Modular fixture planning for minimum three-dimensional tolerances using a neutral part data exchange format (Englisch)
- Neue Suche nach: Bansal, S.
- Neue Suche nach: Malik, P.
- Neue Suche nach: Reddy, N.V.
- Neue Suche nach: Saxena, A.
- Neue Suche nach: Bansal, S.
- Neue Suche nach: Malik, P.
- Neue Suche nach: Reddy, N.V.
- Neue Suche nach: Saxena, A.
In:
International Journal of Production Research
;
46
, 6
;
1455-1476
;
2008
-
ISSN:
- Aufsatz (Zeitschrift) / Print
-
Titel:Modular fixture planning for minimum three-dimensional tolerances using a neutral part data exchange format
-
Beteiligte:Bansal, S. ( Autor:in ) / Malik, P. ( Autor:in ) / Reddy, N.V. ( Autor:in ) / Saxena, A. ( Autor:in )
-
Erschienen in:International Journal of Production Research ; 46, 6 ; 1455-1476
-
Verlag:
-
Erscheinungsdatum:2008
-
Format / Umfang:22 Seiten
-
ISSN:
-
Coden:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis – Band 46, Ausgabe 6
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1373
-
Framework for flexibility in dynamic supply chain managementWadhwa, S. et al. | 2008
- 1405
-
A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problemAgrawal, S. et al. | 2008
- 1431
-
Learning effective dispatching rules for batch processor schedulingGeiger, Christopher et al. | 2008
- 1455
-
Modular fixture planning for minimum three-dimensional tolerances using a neutral part data exchange formatBansal, S. et al. | 2008
- 1477
-
Integrating production-transportation planning decision with fuzzy multiple goals in supply chainsLiang, T.-F. et al. | 2008
- 1495
-
Optimal storage rack design for a 3-dimensional compact AS-RSde Koster, R.B.M. et al. | 2008
- 1515
-
A hint-based machining feature recognition system for 2.5D partsVerma, A.K. et al. | 2008
- 1539
-
Finite capacity scheduling with mixed duration tooling treesMartin, Rodney et al. | 2008
- 1567
-
Process flexibility with bill of material constraintsHua, Z. et al. | 2008
- 1587
-
Multi-objective design optimization of reconfigurable machine tools: a modified fuzzy-Chebyshev programming approachLiu, Wei et al. | 2008
- 1619
-
Modeling industrial lot sizing problems: a reviewJans, Raf et al. | 2008
- 1645
-
Assessing the effects of manufacturing infrastructure preparation prior to enterprise information-systems implementationLi, L. et al. | 2008
- 1667
-
Accounting-based heuristics for order processing and review in a stochastic environmentFry, Timothy et al. | 2008
- 1685
-
A methodology for cutting-tool management through the integration of CAPP and schedulingMeseguer, A. et al. | 2008
- 1707
-
Single machine group scheduling with family setups to minimize total tardinessGupta, Jatinder et al. | 2008