A water-flow algorithm for flexible flow shop scheduling with intermediate buffers (Englisch)
- Neue Suche nach: Tran, T. H.
- Neue Suche nach: Ng, K. M.
- Neue Suche nach: Tran, T. H.
- Neue Suche nach: Ng, K. M.
In:
JOURNAL OF SCHEDULING
;
14
, 5
;
483-500
;
2011
-
ISSN:
- Aufsatz (Zeitschrift) / Print
-
Titel:A water-flow algorithm for flexible flow shop scheduling with intermediate buffers
-
Beteiligte:Tran, T. H. ( Autor:in ) / Ng, K. M. ( Autor:in )
-
Erschienen in:JOURNAL OF SCHEDULING ; 14, 5 ; 483-500
-
Verlag:
- Neue Suche nach: Springer Science + Business Media
-
Erscheinungsdatum:01.01.2011
-
Format / Umfang:18 pages
-
ISSN:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Print
-
Sprache:Englisch
- Neue Suche nach: 004.3
- Weitere Informationen zu Dewey Decimal Classification
-
Klassifikation:
DDC: 004.3 -
Datenquelle:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Inhaltsverzeichnis – Band 14, Ausgabe 5
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 407
-
PrefaceBlazewicz, Jacek / Drozdowski, Maciej / Kendall, Graham / McCollum, Barry et al. | 2011
- 409
-
A comparison of two methods for reducing take-off delay at London Heathrow airportAtkin, Jason A. D. / Burke, Edmund K. / Greenwood, John S. et al. | 2011
- 423
-
Case studies of successful train crew scheduling optimisationKwan, Raymond S. K. et al. | 2010
- 435
-
Parallel machine problems with equal processing times: a surveyKravchenko, Svetlana A. / Werner, Frank et al. | 2011
- 445
-
Three heuristic procedures for the stochastic, two-machine flow shop problemBaker, Kenneth R. / Trietsch, Dan et al. | 2010
- 455
-
A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due datesShabtay, Dvir / Steiner, George et al. | 2010
- 471
-
Scheduling two agents on uniform parallel machines with makespan and cost functionsElvikis, Donatas / Hamacher, Horst W. / T’kindt, Vincent et al. | 2010
- 483
-
A water-flow algorithm for flexible flow shop scheduling with intermediate buffersTran, Trung Hieu / Ng, Kien Ming et al. | 2010
- 501
-
Isomorphic coupled-task scheduling problem with compatibility constraints on a single processorSimonin, G. / Darties, B. / Giroudeau, R. / König, J.-C. et al. | 2010
- 511
-
Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delaysBenabid, Abir / Hanen, Claire et al. | 2011