repetto, G. / Clement, B. / Von der Hardt, P. et al. | 1996
- 1206
-
Boiling Heat Transfer in Narrow Spaces and Its Implications for Lower Head Integrity During a Severe AccidentBang, K. H. / Lee, S. J. / Kang, K. H. / Sub, K. Y. et al. | 1996
- 1215
-
The Effects of Combining Subjective Uncertainty, Stochastic Variability, and DependenceCooper, J. A. et al. | 1996
- 1219
-
Quantitative Analysis of Model Uncertainty: Estimating the Credibility of Alternate Model StructuresZio, E. et al. | 1996
- 1227
-
Reduction of the Ignalina Nuclear Power Plant PSA Results UncertaintyAugutis, J. et al. | 1996
- 1232
-
An Overview of the Risk Uncertainty Assessment Process for the Cassini Space MissionWyss, G. D. et al. | 1996
- 1243
-
Standardizing Human Reliability Analysis-Issues and SuggestionsParry, G. W. et al. | 1996
- 1250
-
Prospects for Standardizing PSA Methodologies for External Natural Phenomena EventsBudnitz, R. J. et al. | 1996
- 1257
-
Prospects for Standardizing Approaches for Establishing Risk ImportanceWakefield, D. J. et al. | 1996
- 1267
-
Technical Specification Action Requirements for AFW System Failures: Method Development and Application to Four PWR PlantsMankamo, T. / Kim, I. S. / Yang, J. W. / Samanta, P. K. et al. | 1996
- 1274
-
Risk-Informed Improvement of Nuclear Power Plant Inservice Test and Inspection Programs at the South Texas Project Electric Generating StationLiming, J. K. / Loh, W. T. / Lardner, W. M. / Modenhauer, A. C. et al. | 1996
- 1279
-
Evaluation of Instrumentation Surveillance Test Intervals at the San Onofre Nuclear Generating Station Using a Blended ApproachSanders, G. R. / Bokhorst, R. M. / Dykes, A. A. / Quinn, E. L. et al. | 1996
- 1287
-
Quantitative Allocation of Radiation Protection Resources-ALARAHardy, B. L. / Sandquist, G. M. / Rogers, V. C. et al. | 1996
- 1295
-
The Application of Risk Technology to Non-Nuclear, Hazardous Material Assessment at Nuclear Power PlantsKlopp, G. T. et al. | 1996
- 1301
-
Holistic and Partial System Models in Safety AnalysisGorski, J. / Nowicki, B. / Wardzinski, A. et al. | 1996
- 1313
-
Defense Waste Processing Facility Probabilistic Safety AnalysisBlanton, C. H. / Gough, S. T. / Taylor, R. P. / Massey, W. M. et al. | 1996
- 1318
-
Phenomenological Analyses and Their Application to the Defense Waste Processing Facility Probabilistic Safety Analysis Accident Progression Event TreeKalinich, D. A. / Thomas, J. K. / Gough, S. T. / Bailey, R. T. et al. | 1996
- 1326
-
The Use of Long-Term Meteorological Information to Predict Impact Probabilities Resulting from Toxic Chemical ReleasesStuart, A. L. / Jain, S. / Libicki, S. B. et al. | 1996
- 1333
-
Evolution of Hazards Analysis Process at the Savannah River SiteLow, J. M. / Hovis, G. / Copeland, J. / Voss, R. et al. | 1996
- 1343
-
The First Results from the ACOPO ExperimentTheofanous, T. G. / Maguire, M. / Angelini, S. / Salmassi, T. et al. | 1996
- 1351
-
An Overview of the FARO and KROTOS Test ResultsMagallon, D. / Huhtiniemi, I. / Hohmann, H. et al. | 1996
- 1359
-
Experiments on Melt Jet Impingement and Vessel Hole Ablation PhenomenaGreen, J. / Dong, W. / Dinh, T. N. / Sehgal, B. R. et al. | 1996
- 1367
-
In-Vessel Debris Coolability Experiments in ALPHA ProgramMaruyama, Y. / Yamano, N. / Moriyama, K. / Park, H. S. et al. | 1996
- 1377
-
Perspective Gained from Individual Plant Examination of External Events (IPEEE) Seismic ReviewChen, J. T. / Swell, R. T. / Bohn, M. P. / Chokshi, N. et al. | 1996
- 1384
-
Perspective Gained from Individual Plant Examination of External Events (IPEEE) Fire ReviewConnell, E. A. / Kazarians, M. / Lambright, J. A. / Nowlen, S. P. et al. | 1996
- 1390
-
SONGS 2/3 Seismic IPEEE Core Damage Risk in a High Seismic RegionChung, G. / Yee, T. / Moore, D. et al. | 1996
- 1399
-
Standardizing PSA Methods Through Owners Group ComparisonsLeserman, T. / Andre, G. / Remlinger, D. et al. | 1996
- 1402
-
Risk-Based Regulation and PRA Application StandardsZamanali, J. et al. | 1996
- 1405
-
Building the Infra-Structure to Achieve Technical Quality in PRAsKiper, K. L. et al. | 1996
- 1411
-
Individual Plant Examinations Perspectives on Reactor SafetyDrouin, M. T. / Camp, A. L. / Lehner, J. / Dingman, S. et al. | 1996
- 1418
-
Human Action Perspectives Based on Individual Plant Examination ResultsForester, J. / Drouin, M. / Thompson, C. / Lois, E. et al. | 1996
- 1426
-
Core Damage Frequency Perspectives Based on IPE ResultsDingman, S. E. / LaChance, J. L. / Camp, A. L. / Drouin, M. T. et al. | 1996
- 1434
-
The IPE Database: Providing Information on Plant Design, Core Damage Frequency and Containment PerformanceLehner, J. R. / Lin, C. C. / Pratt, W. T. / Su, T. et al. | 1996
- 1443
-
Severe Accident Progression Perspectives Based on IPE ResultsLehner, J. R. / Lin, C. C. / Pratt, W. T. / Drouin, M. et al. | 1996
- 1453
-
Systematic Generation of Software Failure Mode and Effects Analysis for Fault Tolerant SoftwareClark, A. / Smidts, C. et al. | 1996
- 1461
-
A Strategy for Developing and Demonstrating Highly Reliable Nuclear SoftwareGolay, M. W. / Lunglhofer, J. / Ouyang, M. et al. | 1996
- 1466
-
A Probabilistic Analysis of Human Intelligence Losses from a Secure Information SystemBott, T. F. et al. | 1996
- 1472
-
PSA Study of Digital Reactor Protection SystemItami, Y. / Utsumi, M. et al. | 1996
- 1483
-
The Computation of Time Dependent Event TreesDevooght, J. et al. | 1996
- 1490
-
A Monte Carlo Dynamic PSA Study of a PWR PressurizerLabeau, P. E. et al. | 1996
- 1497
-
Development of Accident Sequences Dynamic Simulation Model and Example ApplicationsChao, C.-C. / Lee, M. et al. | 1996
- 1507
-
Integrated Sequence Analysis - Semidynamic Analysis of an SGTR SequenceAndersson, K. / Andersson, S.-O. / Edland, A. / Hollnagel, E. et al. | 1996
- 1515
-
Time-Dependent Reliability Calculations of the Ignalina Nuclear Power Plant Accident Confinement SystemKopustinskas, V. / Uspuras, E. et al. | 1996
- 1523
-
Analysis of the Shroud Head Spray for Oskarshamn 1Bachofner, E. / Dubik, H. / Henry, R. E. et al. | 1996
- 1530
-
Development of Severe Accident Analysis Code for Advanced Thermal Reactors (ATR)Ikeda, H. / Sotsu, M. / Kumasaka, K. / Mizuno, K. et al. | 1996
- 1540
-
Containment Behavior of the FUGEN NPPKobari, M. / Sakurai, N. / Nishimura, H. / Mochizuki, H. et al. | 1996
- 1548
-
Analytical Study on Depressurization During PWR Station BlackoutHidaka, A. / Ezzidi, A. / Sugimoto, J. et al. | 1996
- 1557
-
A Direct Comparison of MELCOR 1.8.3 and MAAP4 Results for Several PWR & BWR Accident SequencesLeonard, M. T. / Ashbaugh, S. G. / Cole, R. K. / Bergeron, K. D. et al. | 1996
- 1565
-
Uncertainty: Call Risk Informed Regulation Survive the ChallengeBurns, E. T. / Lee, L. K. et al. | 1996
- 1575
-
Bayesian Risk-Based Acceptance CriteriaMartz, H. F. / Abramson, L. R. / Johnson, J. W. et al. | 1996
- 1584
-
Uncertainties in Repository ModelingWilson, J. R. et al. | 1996
- 1588
-
Visualizing Risk ResultsKarner, J. S. / Follen, S. M. et al. | 1996
- 1597
-
PRA Standardization: Perspectives from NRC ResearchCunningham, M. A. / Drouin, M. T. / Ramey-Smith, A. M. / Chow, E. T. et al. | 1996
- 1601
-
Regulatory Guidance and Preconditions for PSAs in The NetherlandsVersteeg, M. F. et al. | 1996
- 1608
-
Reviewer's Perspective: Prioritization Using Risk-Based Methods Within a Regulatory EnvironmentBolig, C. / Stack, D. W. et al. | 1996
- 1617
-
Guidelines and Licensing Considerations to Relax Allowed Outage Times: A Case Study of the DHR/LPI System in B&W-Designed Nuclear Power PlantsLevinson, S. H. / Enzinna, R. S. et al. | 1996
- 1623
-
The Use of Risk Importances for Risk-Based Applications and Risk-Based RegulationsVesely, W. E. et al. | 1996
- 1632
-
Sensitivity of Optimal Maintenance Cost to Reliability ConstraintsHarunuzzaman, M. / Aldemir, T. et al. | 1996
- 1636
-
Use of PSA and Engineering Judgement in Improving Nuclear Power Plant PerformanceGatlin, D. / Lichtenstein, R. / Andre, G. / Haessler, R. et al. | 1996
- 1645
-
Analysis of Annual Accident Sequence Precursor Occurrence Rates for 1984-1994Rasmuson, D. M. / O'Reilly, P. D. et al. | 1996
- 1653
-
LER Screening Algorithm for Identification of Potential Accident Sequence Precursor EventsPoore, W. P. et al. | 1996
- 1657
-
Saphire Models and Software for ASP EvaluationsSattison, M. B. et al. | 1996
- 1664
-
Low-Power and Shutdown Models for the Accident Sequence Precursor (ASP) ProgramSattison, M. B. / Thatcher, T. A. / Knudsen, J. K. / Hyslop, J. S. et al. | 1996
- 1671
-
A Methodology for Analyzing Precursors to Fire-Initiated and Seismic-Initiated AccidentsBudnitz, R. J. / Apostolakis, G. / Salas, J. K. / Lambert, H. E. et al. | 1996
- 1679
-
Accident Sequence Precursor Analysis Level 2/3 Model DevelopmentLui, C. H. / Galyean, W. J. / Brown, T. D. / Brownson, D. A. et al. | 1996
- 1689
-
Safety Culture in the Nuclear Versus Non-Nuclear OrganizationHaber, S. B. / Shurberg, D. A. et al. | 1996
- 1697
-
Issues for Resolving Adverse Effects on the Safety Culture of Human Work Underload and Workload Transitions in Complex Human-Machine SystemsRyan, T. G. et al. | 1996
- 1702
-
Assessing Safety Culture as a Component of Risk AnalysisNuccio, E. J. et al. | 1996
- 1710
-
Enhancing the Flight Safety Culture Through TrainingKanki, B. G. et al. | 1996
- 1719
-
MELCOR Model Development and Accident Progression Analysis for the NPP Dukovany VVER-440/213 Level 2 PSADienstbier, J. / Rydl, A. / Wagner, K. C. / Clement, S. D. et al. | 1996
- 1726
-
Sensitivity Study of MELCOR Steam Generator Modeling for a Station Blackout Accident AnalysisChien, C.-S. / Wong, S.-J. / Wang, T.-C. et al. | 1996
- 1732
-
Model of Gas Mixing in a Steam Generator Inlet PlenumEpstein, M. / Henry, R. E. / Paik, C. Y. / Kenton, M. A. et al. | 1996
- 1741
-
A Study on Effectiveness of Inherent Heat Sinks and Their Cooling System During Loss of Feedwater Sequence at Wolsong PlantsKim, D. H. / Jin, Y. H. / Park, C. K. / Paik, C. Y. et al. | 1996
- 1748
-
Reactor Coolant System Response of the Oconee Pressurized Water Reactor During a Severe AccidentQuick, K. S. / Knudson, D. L. et al. | 1996
- 1759
-
PSA Supported Severe Accident Management Strategies for the Borssele NPPBorst, M. V. D. / Versteeg, M. F. et al. | 1996
- 1767
-
The Impact of Implementing Severe Accident Management Guidelines at KoebergPerryman, L. J. / Powell, P. / Kooyman, P. et al. | 1996
- 1775
-
A Benchmark Exercise on Expert Judgment Techniques in PSA Level 2: Design Criteria and General FrameworkCojazzi, G. / Pinola, L. / Sardella, R. et al. | 1996
- 1785
-
Panel Discussion on the Need and Feasibility of Developing PRA StandardsMosleh, A. / Holahan, G. / Cunningham, M. / Pietrangelo, T. et al. | 1996
- 1789
-
Use of PSA to Support Plant OperationsPutney, B. / Gough, W. S. / Parkinson, W. J. / Rahn, F. et al. | 1996
- 1793
-
Identification of Risk-Significant Circuit Breakers Using Top Event Prevention AnalysisBlanchard, D. P. / Brogan, B. A. / Worrell, R. B. et al. | 1996
- 1802
-
Risk Informed Inspection Strategies-10 CFR 50.65 Maintenance Rule Baseline InspectionsShackelford, J. L. / Wilson, P. R. et al. | 1996
- 1809
-
Emergency Diesel Generator Power System Reliability 1987-1993Galyean, W. J. / Poloski, J. P. / Grant, G. M. et al. | 1996
- 1817
-
Use of Risk-Based Event Analysis for Nuclear Power Plant Safety Performance AssessmentAbraham, P. M. / Tuckman, M. S. et al. | 1996
- 1823
-
Review and Updates of the Risk Assessment for Advanced Test Reactor Operations for Operating Events and ExperienceAtkinson, S. A. et al. | 1996
- 1831
-
A Review of Risk Assessment Methodologies in Oil Spill Prevention ApplicationsNovack, S. D. / Siu, N. O. / Hill, S. G. et al. | 1996
- 1841
-
ASME OM Code Case on Component Importance RankingRowley, C. W. / Zigler, G. L. et al. | 1996
- 1846
-
Risk Informed Decisions: IST Intervals Using a Blended ApproachBurns, E. T. / Lee, L. K. / Sellers, C. D. / Krueger, G. A. et al. | 1996
- 1853
-
The CEOG RB-IST Program for ECCS Check ValvesFinnicum, D. J. / Hackerott, A. / Barney, D. et al. | 1996
- 1863
-
The Use of PRA in Designing the Westinghouse AP600 PlantHaag, C. / Schulz, T. / Scobel, J. / Sancaktar, S. et al. | 1996
- 1869
-
Insights Gained from the Westinghouse AP600 PRAHaag, C. / Schulz, T. / Scobel, J. / Sancaktar, S. et al. | 1996
- 1876
-
The Station Blackout Mitigation Concept in he Design of the EPRCaron, J.-L. / Ellia-Hervy, A. / Feigel, A. / Soursou, E. et al. | 1996
- 1881
-
Incorporation of Piping System Failures in PSA: Some Basic Analysis ConsiderationsNyman, R. / Lydell, B. O. Y. / Tomic, B. et al. | 1996
- 1891
-
Probabilistic Performance Assessment of Remediation Options for a Uranium Mill Tailings Impoundment in Eastern GermanyKossik, R. / Miller, I. / Voss, C. / Pelz, F. et al. | 1996
- 1899
-
Multi-Attribute Decision Analysis of Remediation Options for a Uranium Mill Tailings Impoundment in Eastern GermanyRoberds, W. / Voss, C. / Jakubick, A. / Kunze, C. et al. | 1996
- 1907
-
Simplified Risk Model for Waste Management and Environmental Restoration ActivitiesEide, S. / Smith, T. / Peatross, R. / Stepan, I. et al. | 1996
- 1912
-
Moving Towards Risk-Based Regulation of Mixed Waste in the United StatesPorter, C. L. et al. | 1996
- 1923
-
Regulation of Environmental, Safety, and Health Risks Using Risk Based Cost Benefit ProcessesUnione, A. J. / Erdmann, R. C. / Niblock, G. et al. | 1996
- 1927
-
The Use of the Risk-Based Applications in the Dukovany NPPVeleba, A. et al. | 1996
- 1935
-
Results of IPEEE for Comanche PeakHamzehee, H. G. et al. | 1996
- 1940
-
The Performance of the Temelin PSA and its Use for the Evaluation of Plant Safety UpgradesEvans, M. G. K. / Mlady, O. et al. | 1996
- 1946
-
Severe Accident Management Guideline Validation: Important Aspects and Maximizing the BenefitsHolderbaum, D. F. / Lutz, R. J. et al. | 1996
- 1954
-
Evidentiary Standards for the Regulatory Use of Mathematical Risk ModelsBrannigan, V. M. et al. | 1996
- 1962
-
The Potential for Risk-Based Management of Military Ordnance SafetyUnione, A. / Michelson, G. / Frazier, J. et al. | 1996
- 1967
-
Comparison of Remedial Action Alternatives Based on Worker RiskUnione, A. / Marty, R. / Ricke, T. et al. | 1996