A bi-objective genetic algorithm approach to risk mitigation in project scheduling (Englisch)
- Neue Suche nach: Kilic, M.
- Neue Suche nach: Ulusoy, G.
- Neue Suche nach: Serifoglu, F.S.
- Neue Suche nach: Kilic, M.
- Neue Suche nach: Ulusoy, G.
- Neue Suche nach: Serifoglu, F.S.
- Neue Suche nach: Artiba, A.
- Neue Suche nach: Aghezzaf, E.-H.
In:
Industrial engineering and systems management; Recent developments in the design, control, planning and scheduling of productive systems
1
;
202-216
;
2008
-
ISSN:
- Aufsatz (Konferenz) / Print
-
Titel:A bi-objective genetic algorithm approach to risk mitigation in project scheduling
-
Beteiligte:Kilic, M. ( Autor:in ) / Ulusoy, G. ( Autor:in ) / Serifoglu, F.S. ( Autor:in ) / Artiba, A. / Aghezzaf, E.-H.
-
Kongress:International Conference, Industrial engineering and systems management; Recent developments in the design, control, planning and scheduling of productive systems ; 2005 ; Marrakech, Morocco
-
Erschienen in:INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS ; 112, 1 ; 202-216
-
Verlag:
- Neue Suche nach: Elsevier
-
Erscheinungsdatum:01.01.2008
-
Format / Umfang:15 pages
-
Anmerkungen:Known as IESM 05
-
ISSN:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.