Design and storage cycle time analysis for the automated storage system with a conveyor and a rotary rack (Englisch)
- Neue Suche nach: Hsieh, Y.J.
- Neue Suche nach: Chang, S.E.
- Neue Suche nach: Chang, S.C.
- Neue Suche nach: Hsieh, Y.J.
- Neue Suche nach: Chang, S.E.
- Neue Suche nach: Chang, S.C.
In:
International Journal of Production Research
;
45
, 22
;
5383-5395
;
2007
-
ISSN:
- Aufsatz (Zeitschrift) / Print
-
Titel:Design and storage cycle time analysis for the automated storage system with a conveyor and a rotary rack
-
Beteiligte:
-
Erschienen in:International Journal of Production Research ; 45, 22 ; 5383-5395
-
Verlag:
-
Erscheinungsdatum:2007
-
Format / Umfang:13 Seiten
-
ISSN:
-
Coden:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis – Band 45, Ausgabe 22
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 5177
-
Integrated approach to part scheduling and inspection policies for a job shop manufacturing systemGalante, G. et al. | 2007
- 5199
-
Developing exact and Tabu search algorithms for simultaneously determining AGV loop and P-D stations in single loop systemsZ-Farahani, R. et al. | 2007
- 5223
-
Tolerance design for the fit between bore and shaft for precision assemblies with significant error-scaling problemsSweet, Arnold et al. | 2007
- 5243
-
A local genetic approach to multi-objective, facility layout problems with fixed aislesYe, M. et al. | 2007
- 5265
-
Mixed-model assembly line sequencing using beam searchErel, Erdal et al. | 2007
- 5285
-
A cost-based methodology for evaluating product platform commonality sourcing decisions with two examplesMarion, T.J. et al. | 2007
- 5309
-
An alternative method to tolerance transfer for parts with 2D blueprintContreras, F.González et al. | 2007
- 5329
-
Aggregate and detailed production planning integrating procurement and distribution plans in a multi-site environmentKanyalkar, A.P. et al. | 2007
- 5355
-
Performance of serial assembly line designs under unequal operator speeds and learningMontano, A. et al. | 2007
- 5383
-
Design and storage cycle time analysis for the automated storage system with a conveyor and a rotary rackHsieh, Y.-J. et al. | 2007
- 5397
-
An alternative approach to test process capability for unilateral specification with subsamplesWu, Chien-Wei et al. | 2007
- 5417
-
Integration of production planning, project management and logistics systems for supply chain managementSamaranayake, P. et al. | 2007
- 5449
-
Book reviewNookabadi, A.S. et al. | 2007
- 5451
-
Environmental principles applicable to green supplier evaluation by using multi-objective decision analysisLu, Louis et al. | 2007