Proceedings of the 17th International Conference on Flexible Automation and Intelligent Manufacturing, FAIM 2007 : June 18 - 20, 2007, Philadelphia, USA / Penn State Great Valley. Ed.: Robin G. Qiu ... ; Vol. 1 (English)

2007

How to get this document?

Local TIB services

1 Copy

thereof 1 orderable

TIB document delivery Purchase
  • Title:
    Proceedings of the 17th International Conference on Flexible Automation and Intelligent Manufacturing, FAIM 2007 : June 18 - 20, 2007, Philadelphia, USA / Penn State Great Valley. Ed.: Robin G. Qiu ... ; Vol. 1
  • Author / Creator:
  • Contributors:
  • Conference:
    International Conference on Flexible Automation and Intelligent Manufacturing ; 17; 2007; Malvern, Philadelphia, Pa.
    FAIM ; 17; 2007; Malvern, Philadelphia, Pa.
  • Place of publication:
    Philadelphia, Pa.
  • Year of publication:
    2007
  • Size:
    XX, 612, VI S.
  • ISBN:
  • Type of media:
    Conference Proceedings
  • Type of material:
    Print
  • Language:
    English
  • Keywords:
  • Classification:
    BKL:    52.72 Fertigungsautomatisierung
  • Source:
  • Export:

Table of contents conference proceedings

The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.

91
Simulation, modelling and analysis of key JIT drivers in an automotive component manufacturing environment
Sandanayake, Y.G. / Oduoza, C.F. / Proverbs, D.G. | 2007
124
Simulation-based scheduling of assembly operations and logistics
Weigert, Gerald / Henlich, Thomas | 2007
166
Novel scan path generation method based on area division for SFFS
Choi, Kyung-Hyun / Kim, Hyung-Chan / Doh, Yang-Hoi / Kim, Dong-Soo | 2007
184
Reconstruction of curves from point clouds
Deng, Yong / Zhu, Daxin | 2007
211
A surface roughness prediction model for the ballnose machining of polypropylene
Dhokia, Vimal G. / Kumar, Sanjeev / Vichare, Parag / Newman, Stephen T. | 2007
219
A hierarchical case process knowledge model for supporting rapid process configuration
Zheng, Lianyu / Dong, Hongfei / Vichare, Parag / Nassehi, Aydin / Newman, Stephen T. | 2007
227
Network modeling for system interaction representation in product development
Murat, Alper E. / Kim, Kyoung-Yun / Monplaisir, Leslie / Yadav, Om P. | 2007
282
Ontology-based approach to differentiate assembly joints for collaborative and intelligent product design
Kim, Kyoung-Yun / Kim, Yun Seon / Choi, Keundo / Yang, Hyung-Jeong | 2007
349
A heuristic procedure to determine the number of kanbans in an unstable multi stage productive system
Iannone, Raffaele / Miranda, Salvatore / Riemma, Stefano | 2007
421
End turning surface finish using design of combined process of grinding and electrochemical smoothing
Pa, P.S. | 2007
429
Process planning for 2 1/2D pocket machining: A review
Banerjee, Avisekh / Feng, Hsi-Yung / Bordatchev, Evgueni | 2007
439
Process planning for 2 1/2D pocket machining: A novel integrated framework
Banerjee, Avisekh / Feng, Hsi-Yung / Bordatchev, Evgueni V. | 2007
446
New 3DP process technique of SFF system using a photopolymer resin and a powder
Kim, Dong-Soo / Kim, Jung-Su / Lee, Min-Cheol | 2007
453
Near net shape technology: An innovative opportunity for the automotive industry
Cominotti, R. / Gentili, E. | 2007
484
Investigation into electrochemical micro drilling of copper
Malapati, M. / Bhattacharyya, B. | 2007
531
A case study of optimal disassembly planning
Grochowski, David E. / Tang, Ying | 2007
539
Financial impacts of increasing tactical capacity planning frequency in a semiconductor company
Ashayeri, J. / Lemmens, L. | 2007
557
Optimal workforce allocation for assembly lines for highly customised low-volume products
Hytönen, Joni / Niemi, Esko | 2007
621
Integrative planning and design of logistics structures and production plants in competence-cell-based networks
Müller, Egon / Horbach, Sebastian / Ackermann, Jörg | 2007
651
Measurement path generation of an impeller on a coordinate measurement machine with a rotating/tilting probe
Yang, Il-Hwan / Heo, Eun-Young / Kim, Dong-Won / Kim, Bo-Hyun / Lee, Hyung-Lo | 2007
707
Supervisory control of a multi-echelon supply chain: Structure, modeling, performance measures and system analysis for interorganizational control
Drzymalski, Julie / Odrey, N.G. | 2007
749
Customers service in an internal supply chain management approach: Case study
Naoui, Fatiha | 2007
757
A framework of assembly design and maintenance analysis and fault diagnosis using Bayesian Belief Network and fuzzy cognitive map
Kim, Kyoung-Yun / Kim, Yun Seon / Cheah, Woo Ping / Yang, Hyung-Jeong | 2007
781
Reconfigurable macro-processor - cost-efficient platform for rapid prototyping
Kirischian, Valeri / Geurkov, Vadim / Chun, Pill Woo / Kirischian, Lev | 2007
789
Rfid-enabled real-time wireless manufacturing for adaptive assembly planning and control
Huang, George Q. / Zhang, Y.F. | 2007
820
Selection of an optimal radio frequency identification tag system to support product lifecycle management
Michael, Shamone / Ram, Bala / Stanfield, Paul / Davis, Lauren / Samanlioglu, Funda | 2007
843
Optimization of MQL for desired surface roughness in drilling using fuzzy logic
Nandi, Arup Kumar / Davim, J. Paulo | 2007
859
A tolerance method for image-based industrial inspection
Jia, Haibin / Xi, Jeff / Ghasempoor, Ahmad / Dawoud, Amer / Yang, Jianwu | 2007
883
The research on shop floor manufacturing system based on real-time information for discrete manufacturing industry
Jia, Xiaoliang / Zhang, Zhenming / Tian, Xitian | 2007
988
Modeling of quasi-transportation problem and a genetic algorithm with matrix representation for multi-plant order allocation problem
Yang, Feng-Cheng / Wang, Ming-Tzong / Chen, Kuentai / Chang, Ping-Yu / Lin, Tzu-Chieh | 2007
1034
A model for the IT-supported integration of social compatibilities and competencies in virtual enterprises
Zimmermann, Matthias / Burghardt, Thomas / Teich, Tobias | 2007
1065
Supporting the variety steering process of complex individual components by the evaluation of construction notifications
Teich, Tobias / Oestreich, Erik | 2007
1105
Service-oriented Architectures (SOA), a management and system concept for order-related, temporary networks
Burghardt, Thomas / Zimmermann, Matthias / Fischer, Marco / Zschorn, Lars | 2007
1128
Geometrical inaccuracies and tolerances in microassembly
Ahamed, S.S. / Pardasani, A. / Kowala, S. | 2007
Feedback