The system design principles of mining machines with the combined main parts (Englisch)
- Neue Suche nach: Klimov, Y. I.
- Neue Suche nach: Klimov, Y. I.
- Neue Suche nach: Singhal, R. K.
In:
Mine planning and equipment selection
;
601-604
;
1995
-
ISBN:
- Aufsatz (Konferenz) / Print
-
Titel:The system design principles of mining machines with the combined main parts
-
Beteiligte:Klimov, Y. I. ( Autor:in ) / Singhal, R. K.
-
Kongress:International symposium; 4th, Mine planning and equipment selection ; 1995 ; Calgary; Canada
-
Erschienen in:Mine planning and equipment selection ; 601-604
-
Verlag:
- Neue Suche nach: A A Balkema
-
Erscheinungsdatum:01.01.1995
-
Format / Umfang:4 pages
-
ISBN:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Inhaltsverzeichnis Konferenzband
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 3
-
Pit optimization of Sapan Dalam multi-seam coal deposit of IndonesiaBaafi, E. Y. / Milawarma, E. / Cusack, C. et al. | 1995
- 9
-
A dragline simulation model for complex multi-seam operationsBaafi, E. Y. / Mirabediny, H. / Whitchurch, K. et al. | 1995
- 15
-
Planning of ore recovery parameters based on economical and mathematical modelling of ore drawingBolkisev, V. S. / Shashkin, V. N. / Amiralin, K. A. et al. | 1995
- 19
-
A rational approach to the design of underground marble quarriesBosu, M. / Ciccu, R. / Manca, P. P. et al. | 1995
- 29
-
`INFRA' - Computer-aided planning of mine transportation systemsBuhrow, C. et al. | 1995
- 39
-
Managerial aspects of mining projects in remote sitesChaves, A. P. et al. | 1995
- 45
-
Optimum open pit limit of Hekimhan-Deveci iron mine: Determination by the moving cone optimising techniqueDag, A. / Oezer, U. et al. | 1995
- 49
-
Planning for safety: The use of risk assessmentFoster, P. J. / Edwards, J. S. et al. | 1995
- 57
-
Development of a short term planning tool at the Compagnie Miniere des Guemassa, ONA, MoroccoGoetz, D. / Masurel, P. / Ait Rahou, S. M. / Sellami, M. et al. | 1995
- 65
-
Numeric methods and their user-friendly applicationsGoekay, M. K. et al. | 1995
- 71
-
Prediction of gas-geomechanic situation of coal-gas deposit during underground mining in panelGritsko, G. I. / Vlasenko, B. V. / Fedorin, V. A. et al. | 1995
- 77
-
Top coal caving technology in dip thick coal seamsYu, H. / Wu, F. / Li, C. / Zhang, Y. et al. | 1995
- 81
-
Meaningful rates of return for project evaluationHajdasinski, M. M. et al. | 1995
- 89
-
Precision drilling extends the range of long hole blastingHamrin, H. et al. | 1995
- 97
-
Peculiarities of recultivation by placer deposit miningHnykin, V. F. et al. | 1995
- 103
-
Short-term production scheduling for open pit mines by PERT network with resource constraintsHu, Q. / Wei, W. / Fang, S. et al. | 1995
- 109
-
The study of rational bench height of deep open pit mines based on haulage costWang, J. / Liu, Q. et al. | 1995
- 113
-
The forecasting report of the moment of the mine retirement from the coal area mine fundKondratova, I. G. / Bulychev, N. S. et al. | 1995
- 117
-
Three dimensional modeling in planning ornamental stone quarriesKoppe, J. C. / Zingano, A. C. / Costa, J. F. C. L. et al. | 1995
- 121
-
Study and analysis of problems and disturbances caused by oversize boulders in a mine production system: A case studyKumar, A. et al. | 1995
- 127
-
An intelligent system of optimizing the mine production planning of underground mineLi, Y. / Chen, X. / Tong, G. et al. | 1995
- 131
-
Intellectual supporting system of VACS operator based on the fuzzy diagnostic modelLockshina, I. V. et al. | 1995
- 137
-
Computerized mine planning at Brunswick Mining & SmeltingMacPherson, G. E. / Stothart, P. G. / Torrance, J. G. et al. | 1995
- 143
-
Hydrotransport system simulation modeling for Syncrude's North MineMcTurk, J. / Batty, P. / Ellis, D. W. et al. | 1995
- 151
-
Hard dimension stone production by splitting and cutting methods in Italian quarriesMancini, R. / Cardu, M. / Fornaro, M. et al. | 1995
- 157
-
Layout and equipment of a modern high productive mine operation at great depths: The Ensdorf MineMeyer, A. / Gessner, D. et al. | 1995
- 163
-
UBC mining method selectionMiller-Tait, L. / Pakalnis, R. / Poulin, R. et al. | 1995
- 169
-
An expert system controlling ore flow in large scale orepass systemsMogi, G. / Yamatoni, J. / Adachi, T. et al. | 1995
- 177
-
Block modelling and long range mine planning using SURPACNachmias, J. / Pavlov, Y. et al. | 1995
- 183
-
Technogenic potash seams and their mining prospectsNesterov, M. P. / Marakov, V. Y. et al. | 1995
- 189
-
Safety during filling of underground cavern gas storageOtahal, A. / Hajek, L. et al. | 1995
- 193
-
Underground hard-rock mining strategy developmentPareja, L. D. / Pelley, C. W. et al. | 1995
- 199
-
Re-examination of a century old mining area: Boleo, Baja California, MexicoParkes, D. M. et al. | 1995
- 205
-
Exploitation planning in slate quarries by merging the recovery and quality indicesPereira, H. G. / Sousa, A. J. / Albuquerque, T. / Ribeiro, J. et al. | 1995
- 209
-
Coal mine pollution flows monitoringPuchkov, L. A. / Ayurov, V. D. / Kaledina, N. O. et al. | 1995
- 215
-
The mathematical model of interaction of mining and transport equipment at the quarry's working zoneRakishev, B. / Djarlkaganov, U. / Marat, J. et al. | 1995
- 221
-
Turning mining enterprises in Russia into private and joint-stock companiesRevazov, M. / Likhterman, S. et al. | 1995
- 227
-
Short term mining operation sequencing and control: The B2 approach as a case studySchleifer, J. / Ismail, M. / Caumartin, E. et al. | 1995
- 231
-
Application of deposit simulation model in mine designShu, H. / Yang, P. / Tong, G. et al. | 1995
- 235
-
Discussion on the mechanism of cut pulling in underground minesSingh, S. P. et al. | 1995
- 243
-
A field study of sources of hole alignment deviationsSinkala, T. et al. | 1995
- 249
-
On the issues of the solution of dynamics simulation of coal production within the coal mining process in coal facesSnapka, P. et al. | 1995
- 255
-
\Fundamental considerations on a mining technology beyond continuous and longwall miningSpies, K. et al. | 1995
- 261
-
Contribution to ventilation of shafts during their closingStrakos, V. / Kebo, B. et al. | 1995
- 265
-
Long term open pit schedulerTolwinski, B. / Golosinski, T. S. et al. | 1995
- 271
-
Simulation for design, planning and control in the automated mineVagenas, N. / Scoble, M. / Baiden, G. et al. | 1995
- 277
-
An integrated approach to the extraction of the Rio Grande silver/lead/zinc orebodies at Mount IsaVillaescusa, E. / Karunatillake, G. / Li, T. et al. | 1995
- 285
-
An interactive multiple criteria decision support system for production sequencing in an underground long wall hard coal mineWilke, F. L. / Winkler, B. M. et al. | 1995
- 291
-
Mine planning, pit design and production scheduling for Eshidiya phosphate minesWoreikat, J. / Hayek, F. et al. | 1995
- 297
-
BEGS - A simulation model for assessing risks in mineral resources estimationWright, E. A. et al. | 1995
- 303
-
Mining's new frontier: The Fording Coal g.p.s. experienceWusaty, E. / Paulhus, L. et al. | 1995
- 313
-
Self-adaptive control of productional operations for surface miningYun, Q. X. / Huang, G. Q. et al. | 1995
- 319
-
Analysis of stability of gate entries in retreating longwall miningZhang, M. / Bhattacharyya, A. K. et al. | 1995
- 327
-
Oil content estimation in sedimentary rock assisted by geostatisticsZingano, A. C. / Costa, J. F. C. L. / Koppe, J. C. et al. | 1995
- 339
-
A detailed classification of rotating excavatorsAdler, L. / Thompson, S. D. et al. | 1995
- 343
-
Determination of equipment downtime/breakdown and availability coefficients for continuous surface mining systemsAgioutantis, Z. G. / Kavouridis, C. et al. | 1995
- 351
-
The economics and logistics of moving car bunker systems applied to modern underground coal minesBarlow, P. M. et al. | 1995
- 357
-
Equipment selection in the Iranian marble quarries (dimension-stone industry): Procedures and problemsBassir, S. H. et al. | 1995
- 363
-
Conversion from bucketwheel to truck-shovel operation of Suncor, Oil Sands GroupBlazo, A. et al. | 1995
- 369
-
A systematic decision making model for optimum surface mining equipment selectionCebesoy, T. / Goezen, M. / Yahsi, S. et al. | 1995
- 379
-
Equipment selection for small scale miningChanda, M. W. et al. | 1995
- 385
-
Estimation of the air quality index in the case of operation of numerous diesel-powered units in Greek underground bauxite minesEconomopoulos, J. N. / Kontothanassis, P. T. et al. | 1995
- 391
-
Intelligent dispatch system for technological monitoringFedunec, N. I. / Fomicheva, O. E. / Lasht, D. G. et al. | 1995
- 395
-
Research on the interval between equipment examinationsLiu, F. / Gao, H. / Ma, Y. / Hu, M. et al. | 1995
- 399
-
Diagnosis of machines running at unstable speeds of revolutionGeropp, B. / Kessler, H.-W. / Burgwinkel, P. et al. | 1995
- 403
-
Application of high angle conveyor at Majdanpek open pit copper mineGrujic, M. / Stanisic, Z. et al. | 1995
- 409
-
Selection of opencast mine equipment using knowledge base and genetic algorithmHaidar, A. / Naoum, S. et al. | 1995
- 415
-
Selection of drill rigs for development drifting in underground minesHamrin, H. / Gustafsson, L. et al. | 1995
- 419
-
Conveyor belt selection criteriaHardygora, M. et al. | 1995
- 423
-
Current collectors for trolley mine locomotivesIvanov, A. B. et al. | 1995
- 427
-
Determination of the distribution function of conveyor belt operating time based on the belt modelJurdziak, L. / Hardygora, M. et al. | 1995
- 431
-
On-line fault diagnosis of a bucket wheel gear box in a German open cast coal mineKessler, H.-W. / Van den Heuvel, B. / Bauer, B. / Geropp, B. et al. | 1995
- 437
-
Double roll crusher - Tooth base and bimetallic cap developmentsKhan, A. / Reid, D. / Obaia, K. / Adamic, D. et al. | 1995
- 445
-
Modern mine maintenance: Toolbox, blackbox, or tribo-technology?Kincaid, R. L. et al. | 1995
- 457
-
The pipeline transportation of grinded copper ore at Cerovo mine - From concept to implementationKnezevic, D. / Markovic, Z. / Stupar, S. / Dragic, D. et al. | 1995
- 463
-
Planning and keeping in operation of coal-cavingsKovacs, T. / Nemeth, L. et al. | 1995
- 469
-
On the property of hydraulic couplingLi Guang Bu et al. | 1995
- 475
-
Design of an economic mobile slasher for underground coal extractionMaity, S. N. / Chaulya, S. K. / Dhar, B. B. et al. | 1995
- 481
-
BEdisp - A computer-based truck dispatching system for small-medium scale mining operationsPanagiotou, G. N. / Michalakopoulos, T. N. et al. | 1995
- 487
-
Magnetic defectoscopy of steel ropesPistora, J. / Lesnak, M. / Ciprian, D. / Madr, V. et al. | 1995
- 493
-
The problems of control of power consumption in the mining enterprisesPivnyak, G. et al. | 1995
- 497
-
The development of welded structures for mining equipmentPowers, B. et al. | 1995
- 505
-
Maintenance characteristics of mobile mine equipment at Falconbridge Strathcona mineRunciman, N. / Vagenas, N. / Howes, R. A. et al. | 1995
- 511
-
Simple and exact mining using surface minersSchimm, B. et al. | 1995
- 517
-
Measurement and analysis of dragline operating parameters for block excavationSharrock, G. B. / Aspinall, T. O. / Scott, A. et al. | 1995
- 523
-
Estimation of applicability of a drilling machine in Japanese open pit limestone quarryShimada, H. / Matsui, K. et al. | 1995
- 529
-
An introduction of a continuous mining system in hard rock open pit mines using a modified surface minerSpachtholz, F. X. / Wilke, F. L. et al. | 1995
- 535
-
The use of-the-road tyres in a Turkish opencast lignite mine and its importance in mine economicsSunu, M. Z. / Yilmaz, A. O. et al. | 1995
- 541
-
Appropriate technology for the cleaner mining of coal by smaller operatorsWade, L. / Woodyatt, T. T. H. et al. | 1995
- 547
-
Performance analysis of PDC pin and hybrid core bits in rock drillingWaller, M. D. / Ersoy, A. et al. | 1995
- 553
-
Automatic selection of aggregate images from a moving conveyor beltWang, W. et al. | 1995
- 559
-
Availability control and equipment monitoring on large hydraulic shovels with the aid of on-board computersWulfert, U. et al. | 1995
- 565
-
Experimental study on estimation of leakage discharge through concrete crackYanagi, H. / Matuoka, S. / Fukuhara, T. et al. | 1995
- 571
-
Semi-continuous coal haulage system in Chinese surface minesZhang, Y. D. / Zhang, D. X. / Li, X. C. / Yang, S. C. et al. | 1995
- 579
-
Research on the global optimization theory for mining engineering systemsChai, J. / Xie, X. / Tong, G. et al. | 1995
- 585
-
Fully automated laser system for surveying a stockpile from a tripper carClifford, B. et al. | 1995
- 591
-
Integrating communications and applications in the automated underground mineHackwood, J. / Poole, R. et al. | 1995
- 597
-
Intelligence decision-making system for selecting tunnelling equipmentGao, H. / Zhang, Y. / Liu, F. / Ma, Y. et al. | 1995
- 601
-
The system design principles of mining machines with the combined main partsKlimov, Y. I. et al. | 1995
- 605
-
Applications of a flexible and robotics in mining: Database for designersKonyukh, V. et al. | 1995
- 611
-
TMS[TM] - Total Mining Systems: An intelligent management, production control and planning facilityPeck, J. / Hendricks, C. et al. | 1995
- 619
-
Power-and resources saving technology of rockmass destructionRashkin, A. V. / Kuzin, V. F. / Myazin, V. P. et al. | 1995
- 623
-
Integrated computer system for planning and controlling miningStepanov, P. / Piven, G. et al. | 1995
- 627
-
Simulation and animation of surface mines in the Western United StatesSturgul, J. R. / Tiedemann, J. / Ritter, C. / Fliess, T. et al. | 1995
- 635
-
Apparatus and programme providing microprocessory means of mining automationTkachov, V. V. / Pivniak, G. G. et al. | 1995
- 639
-
Methods and results of the field measuring of geotechnical rock properties on spoil banks of brown-coal minesAldorf, J. et al. | 1995
- 645
-
Ethics, surface mining and the environmentCragg, W. / Pearson, D. / Cooney, J. et al. | 1995
- 651
-
Monitoring systems in mining environmental management and controlDe Salles Leal Filho, L. / Hennies, W. T. / Owen, D. / Durucan, S. et al. | 1995
- 657
-
Integrated reclamation planning of disconfigured landscape after surface mining operations at Ghana Consolidated Diamonds limited (GCD), Akwatia, GhanaFenteng, J. A. F. / Asabere, R. K. / Solomon, G. B. et al. | 1995
- 667
-
Ferric phosphate coating to prevent pyrrhotite oxidationGeorgopoulou, Z. / Fytas, K. / Soto, H. / Evangelou, B. et al. | 1995
- 675
-
Surface coal mining in the South Wales environmentHaigh, M. J. et al. | 1995
- 683
-
Opencast mine planning creates the prerequisite for environmental compatibilityHartung, M. et al. | 1995
- 691
-
Underground limestone mining in Brazil as an economic environmental issueHennies, W. T. / Stellin, A. / Ghizzi, L. C. et al. | 1995
- 699
-
The social and environmental effects of surface coal miningHeycock, S. et al. | 1995
- 705
-
Mine rehabilitation close to urban areas: The case of Itaquera Quarry, Sao Paulo, BrazilIbrahim, M. M. / Eston, S. M. / Sanchez, L. E. et al. | 1995
- 709
-
Study on biochemical treatment of Acid Mine Drainage (AMD) and comprehensive utilization of its sludgeZhu, J. et al. | 1995
- 715
-
Environmental approach and the future of mining in the Urals region of RussiaKhokhryakov, A. V. / Dementyev, I. V. / Albrecht, V. G. et al. | 1995
- 717
-
Modelling rainfall/runoff on reclaimed landKilmartin, M. P. et al. | 1995
- 723
-
Classification of waste rock at Island Copper Mine for acid rock drainage potentialLister, D. / Poling, G. W. et al. | 1995
- 729
-
Geotechnical stability of slope of the opencast mine of Czechoslovak army at the foot of the Ore MountainsLost'ak, O. et al. | 1995
- 733
-
Tracking of heavy metals in drainage from abandoned mines, Big Cottonwood Creek, UtahMcNearny, R. L. et al. | 1995
- 737
-
Principles and practices of sustainable development - With TransAlta examplesMikalson, D. A. et al. | 1995
- 747
-
The identification, location and assessment of abandoned mine hazards - The first step toward rehabilitationMitchell, A. / Mackasey, W. O. et al. | 1995
- 759
-
Particulate emissions from some sources in surface miningMohamed, M. A.-K. et al. | 1995
- 765
-
Lithological and mineralogical influences on pyrite oxidation during the generation of acidic drainageMountjoy, K. J. / Poling, G. W. et al. | 1995
- 773
-
Environmental problems associated with blasting operations and their remediesNavalkar, C. B. et al. | 1995
- 779
-
Saline gold mine wastes in arid Western Australia: Revegetation establishment in the absence of topsoilOsborne, J. M. et al. | 1995
- 787
-
Self-sustainable reclamation: Shrub and tree establishment on saline mine wastesOsborne, J. M. et al. | 1995
- 793
-
Environmental issues of energy use in minesPivniak, G. G. / Ivanov, A. B. et al. | 1995
- 797
-
Risk management for mine waste and tailingsPoulin, R. et al. | 1995
- 803
-
Environmental problems associated with mining of bentonite clay deposits at Boa, Vista, Paraiba, BrazilSilva, C. M. M. / Eston, S. M. / Damasceno, E. C. et al. | 1995
- 807
-
Surface mining and the responsibility for environmental: New situations and challenges for the Czech coal industrySvoboda, I. / Vrbova, M. et al. | 1995
- 811
-
Areal dubbing of mining activity in the largest mining company in the Czech Republic: Most Coal Joint Stock Company (JSC MUS)Triska, J. et al. | 1995
- 819
-
Parameter optimization and control in blasting works for ore and coal minesArad, V. / Arad, S. et al. | 1995
- 825
-
The stability and reliability analysis of development openings in the Valea JiuluiArad, V. / Arad, S. et al. | 1995
- 829
-
The feasibility study of waterproof and water-protection technologies on the basis of Ukrainian mining regions geotechnical systemsBondarenko, V. I. / Sadovenko, I. A. et al. | 1995
- 833
-
Buffer action in the carboniferous clays rocks located on hard coal heapsBzowski, Z. et al. | 1995
- 839
-
A general stochastic methodology for rock work designCotza, R. / Grosso, B. et al. | 1995
- 845
-
Static collapse of mine waste fillsDawson, R. F. / Morgenstern, N. R. et al. | 1995
- 853
-
The objective laws of itself of landslides in the open pit minesDemine, A. M. / Graur, I. A. et al. | 1995
- 857
-
Backfill in potash mines: Transportation and geotechnical issuesDe Souza, E. et al. | 1995
- 865
-
Seismicity at El Teniente mineDunlop, R. / Gaete, S. et al. | 1995
- 871
-
Performance tests on short length cable bolts in an underground room and pillar mineEconomopoulos, J. N. / Kotinis, D. H. / Koronakis, N. J. / Sofianos, A. I. et al. | 1995
- 875
-
Stability of coal pillars in inclined coal seamsForoughi, M. H. et al. | 1995
- 881
-
Variable stress meter for monitoring rock mass structuresFujimura, F. / Hennies, W. T. / Fernandes, A. C. et al. | 1995
- 887
-
Blastability of rocks - Studied casesFujimura, F. / Soares, L. / Hennies, W. T. / Resende, M. A. et al. | 1995
- 893
-
Modelling of the underground water filtration in the drainage shaft region of Kremikovtsi open-pit mineGabeva, D. A. et al. | 1995
- 899
-
Rock mass as a dissipative thermodynamic system - New conception in open pit slope stability modellingHalatchev, R. A. et al. | 1995
- 907
-
Selection of ground control in instrumentation for potash, coal and hardrockHerget, G. H. et al. | 1995
- 913
-
Resistivity manifestations of slope deformations and subsidence basinsHofrichterova, L. / Muellerova, J. / Muerller, K. et al. | 1995
- 921
-
Dumping patterns of coal wastes in Chinese underground minesHu, Z. / Gu, H. et al. | 1995
- 927
-
Research of general entropy in miningSong, H. / Sun, B. / Yu, B. / Liu, I. et al. | 1995
- 933
-
The prediction of rock quality parameters by using neural network modelsHuang, Y. / Lindqvist, P.-A. et al. | 1995
- 939
-
Truck road slope design by using coefficient of equivalent haulage distance in the Yongping copper mineHua, J. / Zhou, P. / Cai, S. et al. | 1995
- 945
-
Model of fines generation in coal blastingKabongo, K. K. et al. | 1995
- 953
-
Continuum and discontinuum modelling of mine pillars in jointed rockKapenis, A. P. / Tsoutrelis, C. E. T. et al. | 1995
- 961
-
Geomechanical model of rock salt for stress and stability analysis of underground disposal cavernKleczek, Z. / Flisiak, D. et al. | 1995
- 967
-
A computer modelling system for three-dimensional stability assessment of slopesKumsar, H. / Denby, B. et al. | 1995
- 973
-
Codisposal of fine tails and overburden utilizing pipelining techniquesLord, E. R. F. / Maciejewski, W. et al. | 1995
- 981
-
Dam construction and utility corridor relocation in-pit at Syncrude Canada LtdMacNeil, J. / Piciacchia, L. / Cameron, R. / Ashton, C. et al. | 1995
- 989
-
Instrumentation of an advancing mine slope in the Athabasca Oil SandsMcKenna, G. T. / Shelbourn, M. A. B. et al. | 1995
- 999
-
Large scale underground stoping of rock for aggregate production and subsequent use for storage or waste disposalNielsen, K. / Myrvang, A. et al. | 1995
- 1005
-
A computer program for kinematic analysis of rock slopesOecal, A. / Oezgenoglu, A. et al. | 1995
- 1011
-
A revegetation option for saline tailings in Western AustraliaOsborne, J. M. / Brearley, D. R. et al. | 1995
- 1017
-
Performance monitoring on the excavability of dragline - A case studyOezdogan, M. / Pasamehmetoglu, A. G. / Karpuz, C. / Hindistan, M. A. et al. | 1995
- 1023
-
Stress-deformed state of laminated anisotropic environment with cavity or inclusionPankratova, N. D. / Vasilenko, A. T. et al. | 1995
- 1029
-
Developing a mechanical hard rock splitterParaszczak, J. / Dupont, P. / Hadjigeorgiou, J. / Savard, M. et al. | 1995
- 1037
-
Application of geotextiles for stabilizing underground spacesPipiska, V. / Sedlaty, V. / Durove, J. / Maras, M. et al. | 1995
- 1041
-
The application of the concept of brittle-ductile transition to slope behaviourPoulsom, A. J. et al. | 1995
- 1047
-
The effect of cutting pattern geometry on the performance of pick arrays in machine miningRoxborough, F. F. / Liu, Z. C. / Chen, L. et al. | 1995
- 1055
-
Design of up-building the tailing pond in the Copper Mine MajdanpekSalatic, P. / Deusic, S. / Salatic, V. / Grbovic, M. et al. | 1995
- 1061
-
Geotechnical concerns with the design and application of spoil-side dragline operations at the Vesta Mine, East-Central AlbertaSimpson, C. / Horsfield, D. W. et al. | 1995
- 1069
-
Bolted voussoir rock roof beds with large deflectionsSofianos, A. I. / Kapenis, A. P. et al. | 1995
- 1075
-
The influence of horizontal stresses on the stability of surface coal mine footwall slopesStead, D. / Eberhardt, E. / Benko, B. et al. | 1995
- 1081
-
Sequential blasting: Problems faced by Chettinad CementsSundar, K. S. et al. | 1995
- 1091
-
Integrated mine water management planning for environmental protection and mine profitabilitySawatsky, L. F. / Beckstead, G. / Long, D. et al. | 1995
- 1095
-
A simple method to obtain size distribution of a rock heap using its segregation characteristicsUjihira, M. / Takagai, N. / Ogawa, K. / Mizushima, S. et al. | 1995
- 1101
-
Reduction of environmental pollution caused by transport vehicles in quarriesUshakov, V. V. et al. | 1995
- 1103
-
Industrial design and test of a backfill mining system under complex geological conditions in ChinaYang, G. / Zhang, J. et al. | 1995
- 1109
-
The system of geomechanical monitoring for block-layered massif of salt rockZhuravkov, M. A. / Andreyko, S. S. / Martunenko, M. D. et al. | 1995