Differences Between Full Power Operation and Low Power / Shutdown Operation, and the Implications on the LPSD Standard (Englisch)
- Neue Suche nach: Bley, D.
- Neue Suche nach: Burchill, B.
- Neue Suche nach: Drouin, M.
- Neue Suche nach: Julius, J.
- Neue Suche nach: Kiper, K.
- Neue Suche nach: Stillwell, B.
- Neue Suche nach: International Association for PSAM
- Neue Suche nach: European Safety and Reliability Association
- Neue Suche nach: Bley, D.
- Neue Suche nach: Burchill, B.
- Neue Suche nach: Drouin, M.
- Neue Suche nach: Julius, J.
- Neue Suche nach: Kiper, K.
- Neue Suche nach: Stillwell, B.
- Neue Suche nach: International Association for PSAM
- Neue Suche nach: European Safety and Reliability Association
In:
Probabilistic safety assessment and management; PSAM7 - ESREL'04
;
1906-1911
;
2004
- Aufsatz (Konferenz) / Print
-
Titel:Differences Between Full Power Operation and Low Power / Shutdown Operation, and the Implications on the LPSD Standard
-
Beteiligte:Bley, D. ( Autor:in ) / Burchill, B. ( Autor:in ) / Drouin, M. ( Autor:in ) / Julius, J. ( Autor:in ) / Kiper, K. ( Autor:in ) / Stillwell, B. ( Autor:in ) / International Association for PSAM / European Safety and Reliability Association
-
Kongress:7th:; International conference, Probabilistic safety assessment and management; PSAM7 - ESREL'04 ; 2004 ; Berlin, Germany
-
Erschienen in:PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT ; 4 ; 1906-1911
-
Verlag:
- Neue Suche nach: Springer,
-
Erscheinungsort:London:
-
Erscheinungsdatum:01.01.2004
-
Format / Umfang:6 pages
-
Anmerkungen:Held jointly with the European safety and reliability conference
-
Medientyp:Aufsatz (Konferenz)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.