Work on the design of an on-site fuel cell total energy system for an apartment building is described. A mass and energy balance was completed for one operating point of a selected power generation sub-system with a power output of 119 kW. Potentially, 87 percent of the LHV of the input fuel is available as bus bar electricity or useful heat. A 2 kW stack of conventional design and a 0.5 kW DIGAS cooled stack have been constructed and are on test at ERC. Renovation of a space for the Westinghouse stack test facility is underway and procurement of equipment has been initiated. The coupled cell temperature - current density analysis has been modified to include the effects of turbulent coolant flow and extended to permit analysis of up to 10 process plates between cooling plates. The REFORM computer program was verified by comparison with data received from the government project manager. A method for predicting carbon deposition was developed and compared with data from the literature. (ERA citation 06:002486)