Bitte wählen Sie ihr Lieferland und ihre Kundengruppe
A fully integrated loop operation test of Tritium systems Test Assembly (TSTA) with 107 grams of tritium was completed at Los Alamos National Laboratory (LANL) in June, 1988. In this test, a compound cryopump with a charcoal panel was incorporated into the main process loop for the first time. The objectives were to demonstrate the compound cryopump system with different flow rates and impurities, to demonstrate the regeneration of the compound cryopump system, to accumulate operating experience with other process systems such as the fuel cleanup system, the isotope separation system, the tritium supply and recovery system, etc. and to improve the data-base on TSTA safety systems such as the secondary containment system, tritium waste treatment system and tritium monitoring system. This report briefly describes characteristics of the main subsystems observed during the milestone run. (ERA citation 14:023863)