Bitte wählen Sie ihr Lieferland und ihre Kundengruppe
This report summarizes Operational Test and Evaluation (OTE) activities for the New Generation Runway Visual Range (RVR) system. Testing consisted of an initial OTR seven individual retests and several specialized tests. DOT/FAA/CT-Th92/37 provides results of the initial OTE conducted in March 1992. This document summarizes results of seven retests as well as specialized tests conducted from August 1992 through June 1994. The purpose and intent of OTE was to verify RVR National Airspace Requirements (NAS) and to verify the operational effectiveness and suitability of the RVR within the NAS environment At the completion of the retest and specialized test efforts results indicated that the most significant sensor and system problems had been resolved via permanent design changes as well as interim 'work-arounds.' It was recommended that the RVR system be deployed nationally under the following conditions: (a) Additional data be obtained indicating RVR performance during Category IIb visibility; and (b) Problems currently having interim work-around solutions be resolved with permanent corrections. This volume contains appendices H through K referenced in Volume L.