A high altitude test cell is being constructed in China with continuous air supply. In an effort to develop China's aviation industry, considerable design and preparation work had been done before a decision was reached to begin construction. The tuning and testing equipment and system performance began in 1980; the results showed that design requirements were met. Initially, the test cell was used to conduct tests of direct engine exhaust into the atmosphere. In particular, the high altitude performance tests of a certain engine in a uniform flow field and its certification test in a distorted flow field were successfully completed. Now the second phase of the construction has begun, and the entire facility is expected to be completed and ready for service shortly.