A Study on Production Lines with Discrete Batch Wip Inventory Transfer (Englisch)
- Neue Suche nach: Erel, E.
- Neue Suche nach: Erel, E.
- Neue Suche nach: Dar-el, E. M.
- Neue Suche nach: Karni, R.
- Neue Suche nach: Herer, Y. T.
In:
Production research
;
587-589
;
1995
-
ISBN:
- Aufsatz (Konferenz) / Print
-
Titel:A Study on Production Lines with Discrete Batch Wip Inventory Transfer
-
Beteiligte:
-
Kongress:13th International conference, Production research ; 1995 ; Jerusalem
-
Erschienen in:Production research ; 587-589
-
Verlag:
- Neue Suche nach: Fruend Publishing House
-
Erscheinungsdatum:01.01.1995
-
Format / Umfang:3 pages
-
Anmerkungen:Theme title: Global frontiers in manufacturing. Also known as ICPR
-
ISBN:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Inhaltsverzeichnis Konferenzband
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 3
-
Strength and Power Multiplication Factors in Peace TimeNaveh, B.-Z. et al. | 1995
- 13
-
Business Reengineering - Report on Industrial Practices and ExperiencesBullinger, H.-J. / Wiedmann, G. et al. | 1995
- 16
-
Genetic-Neuro Scheduling WorkshopDagli, C. H. / Siong, B. et al. | 1995
- 19
-
ICPR95 Workshop: Methodological Issues in the Design of Work-Breakdown Structure (WBS) for a ProjectGloberson, S. et al. | 1995
- 21
-
A Workshop on Data Envelopment Analysis: General Principles and Application AreasGolany, B. et al. | 1995
- 24
-
Computer Aided Process Planning by Nature Inspired Machine IntelligenceLeung, H. C. / Hines, E. L. / Raja, V. H. et al. | 1995
- 29
-
A Model of Intelligent CAD-CAP-CAM Interface in CIMBalic, J. / Brezocnik, M. et al. | 1995
- 32
-
Computer Aided Manufacturing of Rotors for Centrifugal Compressors on a Four Axis Milling MachineBohez, E. L. J. et al. | 1995
- 35
-
Design of a Modular Networked Manufacturing PlantCantamessa, M. / Villa, A. et al. | 1995
- 38
-
Application of Empirical Based Manufacturing Research ParadigmChung, W. W. C. / Li, K. C. / Chik, S. K. O. et al. | 1995
- 41
-
Development of Knowledge Based Systems in Object-Oriented EnvironmentCosic, I. / Govedarica, M. / Zivkovic, B. et al. | 1995
- 44
-
Manufacturing Knowledge Acquisition and Utilization by Means of Expert SystemsFourie, C. J. / Van Niekerk, T. I. et al. | 1995
- 47
-
Developing Procedure for Modeling Rotationaly Mechanical Parts with Unrotationalying Retreat of the FormGecevska, V. / Pavlovski, V. et al. | 1995
- 50
-
Development of a Low Cost CIM System for Electronic ManufactureHillery, M. T. / Kehoe, A. J. et al. | 1995
- 53
-
The Elements and Functions of Hierarchical Scheduling SystemIchimura, T. et al. | 1995
- 56
-
Technology Transfer: The Transition ZoneIunius, R. F. et al. | 1995
- 59
-
A Concept for Decentralized and Collaborative Production ManagementKuhlmann, T. / Massow, C. et al. | 1995
- 62
-
Approach to the Computer Integrated Toyota Production SystemKuroiwa, S. et al. | 1995
- 65
-
Datalog - A Production Planning and Control SystemLevy, U. et al. | 1995
- 68
-
Constructing Generalization Trees for Manufacturing Knowledge AcquisitionLoksh, S. / Karni, R. et al. | 1995
- 71
-
Impact of Communications Infrastructure on Production SitesMoore, J. M. / Larson, K. et al. | 1995
- 74
-
Solving Machine Loading Problem of FMS by Conjoint MeasurementMukhopadhyay, S. K. / Tiwari, M. K. et al. | 1995
- 77
-
Parallel and Distributed Models of Integration in Production SystemsNof, S. Y. et al. | 1995
- 80
-
Design of a Simulation Library for CIMPollatschek, M. A. et al. | 1995
- 83
-
Performance Measurement in an Enterprise ModelPrytz, K. et al. | 1995
- 86
-
An Enterprise Response Model for Computer Integrated Manufacturing SystemsSheahan, C. / Hillery, M. T. / Williams, P. et al. | 1995
- 89
-
High Reliability Design of Computer Integrated Multi-Stage Machining SystemsShimoda, Y. / Sakurai, F. et al. | 1995
- 92
-
Calibration Strategies and Tools for Off-Line Programming of Robotic WorkcellsSimon, G. / Parker, G. et al. | 1995
- 95
-
Analysis and Design of Information Systems for a Computer Controlled Manufacturing EnvironmentSless, A. / Arzi, Y. / Sipper, D. et al. | 1995
- 98
-
Computer Aided Edge Wearing PredictionZebala, W. et al. | 1995
- 103
-
Predicting the BottlenecksBedwell, M. et al. | 1995
- 106
-
Teaching Operations Management: Experimental Learning, Games and WorkshopsGilgeous, V. et al. | 1995
- 109
-
Problem Based Learning in Engineering Education for Better Systems ThinkingGranath, J. A. et al. | 1995
- 112
-
Teaching Engineering Mathematics through Computer TechnologyMaull, W. / Berry, J. / Stockel, C. et al. | 1995
- 117
-
A Design Assurance Model to Support a Multi-Plant, World Class Manufacturing OrganizationAl-Shaghana, K. / Mcgrath, J. et al. | 1995
- 120
-
Quality Strategies in International Enterprises - A Case StudyBlaafield, H. / Hautanen, M. / Mulari, J. / Takala, J. et al. | 1995
- 123
-
Performance Measurement to Justify and Evaluate Implementation of Just in TimeBredrup, H. et al. | 1995
- 126
-
Characteristics of the Production Planning and Control Process Influencing PerformanceBredrup, R. et al. | 1995
- 129
-
Global Manufacturing - A Matter for Small to Medium Sized Enterprises (SME's)?Bruun, P. et al. | 1995
- 132
-
A Planning Model for Multi-Site Production: An Object-Oriented ApproachBullinger, H.-J. / Fahnrich, K.-P. / Laubscher, H.-P. et al. | 1995
- 135
-
The Impact of Task and Work Structure on the Effectiveness of Implementing Concurrent Engineering in American IndustriesDuffy, V. G. / Salvendy, G. et al. | 1995
- 138
-
Human Aspects of Implementing Advanced Manufacturing Systems in Polish IndustryFertsch, M. et al. | 1995
- 141
-
JIT Manufacturing: Opportunities and Problems in a Developing Country IndustryGomez, M. C. / Mejia, C. A. / Pati�o, G. et al. | 1995
- 144
-
The Role of Manufacturing Strategy Within a Business Process Re-Engineering Change ProgrammeGreswell, T. J. / Maull, R. S. / Childe, S. J. / Bennett, J. et al. | 1995
- 147
-
Developing Manufacturing Strategy Based on Market InputsImam, S. A. / Prabhaker, P. R. / Hassan, M. Z. et al. | 1995
- 150
-
Adaptation of Japanese Manufacturing Management Practices: A Case Study of an Indian OrganizationIyer, K. / Mohanty, R. P. et al. | 1995
- 153
-
Implementation Issues of Computer Integrated Manufacturing (CIM) in Indian ScenarioJain, K. / Avinash, S. et al. | 1995
- 157
-
Concurrent Engineering Design Using Interval MethodsKarni, R. / Belikoff, S. et al. | 1995
- 160
-
TQM and Lean Production - Different Approach But Same Toolbox for ImprovementsKoether, R. et al. | 1995
- 163
-
JIT Implementation in a Norwegian Furniture CompanyLungaard-Soug, G. et al. | 1995
- 166
-
Creative Problem Solving in Engineering DesignMaimon, O. / Horowitz, R. et al. | 1995
- 169
-
Development of the Technological Competitiveness of SME's in ExportsMaunuksela, A. / Takala, J. et al. | 1995
- 172
-
The Lean Production System: Different Implementation Approaches and EvolutionMuffatto, M. et al. | 1995
- 175
-
Quality by Requirement Orientated Re-Use of Similar PartsMueller, D. H. / Bottcher, T. / Tietjen, T. et al. | 1995
- 178
-
The Comparison of the Concept of Digital Factory and Kanban System from the View of Information Flow and Cultural EnvironmentNeves, L. M. P. A. / Ota, M. et al. | 1995
- 181
-
Achieving Stability of the System of an Enterprise Within Emerging EconomyNikeshin, S. / Nimchin, A. et al. | 1995
- 184
-
Standard Industrial Classification: What Standard?Roberts, L. / Jones, C. et al. | 1995
- 187
-
Partial Implementation of JIT in a Make to Order EnterpriseSkjelstad, L. / Bredrup, H. et al. | 1995
- 190
-
The Need for Strategic Evolution Management in Manufacturing EnterprisesSmeds, R. et al. | 1995
- 193
-
Rationality and Foresight in the Inventory Investment Decision: The Evidence from Macroeconomic DataStern, A. / Halpern, N. et al. | 1995
- 195
-
Effects of Recycling on the Flowability of ThermoplasticsSy, D. E. / Wong, A. C.-Y. / Cheung, H. K. et al. | 1995
- 198
-
Buffer Allocation in JIT Ordering SystemsTakahashi, K. / Nakamura, N. et al. | 1995
- 201
-
Coordination and Management of Production in Extended Enterprises-Results of a European Research StudyThaler, K. et al. | 1995
- 204
-
Decision-Making of Business StrategyWatada, J. et al. | 1995
- 207
-
Driving Forces, Obstacles and the Consequences for Measures Taken in Lead-Time Reduction WorkWedel, J. E. / Lumsden, K. R. et al. | 1995
- 210
-
Strategies for Lead-Time Changes and Their Influence on the Change ProcessWedel, J. E. / Lumsden, K. R. et al. | 1995
- 213
-
The Division of Large Complex Production Systems, into Independent, Autonomous UnitsZelenovic, D. M. / Burbidge, J. L. / Cosic, I. P. / Maksimovic, R. M. et al. | 1995
- 216
-
Evaluating a Products End-of-Life Value for RecyclingZussman, E. / Pnueli, Y. et al. | 1995
- 221
-
Design and Analysis of a Special Milling Cutter for Metallic Honeycomb Machining ApplicationsAppukuttan, K. K. / Patil, J. / Nair, P. S. et al. | 1995
- 225
-
Application of a No Contact Capacitive Sensor to Mechanical Working ControlCaiazzo, F. / Palazzo, G. S. / Pasquino, R. et al. | 1995
- 228
-
Fine Blanking of Steel PlatesCaloska, J. / Lazarev, J. et al. | 1995
- 231
-
Design & Testing of Piezoelectric Actuator-Controlled Boring Bar to Compensate for Cutting Force-Induced Errors in Variable Depth-of-Cut ConditionsChiu, W. M. / Chan, K. W. et al. | 1995
- 234
-
A Study of Normal Force Change Under the Difference of Specific Cutting Resistance in Lathe Chatter (Part II)Iwata, Y. et al. | 1995
- 237
-
An Analysis for Justification of Applying Welding Technology at Spiral Drills ProductionJecmenica, R. M. / Droibnjak, V. / Milosevic, M. V. et al. | 1995
- 241
-
A Study on the Optimal Ultraprecision Cutting Condition by Nose Radius of Single Crystal Diamond ToolKim, J.-D. et al. | 1995
- 244
-
Finite Element Analysis of the Stress-Strain Condition in the Process of Fine BlankingKocov, A. / Lazarev, J. / Strezov, V. et al. | 1995
- 247
-
Mass Production-Process Planning with Regard to the Product PriceKopac, J. / Dolinsek, S. / Sokovic, M. et al. | 1995
- 250
-
Investigation of Chip Formation During MillingKovac, P. / Sidjanin, L. et al. | 1995
- 253
-
Mechanism of Material Removal in the Magnetic Abrasive Process and the Accuracy of MachiningKremen, G. Z. / Elsayed, E. A. / Rafalovich, V. I. et al. | 1995
- 256
-
Role and Significance of Setting and Measuring on the Cutting Tool in Flexible Manufacturing SystemsKuzinovski, M. / Cichosz, P. / Pavlovski, V. / Zebrowski, H. et al. | 1995
- 259
-
A New Concept in Wire Cut EDM Process and Machine Tool Design for Special ProfilesLiu, J. / Xia, Z. et al. | 1995
- 262
-
Optimal Control of a Tool-Wear ProcessMakis, V. et al. | 1995
- 265
-
Injection Moulding Process with Automated Visual FeedbackMarsh, R. / Stamp, R. J. et al. | 1995
- 268
-
Concept of the System for Automated Machine Tools Main Drive Gearbox DesignNavalusic, S. / Gatalo, R. / Konjovic, Z. et al. | 1995
- 271
-
Influence of Dressing Parameters on Grinding Performance of CBN/Seeded Gel Hybrid Wheels in Cylindrical GrindingPrusak, Z. / Webster, J. A. / Marinescu, I. D. et al. | 1995
- 274
-
The Effect of Tribological Processes on Reliability of Rolling BearingsRakic, R. et al. | 1995
- 277
-
Optimal Tool Replacement Based on Tool Life Distributions in Multi-Stage Machining SystemsSakurai, F. / Shimoda, Y. et al. | 1995
- 280
-
Prognosis of the Mean and External Time Value of Failure of the Cutting Tools Based on Its ReliabilitySekulic, S. et al. | 1995
- 283
-
Development of Drill Geometry for Drilling of Human BoneShuaib, I. / Hillery, M. T. et al. | 1995
- 286
-
'Quasi Honing' of Polygon SurfaceSzabo, O. et al. | 1995
- 291
-
Optimal Policies for an Integrated Production-Distribution SystemAkoka, J. et al. | 1995
- 294
-
Sensitive Analysis of a Production Systems Designed Through Group Technology Opposite Variations of the Master Schedule Application to a Job ShopAndres, C. / Poler, R. / Ortiz, A. / Ros, L. et al. | 1995
- 297
-
An Analysis of the Performances of Order Overplanning for Managing Lumpy DemandBartezzaghi, E. / Verganti, R. et al. | 1995
- 300
-
Proposition of an Information System with Multiple Points of View for an Assembly Operation Generation Using the Acquired ExperienceBergeonneau-Nervi, M.-L. / Brun-Picard, D. / Kieffer, J.-P. et al. | 1995
- 303
-
The New Generation of Two-Dimensional Bar Code SymbologiesBidanda, B. / Billo, R. E. / Cohen, Y. et al. | 1995
- 306
-
Self-Scheduling for Flexible Manufacturing Systems: A Product-Oriented ApproachBrun-Picard, D. / Baboli, H.-A. et al. | 1995
- 309
-
Hierarchical Design of Team Oriented Assembly SystemsBukchin, J. / Dar-El, E. M. / Rubinovitz, J. et al. | 1995
- 312
-
Real-Time Operational Control of FMSs with Flexible Operation Sequencing and Failure-Prone MachinesByrne, M. D. / Chutima, P. et al. | 1995
- 315
-
Integrated Process Planning & Scheduling Based on EnvironmentCarvalho, J. D. A. / Gindy, N. N. Z. et al. | 1995
- 318
-
Some Results from Applying a Flexible Concept of Assembly Systems and Designing Assessment of the Simulation EffectsCosic, I. / Anisic, Z. / Radlovacki, V. et al. | 1995
- 321
-
Modelling the Successful Mechanism of Military Base Transition with Human Measures and the Implications for ManufacturingDuffy, V. G. / Sparrow, F. T. / Koubek, R. J. et al. | 1995
- 324
-
Sensor Selection Procedures and Economy PrinciplesEdan, Y. / Nof, S. Y. et al. | 1995
- 327
-
A Method for Evaluation of Production Concepts for Small-Volume Batch Production of High Technology Products in the Electronics IndustryFagerlind, G. et al. | 1995
- 330
-
Revised Heuristic Algorithm for Loading Problems in Dedicated Manufacturing SystemsGencyilmaz, G. / Esnaf, S. et al. | 1995
- 334
-
The Optimization of the Residual Tool Life in Flexible Manufacturing SystemGiardini, C. / Ceretti, E. / Maccarini, G. et al. | 1995
- 337
-
Research Into the Correlation Between an Increase in Working Time and Productive Flow in Manufacturing IndustryGuerra, F. / Braga, G. et al. | 1995
- 340
-
Job Sequencing and Component Setup on a Surface Mount Placement MachineGuenther, H. O. / Gronalt, M. / Zeller, R. et al. | 1995
- 343
-
Designing and Managing Closed Tree-Structured Assembly SystemsHazra, J. / Seidmann, A. et al. | 1995
- 346
-
An Integrative Approach to the Inventory Routing ProblemHerer, Y. T. / Levy, R. et al. | 1995
- 349
-
Analysis on Logistics of an European Company in Process IndustriesImppola, J. J. / Takala, J. et al. | 1995
- 352
-
Materials Flow Effectiveness in Press OperationsJohansson, M. I. / Medbo, P. et al. | 1995
- 355
-
An Optimal Control Scheduling Method for Setup LocalizationKogan, K. / Khmelnitsky, E. / Shtub, A. / Maimon, O. et al. | 1995
- 358
-
Development of Strategic Competitive Advantage within the Industrial Sector Through the Systematic SupplierKoivisto, E. / Takala, J. et al. | 1995
- 361
-
Strategic Adoption of a Flexible Manufacturing System: A Case Study of an Indian Electronic EnterpriseMohanty, R. P. / De, R. / Banwet, D. K. / Deshmukh, S. G. et al. | 1995
- 364
-
Lead Time Analysis- The First Step Against Shorter Lead TimesMolinder, A. et al. | 1995
- 367
-
Application of Goal Programming for Optimum Product Mix in a Textile MillNakajima, M. / Suresh, M. N. / Matsuo, T. et al. | 1995
- 370
-
Human-Computer Cooperative Work in Multi-Agent Manufacturing SystemNakamura, N. / Takahara, J. / Kamigaki, T. et al. | 1995
- 373
-
Working with FMS: The Experience of Indian UsersNarain, R. / Yadav, R. C. et al. | 1995
- 376
-
Acceptance of Working Aids Used in an Assembly ProcessNilsson, S. / Ingelgard, A. et al. | 1995
- 379
-
Design and Evaluation of Assembly Systems - A Study of Ten Swedish Manufacturing CompaniesOhrstrom, P. / Bellgran, M. et al. | 1995
- 382
-
The Integrated Production, Distribution, and Marketing Planning Models Concerned with Customer SatisfactionOta, M. et al. | 1995
- 385
-
Investigation of the Production/Assembly Line Phenomenon in the Industrial OrganizationsPolenakovik, R. / Kralev, T. et al. | 1995
- 388
-
Development of Methodology Manufacturing Systems DesignRos, L. / Vicens, E. / Chalmeta, R. / Gasco, J. et al. | 1995
- 391
-
Assembly Line Balancing for Tasks Requiring Special Tooling and Controlled EnvironmentsRubinovitz, J. / Finkelbrand, I. et al. | 1995
- 393
-
Analysis of Multilevel Production - Inventory System in MRPSadiwala, C. M. et al. | 1995
- 396
-
Schedule Optimisation for a Computer Integrated Manufacturing SystemsSheahan, C. / Hillery, M. T. et al. | 1995
- 399
-
Low Volume Flexible Assembly by Self Correcting SoftwareStamp, R. J. et al. | 1995
- 402
-
Learning in Setups: Analysis, Minimal Forecast Horizons and AlgorithmsTzur, M. et al. | 1995
- 405
-
Problems of a Continuous Change- A Follow-Up Study (1988-1994) in a FMS FactoryVartiainen, M. et al. | 1995
- 408
-
Extending Existing Lot Streaming TechniquesWeeda, P. J. et al. | 1995
- 411
-
Analytical Determination of Job Division in Manual Assembly SystemsZuelch, G. / Braun, W. J. / Schiller, E. F. et al. | 1995
- 417
-
Multi-Product Capacity Planning ModelAskar, M. / Imam, S. A. / Hassan, M. Z. et al. | 1995
- 420
-
Flexible Layout Configuration for Coping with Changes in Product DesignBarad, M. / Moodie, C. L. et al. | 1995
- 423
-
Innovation Paths in Product Development: An Empirical ResearchBoschi, D. / Buzzacchi, L. / Calderini, M. / Cantamessa, M. et al. | 1995
- 426
-
Rapid Prototyping - A Method for the Development of Innovative ProductsBullinger, H.-J. / Fischer, D. / Woerner, K. et al. | 1995
- 429
-
Redesign of Electric Components for the Flexible Automated AssemblyCramer, R. et al. | 1995
- 432
-
An Empirical Evaluation of the Effect of Some Factors on the Design of Computer Simulation StudiesCrawford, J. W. / Gallwey, T. J. et al. | 1995
- 435
-
Organizing Goods Flow Control: An Integrated Design MethodologyDe Vries, J. et al. | 1995
- 438
-
Architecture of a Distributed Simulation System for Virtual ManufacturingFujii, S. / Kidani, Y. / Ogita, A. / Tsunoda, H. et al. | 1995
- 441
-
Economic Criteria of Buffer Utilization with an Unreliable MachineGilboa, I. / Herer, Y. T. / Kaspi, H. et al. | 1995
- 444
-
Multi-Disciplinary Collective Design Methods for Strategic Design of Production SystemsGranath, J. A. / Lindahl, G. A. / Rehal, S. et al. | 1995
- 447
-
Designing an Automated Production Line with Unreliable Multi-Functional Parallel Machines to Maximise ProfitKalir, A. / Arzi, Y. et al. | 1995
- 450
-
On-Line Simulation on Ongoing System for Real-Time AGV ControlKamigaki, T. / Takahara, J. / Nakamura, N. et al. | 1995
- 453
-
Jigs and Fixture Design Expert System on PCKang, J.-S. / Feng, Y.-J. / Zhang, X.-F. / Ma, P.-L. et al. | 1995
- 456
-
Design Validation: Using Virtual Prototypes for Product Design and Product EvaluationKern, P. / Riedel, O. et al. | 1995
- 459
-
A New Concept of Technology StrategyKeskinen, S. / Takala, J. et al. | 1995
- 462
-
Design of Cell-Line Systems for Job Shop ManufacturingKuroda, M. / Aoki, K. / Simoyashiro, S. / Maeda, K. et al. | 1995
- 465
-
Design Service into the Product: A New Challenge in ManufacturingMathe, H. et al. | 1995
- 468
-
Multi-Objective Optimization Approach to Product DesignMyint, S. / Tabucanon, M. T. et al. | 1995
- 471
-
Methods for Appraising the Output of Design and Benchmarking Design PerformanceO'Brien, C. / Smith, S. J. E. et al. | 1995
- 474
-
Integrated Approach to Decision Support for Choosing Between Process and Cellular Layouts Under Different Production Control SystemsO'Brien, C. / Chiadamrong, N. et al. | 1995
- 477
-
Production Planning Problems in Cellular ManufactureRiezebos, J. et al. | 1995
- 480
-
Criticality of a LayoutSarin, S. C. / Mishra, P. et al. | 1995
- 482
-
Automatic Synthesis of Optimum Design Layout by an Algorithmic ApproachShetty, D. et al. | 1995
- 485
-
Layout of Beacons for Triangulation of AGV's in Industrial EnvironmentsShoval, S. / Zeitoun, I. / Lenz, E. et al. | 1995
- 488
-
Designing of the Segmented Flow Topology (SFT) for Discrete Material Flow SystemsSinriech, D. / Tanchoco, J. M. A. et al. | 1995
- 491
-
Criterions for Classification of Mechanical Parts According to the Convenience for Their Machining on Machining CentersTrajkovski, S. et al. | 1995
- 494
-
The Role of Process Characteristics in (Re)Designing Supply Chain RelationshipsVan der Vaart, T. et al. | 1995
- 497
-
An Approach to Defining Machine Cells Using Cluster AlgorithmVeza, I. et al. | 1995
- 500
-
The Application of Simulation in Designing an Automated Storage and Retrieval SystemWorrall, B. M. / Jaishankar, S. et al. | 1995
- 503
-
Application of Scanning Technology in Product Design and ManufactureZhang, P. / Qiao, Z. et al. | 1995
- 509
-
Performance Analysis of Cellular, Job Shop and Hybrid Manufacturing Systems: A Simulation StudyAlbino, V. / Garavelli, A. C. et al. | 1995
- 512
-
Real Time Production Control of an Unmanned CMS Operated in Produce-to-Order EnvironmentArzi, Y. / Sipper, D. et al. | 1995
- 515
-
Flexibility Measures from the Perspective of Quality and CollaborationBarad, M. / Nof, S. Y. et al. | 1995
- 518
-
Measures of Flexibility in Queueing SystemsBrill, P. / Mandelbaum, M. et al. | 1995
- 521
-
The Rate of Equipment Utilization - An Indicator of Production Organization BonityBuble, M. / Pavic, I. et al. | 1995
- 524
-
Tensile Strength of Polyethylene MeltCheung, H. K. / Wong, A. C.-Y. / Sy, D. E. et al. | 1995
- 527
-
Production Budgets and Costing Standards Using Mathematical Simulation from Financial DataColville, E. J. et al. | 1995
- 530
-
Towards a Theoretical Base for Material Requirements PlanningGrubbstrom, R. W. et al. | 1995
- 533
-
A Reliable Method of Measuring the Machinability of Alloyed Austempered Ductile Iron (ADI)Seah, K. H. W. / Sharma, S. C. et al. | 1995
- 536
-
A Systems Approach to Flexibility Measurement and AnalysisShewchuk, J. P. / Moodie, C. L. et al. | 1995
- 541
-
Corporate Learning with Project ManagementAyas, K. et al. | 1995
- 544
-
Project Control Model with Variable Speeds and Inspection PointsGolenko-Ginzburg, D. / Gonik, A. et al. | 1995
- 547
-
Decomposing and Coordinating the Work in Large Scale Engineer-to-Order ProjectsHanssen, R. W. et al. | 1995
- 550
-
Advanced Project Management in One-of-a-Kind ProductionKuhlmann, T. et al. | 1995
- 553
-
Tackling Risks in Project ManagementPalo, J. T. / Similae, J. K. / Kess, P. A. / Maupetit, C. D. et al. | 1995
- 556
-
Portfolio of Multi-Locational Projects: The Differential Perspective for ControlTeltumbde, A. et al. | 1995
- 559
-
Do the Discrete Performance Standards Really Serve the Project Control?Teltumbde, A. et al. | 1995
- 565
-
A Case Based Process Planning System for Prismatic PartsBen Arieh, D. / Chopra, M. et al. | 1995
- 568
-
On the Use of Simulated Annealing in Flowshop Scheduling Problems with Minimization of MakespanBraglia, M. / Gentili, E. et al. | 1995
- 571
-
A Predictive Neural Network Modelling System for Process PlantsCavalieri, S. / Garetti, M. / Taisch, M. et al. | 1995
- 574
-
A Study of Neural Network Control Charts for Various Production ProcessesChang, S. I. / Buddhavarapu, M. S. et al. | 1995
- 577
-
Pattern Classification and Recognition System for the Automatic Guidance of Load-Haul-Dump Vehicles in Underground MiningCordova, F. / Quezada, L. / Salinas, R. / Perez, E. et al. | 1995
- 580
-
A Worker-Randomness Model of Task Completion TimeDoerr, K. / Arreola-Risa, A. et al. | 1995
- 584
-
Cost Reduction Strategies for Automatic Warehousing SystemsEben-Chaime, M. / Pliskin, N. et al. | 1995
- 587
-
A Study on Production Lines with Discrete Batch Wip Inventory TransferErel, E. et al. | 1995
- 590
-
A Generalized Control Model for Man-Machine Production Systems with DisturbancesGolenko-Ginzburg, D. / Kats, V. et al. | 1995
- 593
-
Lateral Stock Transshipments in a Two-Location Inventory SystemHerer, Y. T. / Rashit, A. et al. | 1995
- 596
-
Scheduling with Learning CapabilitiesKarni, R. / Fournier, F. et al. | 1995
- 599
-
Optimal (s'S)-Control of Job Acceptance and Rejection in a Manufacturing SystemKoechel, P. et al. | 1995
- 602
-
A Parallel Genetic-Neuro Scheduler for Job-Shop SchedulingLee, H. C. / Dagli, C. H. et al. | 1995
- 605
-
A Travel Sequencing Algorithm for Robotic Arc WeldingLevitin, G. / Rubinovitz, J. et al. | 1995
- 609
-
A Simple Heuristic for Scheduling on Single Machine to Minimize Total TardinessLiu, J. et al. | 1995
- 612
-
An Adaptive Optimization Model for Scheduling in Dynamic EnvironmentsLiu, J. et al. | 1995
- 615
-
A Fuzzy Job Oriented Method for Dynamic Scheduling in Multiple Objective Production EnvironmentLo Nigro, G. / Perrone, G. / Noto La Diega, S. et al. | 1995
- 618
-
Multiresolution Analysis of Flexible Manufacturing SystemsMaimon, O. / Shmilovici, A. et al. | 1995
- 621
-
Comparative Analysis of Production Control Systems for Batch Production EnvironmentsMasin, M. / Dar-El, E. M. / Herer, Y. T. et al. | 1995
- 624
-
Perishable Inventory Control Subject to the Warehouse CapacityNose, T. / Adachi, Y. / Kuriyama, S. / Ishii, H. et al. | 1995
- 627
-
Automated Decision Support for Rescheduling and Optimization Tasks within a Simulation-Based Production ControlReinhart, G. / Martin, C. / Heitmann, K. et al. | 1995
- 630
-
Due-Date Dispatching and Markovian Analytical ModelsRossini, C. / Zavanella, L. et al. | 1995
- 633
-
A General Methodology for Planning and Scheduling Operations in Manufacturing and ServicesSalazar, E. H. et al. | 1995
- 637
-
Modelling Business Processes in Production Systems by a Multiple Dynamic Network ApproachSchjaer-Jacobsen, H. et al. | 1995
- 640
-
A Production Management Expert System Developed in TirsToal, D. / Coffey, T. / Smith, P. / Skehill, A. et al. | 1995
- 643
-
Selecting the Best Multi-Dimensional Sizes to Make and Stock with Downward SubstitutionTripathy, A. / Gerchak, Y. et al. | 1995
- 649
-
TQM Saves LifeAmid, M. / Bar-Lev, D. et al. | 1995
- 652
-
Design of a Decision Support System for Printed Wiring Board AssemblyBard, J. F. / Feo, T. A. / Holland, S. D. et al. | 1995
- 655
-
Re-Engineering Process Plans for Manufacturing Cell Design: A Case StudyBillo, R. E. / Bidanda, B. / Kharbanda, P. et al. | 1995
- 658
-
Organizing for Quality and Innovation in Manufacturing: An Empirical Study on the Impact of Configurations of Quality Assurance Systems on Innovation in Industrial FirmsBodewes, W. E. J. et al. | 1995
- 661
-
A Knowledge Based Expert System for Quality ControlGencyilmaz, G. / Zayim, S. et al. | 1995
- 664
-
Total Quality Management System Based on the Fusion ConceptIshii, K. et al. | 1995
- 667
-
Classifying Benchmarking - A New Approach to Improve the Quality of the Benchmarking ProcessKempf, S. / Siebert, G. et al. | 1995
- 670
-
A Knowledge Base for the Re-Engineering of Manufacturing SystemsKochhar, A. K. / Munoz San Ildefonso, M. I. et al. | 1995
- 673
-
Managing Operations Development ProjectsKosonen, K. / Holmstroem, J. et al. | 1995
- 676
-
An Empirical Study for TQM ImplementationLakhe, R. R. / Mohanty, R. P. et al. | 1995
- 679
-
Relationship Between Quality Cost and Total Quality Management Effort for Indian IndustryMathew, T. / Madrecha, K. M. et al. | 1995
- 682
-
A Model of the Order Flow Process for Implementing Business Process Re-EngineeringMaull, R. S. / Weaver, A. M. / Childe, S. J. / Smart, P. A. et al. | 1995
- 685
-
R&D Quality & Productivity: Measurement and Improvement ProcessMeyersdorf, D. / Bonen, Z. / Dar-El, E. M. et al. | 1995
- 688
-
Victor - Implementing Continuous ImprovementsNaeger, G. / Reithofer, W. et al. | 1995
- 692
-
On-Line Estimation of Process Deterioration from Product Quality MeasurementsPickett, E. E. / Hsu, E. et al. | 1995
- 695
-
Quality Management for Packaging in the Food IndustryRimini, B. / Melloni, R. et al. | 1995
- 698
-
Analyzing the Needs and Directing the Efforts for the Development of Customer Satisfaction in Technically Oriented Finnish Industries - A Case StudySaarinen, J. / Takala, J. et al. | 1995
- 701
-
Optimiization of Surface Roughness Analyzer Using Robust DesignShetty, D. / Roosa, V. D. et al. | 1995
- 704
-
Some Applications of a New Two-Moment Distributional Fitting ProcedureShore, H. et al. | 1995
- 707
-
Business Process Re-Engineering of Customer Driven ManufacturingStrandhagen, J. O. et al. | 1995
- 710
-
Re-Design Manufacturing Process Through Re-EngineeringYung, W. K. C. / Shek, J. et al. | 1995
- 715
-
Speed Tests as a Means for Organizational Learning During Start-Up in New Production SystemsAlmgren, H. et al. | 1995
- 718
-
A Macro Ergonomic Approach to Total Quality ManagementAxelsson, J. R. C. et al. | 1995
- 721
-
The Use of Some Ergonomic Methods as Tools in Quality ImprovementAxelsson, J. R. C. / Odenrick, P. et al. | 1995
- 724
-
Impact of Technological Productivity on ManufacturingBilich, F. et al. | 1995
- 727
-
Top Management and Human Factors in Manufacturing IndustryBolwijn, P. T. / Kumpe, T. et al. | 1995
- 730
-
A New Generation of Work Measurement Systems for Manufacturing & Industrial ApplicationsCohen, Y. / Bidanda, B. / Billo, R. E. / Zandin, K. B. et al. | 1995
- 733
-
Automatic Vs Manual Manufacturing in the Diamond IndustryGilad, I. et al. | 1995
- 736
-
Manpower Assessment and Planning Strategies in a Process Industry: An Important Step Towards TQMGuin, K. K. / Ray, P. K. et al. | 1995
- 739
-
Work Load Dose and Materials Handling Efficiency - A Method to Evaluate the Design of Materials Flow SystemsJohansson, M. I. / Karlsson, H. / Mathisson, B. / Oertengren, R. et al. | 1995
- 742
-
Productivity Measurements in Civil Engineering Using Best PracticeJonsson, J. / Albriktsen, R. O. / Foersund, F. R. et al. | 1995
- 745
-
Improving Productivity Via Technology and ManagementKao, C. et al. | 1995
- 748
-
Senior Citizen Labor in Advanced Manufacturing SystemKume, Y. / Sato, N. et al. | 1995
- 751
-
Ergonomic Evaluation of Bicycle Riding PosturesLi, M. / Zhou, Y. / Su, S. et al. | 1995
- 754
-
Human Factors in Lean Production and Social Technical Systems: A Case Study of the Assembly Shop in the Automotive IndustryMolleman, E. / Niepce, W. et al. | 1995
- 757
-
Ergonomic Design of Production Systems in a Computerized EnvironmentNilsson, G. / Oertengren, R. et al. | 1995
- 760
-
A Comparison of Two Different Production Designs for Manual Assembly of Electronic Equipment in Respect to Muscle LoadOdenrick, P. / Fostvedt, F. / Johansson, E. / Vigre, C. et al. | 1995
- 763
-
Effect of Anthropometric Dimensions on Worker Performance in a Combined Manual and Decision TaskOgawa, I. / Raouf, A. et al. | 1995
- 766
-
An Exploration of the Linkage Between Organisational Culture Employee Personality and Productivity: Evidence from Three Diverse OrganisationsOswick, C. et al. | 1995
- 769
-
Ergonomics in Assembly PlanningRally, P. J. / Schipfer, J. et al. | 1995
- 772
-
Throughput Maximization in Production Lines with High Influence of LearningTabucanon, M. T. / Paul, H. / Puspasari, S. S. et al. | 1995
- 775
-
Manpower, Ques and Customer Satisfaction: Making the Connection in the Banking IndustryWangenheim, M. / Tal, Y. / Gast, R. et al. | 1995
- 777
-
Relative Total Factor Productivity in China's Iron and Steel Enterprises: An Application of Data Envelopment Analysis MethodZhou, Y. / Wong, A. C.-Y. / Frankenstein, J. et al. | 1995