Validating a model of cooperative procurement in the construction industry (Englisch)
- Neue Suche nach: Pesämaa, Ossi
- Neue Suche nach: Pesämaa, Ossi
- Neue Suche nach: Eriksson, Per Erik
- Neue Suche nach: Hair, Joseph F.
In:
International journal of project management
;
27
, 6
; 552-559
;
2009
-
ISSN:
- Aufsatz (Zeitschrift) / Print
-
Titel:Validating a model of cooperative procurement in the construction industry
-
Beteiligte:
-
Erschienen in:International journal of project management ; 27, 6 ; 552-559
-
Verlag:
- Neue Suche nach: Elsevier
-
Erscheinungsort:Amsterdam [u.a.]
-
Erscheinungsdatum:2009
-
ISSN:
-
ZDBID:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Print
-
Sprache:Englisch
- Neue Suche nach: 85.06 / 85.00 / 85.06
- Weitere Informationen zu Basisklassifikation
- Neue Suche nach: 275/1920/1960
-
Schlagwörter:
-
Klassifikation:
BKL: 85.06 / 85.00 / 85.06 Unternehmensführung Lokalklassifikation TIB: 275/1920/1960 -
Datenquelle:
Inhaltsverzeichnis – Band 27, Ausgabe 6
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 543
-
Second Special Edition for Excellence in Teaching and Learning Project ManagementAtkinson, Dr Roger et al. | 2009
- 544
-
Design professionals’ legal risks increased under nature’s attack: Chichi Earthquake experienceHuang, Yu-Lin et al. | 2009
- 552
-
Validating a model of cooperative procurement in the construction industryPesämaa, Ossi et al. | 2009
- 560
-
Taxonomy for change causes and effects in construction projectsSun, Ming et al. | 2009
- 573
-
Can the pilot BOT Project provide a template for future projects? A case study of the Chengdu No. 6 Water Plant B ProjectChen, Chuan et al. | 2009
- 584
-
Research on project selection system of pre-evaluation of engineering design project biddingWang, Jin et al. | 2009
- 600
-
A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solutionWuliang, Peng et al. | 2009
- 610
-
Application of the graph theory and matrix methods to contractor rankingDarvish, Maryam et al. | 2009
- 620
-
A heuristic project scheduling approach for quick response to maritime disaster rescueYan, Liang et al. | 2009
- 629
-
Impact of corporate strengths/weaknesses on project management competenciesIsik, Zeynep et al. | 2009
- 638
-
Trust in projects: An empirical assessment of owner/contractor relationshipsPinto, Jeffrey K. et al. | 2009
-
Editorial Board| 2009