Optimisation of business process designs: An algorithmic approach with multiple objectives (Englisch)
- Neue Suche nach: Vergidis, K.
- Neue Suche nach: Tiwari, A.
- Neue Suche nach: Majeed, B.
- Neue Suche nach: Roy, R.
- Neue Suche nach: Vergidis, K.
- Neue Suche nach: Tiwari, A.
- Neue Suche nach: Majeed, B.
- Neue Suche nach: Roy, R.
In:
International Journal of Production Economics
;
109
, 1/2
;
105-121
;
2007
-
ISSN:
- Aufsatz (Zeitschrift) / Print
-
Titel:Optimisation of business process designs: An algorithmic approach with multiple objectives
-
Beteiligte:Vergidis, K. ( Autor:in ) / Tiwari, A. ( Autor:in ) / Majeed, B. ( Autor:in ) / Roy, R. ( Autor:in )
-
Erschienen in:International Journal of Production Economics ; 109, 1/2 ; 105-121
-
Verlag:
-
Erscheinungsdatum:2007
-
Format / Umfang:17 Seiten, 9 Bilder, 4 Tabellen, 24 Quellen
-
ISSN:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis – Band 109, Ausgabe 1/2
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
Cost EngineeringRoy, Rajkumar et al. | 2007
- 2
-
Concurrent cost engineering for decisional and operational process enhancement in a foundryBernard, A. / Perry, N. / Delplace, J.C. et al. | 2006
- 12
-
Concurrent cost estimation as a tool for enhanced producibility—System development and applicability for producibility studiesElgh, Fredrik / Cederfeldt, Mikael et al. | 2006
- 27
-
Integrated digital design for manufacture for reduced life cycle costCurran, R. / Gomis, G. / Castagne, S. / Butterfield, J. / Edgar, T. / Higgins, C. / McKeever, C. et al. | 2006
- 41
-
Identifying and removing error in hierarchical cost estimatesKoonce, D.A. / Gandhi, R.P. / Nambiar, A.N. / Judd, R.P. et al. | 2006
- 53
-
Artificial neural networks as cost engineering methods in a collaborative manufacturing environmentWang, Qing et al. | 2006
- 65
-
Design requirements change and cost impact analysis in airplane structuresRios, J. / Roy, R. / Lopez, A. et al. | 2006
- 81
-
Axiomatic design as support for decision-making in a design for manufacturing context: A case studyGonçalves-Coelho, A.M. / Mourão, António J.F. et al. | 2006
- 90
-
Development of value chain collaborative model for product lifecycle management and its LCD industry adoptionChiang, Tzu-An / Trappey, Amy J.C. et al. | 2006
- 105
-
Optimisation of business process designs: An algorithmic approach with multiple objectivesVergidis, K. / Tiwari, A. / Majeed, B. / Roy, R. et al. | 2006
- 122
-
On the measurement of routing flexibility: A multiple attribute approachChang, An-Yuan et al. | 2006
- 137
-
Base stock inventory policies for a multi-item demand processHill, R.M. / Pakkala, T.P.M. et al. | 2006
- 149
-
Firm and time varying technical and allocative efficiency: An application to port cargo handling firmsRodríguez-Álvarez, Ana / Tovar, Beatriz / Trujillo, Lourdes et al. | 2006
- 162
-
Coordination of supply chain after demand disruptions when retailers competeXiao, Tiaojun / Qi, Xiangtong / Yu, Gang et al. | 2006
- 180
-
A note on a fully polynomial-time approximation scheme for parallel-machine scheduling with deteriorating jobsKang, Liying / Ng, C.T. et al. | 2006
- 185
-
Setting the holding cost rates in a two-product system with remanufacturingÇorbacıoğlu, Umut / van der Laan, Erwin A. et al. | 2006
- 195
-
An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory systemAl-Rifai, Mohammad H. / Rossetti, Manuel D. et al. | 2006
- 214
-
Single-machine scheduling with multiple performance measures: Minimizing job-dependent earliness and tardiness subject to the number of tardy jobsChen, Wei-Yang / Sheen, Gwo-Ji et al. | 2007
- 230
-
A diagnostics design decision model for products under warrantyLiu, Zhi-Jie / Chen, Wei / Huang, Hong-Zhong / Yang, Bo et al. | 2006
- 241
-
An integrated vendor-managed inventory model for a two-echelon system with order cost reductionZhang, Tinglong / Liang, Liang / Yu, Yugang / Yu, Yan et al. | 2006
- 254
-
A note on “A DSS approach to managing customer enquiries for SMEs at the customer level enquiry stage”Framinan, Jose M. / Leisten, Rainer et al. | 2007
- 256
-
Erratum to “An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation”Lo, Sh-Tyan / Wee, Hui-Ming / Huang, Wen-Chang et al. | 2007
- 256
-
Erratum to "An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation":[Int. J. Product. Econ. 106(2), 493-505]Lo, S. T. / Wee, H. M. / Huang, W. C. et al. | 2007