Engineering the Virtual Enterprise (Englisch)
- Neue Suche nach: Leigh Reid, R.
- Neue Suche nach: Rogers, K. J.
- Neue Suche nach: Johnson, M. E.
- Neue Suche nach: Liles, D. H.
- Neue Suche nach: Leigh Reid, R.
- Neue Suche nach: Rogers, K. J.
- Neue Suche nach: Johnson, M. E.
- Neue Suche nach: Liles, D. H.
- Neue Suche nach: Askin, R. G.
- Neue Suche nach: Bidanda, B.
- Neue Suche nach: Jagdale, S.
In:
Industrial engineering research conference
;
485-490
;
1996
-
ISBN:
- Aufsatz (Konferenz) / Print
-
Titel:Engineering the Virtual Enterprise
-
Beteiligte:Leigh Reid, R. ( Autor:in ) / Rogers, K. J. ( Autor:in ) / Johnson, M. E. ( Autor:in ) / Liles, D. H. ( Autor:in ) / Askin, R. G. / Bidanda, B. / Jagdale, S.
-
Kongress:5th, Industrial engineering research conference ; 1996 ; Minneapolis; MN
-
Erschienen in:
-
Verlag:
- Neue Suche nach: Institute of Industrial Engineers
-
Erscheinungsdatum:01.01.1996
-
Format / Umfang:6 pages
-
Anmerkungen:Also known as IERC5
-
ISBN:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Inhaltsverzeichnis Konferenzband
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
Minimizing Inter-Cell Movements for Tool Assignment Problems Using Art-IIChopra, M. / Wu, C.-H. / Ben-Arieh, D. et al. | 1996
- 7
-
Developing a PC-Based Tool for Re-design of Small and Medium Scale Manufacturing SystemsRao, H. A. / Gu, P. et al. | 1996
- 13
-
A Concurrent Engineering Framework for Designing Cellular Manufacturing SystemsPortioli, A. / Singh, N. et al. | 1996
- 19
-
Integrated Cell Formation and Layout Design for Multiple-Cell Manufacturing Systems with Flexible Processing and RoutingHo, Y.-C. / Moodie, C. L. et al. | 1996
- 25
-
Consolidating the Machines in the Existing Functional Manufacturing System for Setting up Manufacturing Cells in A-Bay at McClellan AFBLogendran, R. / Yunan et al. | 1996
- 31
-
Machine-Part Cell Formation and Operation AllocationYang, Z. / Malakooti, B. et al. | 1996
- 37
-
On the Usage of a Computer Aided Checkweigh Inspection System in an Assembly CellBillo, R. E. / LaScola Needy, K. / Barbe, T. A. et al. | 1996
- 43
-
Solving Cell Formation Problems Using ART1&TSChen, M.-L. / Chen, C.-L. et al. | 1996
- 49
-
A Model for the Dedicated Cell Loading Policy for Manufacturing CellsIyer, A. / Askin, R. G. et al. | 1996
- 55
-
Reliability Consideration in the Comparison of Job Shop and Cellular ManufacturingSeifoddini, H. / Djassemi, M. et al. | 1996
- 59
-
Chatter Detection in Milling Process Via Time-Frequency DistributionChen, Y. / Li, X. / Orady, E. et al. | 1996
- 65
-
Develop a Neural Network-Based Automated Dispatching Rule SelectorLiu, H. / Dong, J. et al. | 1996
- 71
-
Integrated Product Design and Process DevelopmentNyaluke, A. P. / Kamrani, A. / Leep, H. R. / Parsaei, H. R. et al. | 1996
- 74
-
Intelligent Maintenance System for RobotsPatel, S. A. / Kamrani, A. K. et al. | 1996
- 80
-
Developing a Software Emulator for the Control Architecture to the Ramp FMSDavis, W. J. / Macro, J. G. et al. | 1996
- 86
-
A Two Phase Heuristic Algorithm for Surface Mounting Devices with Fixed FeedersRim, S.-C. / Min, B.-D. / Kim, N.-H. et al. | 1996
- 91
-
Component Placement Error Model for Surface Mounted TechnologyLinn, R. et al. | 1996
- 97
-
Manufacturing Systems Control in Printed Wiring Board Assembly Using Distributed Artificial IntelligenceShih, W. / Srihari, K. / Emerson, C. R. et al. | 1996
- 103
-
A Lagrangian Relaxation Method for Single Machine Scheduling with a Common Delivery WindowWeng, M. / Ventura, J. et al. | 1996
- 109
-
A Single Machine Sequencing Problem with Variable Machining Times and Sequence-Dependent SetupsKolahan, F. / Liang, M. et al. | 1996
- 115
-
A Tabu Search Algorithm for Minimizing the Makespan in Job Shop SchedulingAl-Fawzan, M. A. / Al-Sultan, K. S. et al. | 1996
- 120
-
An Improved Algorithm for the Bottleneck Assignment ProblemKuo, C.-C. et al. | 1996
- 123
-
Robustness of an Analytic Model of the Serial Transfer Line Under Conditions of Non-Exponential Processing TimesLipset, R. / Sengupta, S. / Van Til, R. P. et al. | 1996
- 129
-
Flowshops with Passing: Conditions Where Order Processing Schedules Do Not Provide the Lowest Makespans in 3 Machine FlowshopsMeyer, R. / Starr, P. J. et al. | 1996
- 135
-
Using Distributed Computer Models to Solve Manufacturing Scheduling ProblemsKeyser, T. K. / Davis, R. P. et al. | 1996
- 141
-
Solving the FMS Part-Tool Grouping Problem Using Lagrangian Relaxation ApproachCheng, C.-B. / Wu, C.-H. et al. | 1996
- 147
-
Analysis of Integrated Flexible Assembly and Distribution SystemsChin, K.-C. / Noble, J. S. et al. | 1996
- 153
-
Buffered Flowline Performance: Covariance ConsiderationsVan Enns, S. T. et al. | 1996
- 158
-
Performance of Real-Time Distruibuted Arrival Time Control in Heterarchical Manufacturing SystemsPrabhu, V. / Duffie, N. et al. | 1996
- 164
-
Fuzzy Logic Controller for Part RoutingBen-Arieh, D. et al. | 1996
- 170
-
Formalization of Feature Relationships for Determining Sequencing of Machining Operations in Process PlanningAllada, V. / Agarwal, M. et al. | 1996
- 176
-
Process Plan Selection Considering Sequence-Dependent Setup CostsKasilingam, R. et al. | 1996
- 181
-
Generation of Geodesic Tool Path Data for Machining Free-Form Complex SurfacesMeenakshi Sundaram, R. / Gudaloor, P.-K. et al. | 1996
- 187
-
A Hybrid Machining Strategy for 2.5-D Pocket MachiningGau, Y.-S. / Veeramani, D. et al. | 1996
- 193
-
Development of a Generic Networking Utility for FMC ControlJagdale, S. / Merchant, N. et al. | 1996
- 199
-
Edge Detection Algorithms for Automatic Visual InspectionHou, T.-H. / Kuo, W.-L. et al. | 1996
- 205
-
Feature Recognition of Prismatic Parts for Shape Forming ProcessesNarang, R. V. et al. | 1996
- 211
-
Automated Fixturing of Prismatic Parts for Transportation in Flexible Manufacturing SystemsPlotnik, A. / Rubinovitz, J. et al. | 1996
- 217
-
A Hierarchical Fuzzy Model for Predicting Casting Time in a Slip-Casting ProcessSmith, A. / Petri, K. et al. | 1996
- 223
-
Theory of Chaos Based Techniques for Process MonitoringKumara, S. R. T. / Bukkapatnam, S. T. S. / Lakhtakia, A. et al. | 1996
- 229
-
Application of Wavelets in Process ControlGor, T. B. / Alexander, S. M. et al. | 1996
- 233
-
A Hybrid Computer-Intelligent and User-Interactive Process Planning Framework for Four-Axis CNC Turning CentersVeeramani, D. / Stinnes, A. et al. | 1996
- 239
-
A New Three Dimensional Convex Hull Algorithm and Its Applications in Flatness EvaluationGasparraj, E. / Anand, S. et al. | 1996
- 245
-
AI-Based Performance Measurement in Manufacturing DesignBadiru, A. / Theodoracatos, V. / Sieger, D. B. et al. | 1996
- 251
-
The Experimental Frame: A Conceptual Structure for Developing a Comprehensive Manufacturing Analysis ToolTretheway, S. / Hunt, C. / Court, M. et al. | 1996
- 257
-
The Start Time Assumptions of Pert Network Models: Validation Using a Decision Stage ModelFernandez, A. / Armacost, R. / Pet-Edwards, J. et al. | 1996
- 263
-
An Overview of a Flexible Optimization Approach to Multi-Resource, Multi-Project Planning and SchedulingShankar, V. / Nagi, R. et al. | 1996
- 269
-
The Vehicle Routing Problem: A SurveyAl-Fawzan, M. A. / Al-Sultan, K. S. et al. | 1996
- 275
-
Stochastic and Dynamic Network Optimization Model for Minimizing Empty Container Allocation CostsTing, J.-H. / Cheung, R. / Chen, C.-Y. et al. | 1996
- 281
-
Integration of Just-In-Time Production and Material Handling for an Assembly EnvironmentAnwar, M. / Nagi, R. et al. | 1996
- 287
-
An Inventory Model with Inventory Level Dependent Demand Rate and ShortagesWang, M. / Hossein Cheraghi, S. et al. | 1996
- 293
-
Inventory and Pricing Policies for a Duopoly of Substitute ProductsOtake, T. / Jo Min, K. et al. | 1996
- 299
-
Determining the Number of Kanbans Using Simulation and Heuristic SearchHall, J. / Bowden, R. / Nichols, B. / Hadley, B. et al. | 1996
- 305
-
Reducing Work-in-Process Movement in One-Dimensional Machine Location ProblemNori, V. S. / Sarker, B. et al. | 1996
- 311
-
Modeling Two Stage Stochastic Linear ProgramsHigle, J. L. / Sen, S. et al. | 1996
- 321
-
An Adaptive Machine Bidding Strategy for Distributed Shop Floor Control Under Stochastic Parts DemandsWang, K.-J. / Veeramani, D. et al. | 1996
- 327
-
An Agglutinated Echelon Representation for the N/M/G/Cmax ProblemGarcia-Contreras, E. L. / Crowe, T. J. / Klein, C. M. et al. | 1996
- 333
-
Compensatory TolerancingGerth, R. et al. | 1996
- 339
-
A Comparative Evaluation of Algorithms Used for the Determination of Roundness ToleranceDamodaran, P. / Fernando, S. / Anand, S. et al. | 1996
- 345
-
The Use of Energy-Related Characteristics in Robust Product DesignWasserman, G. et al. | 1996
- 351
-
The Role of Product Specifications in Concurrent Engineering Based Product Design SystemsRoy, U. / Bharadwaj, B. et al. | 1996
- 357
-
Rapid and Accurate Cost Estimation of Sheet Metal PartsJoshi, P. / Veeramani, D. et al. | 1996
- 363
-
Developing Blackboard Systems for Product Design Using a Non-Directed Graph Decomposition AlgorithmChen, C.-H. / Occena, L. et al. | 1996
- 369
-
Knowledge-Based Design for Manufacture Assembly Critique System for Rotational Machined PartsChangchien, S. W. / Lin, L. et al. | 1996
- 375
-
Traditional Product Cost Estimation: Problems and an AlternativeFritz, R. / Kimbler, D. L. et al. | 1996
- 381
-
A Producibility Index with Process Capability and Manufacturing CostByun, J.-H. / Elsayed, E. A. / Chen, A. / Bruins, R. et al. | 1996
- 387
-
CT Imaging of Hardware Logs for Lumber ProductionSchmoldt, D. / Li, P. / Abbott, A. L. et al. | 1996
- 393
-
3D Shape Model for Generating Log and Knot Defect GenerationChen, W. / Occena, L. et al. | 1996
- 399
-
An Optimal Production Flow Control Problem with Piecewise Constant DemandBai, S. / Varanasi, S. et al. | 1996
- 405
-
Organizing Mass Customizing Factory into a Flexible Network of ProcessorsOlivier, C. / Marcotte, S. / Montreuil, B. / Lefrancois, P. et al. | 1996
- 411
-
A Genetic Approach to the Material Flow Network Design Problem in SFT Based SystemsSinriech, D. / Edouard, S. et al. | 1996
- 417
-
Production and Setup Control in a Stochastic Manufacturing SystemElHafsi, M. / Bai, S. et al. | 1996
- 423
-
Single Machine Scheduling with Controllable Processing Times and Compression CostsZhang, F. / Li, S. / Foulds, L. R. / Tang, G. et al. | 1996
- 429
-
Evaluation of Production Control Policies Via Simulation Experiment Design and AnalysisBai, S. / Nambiar, V. / Peredo, C. / Tseng, Y. et al. | 1996
- 435
-
Optimal Reliability Allocation in Series-Parallel Systems from Components' Discrete Cost-Reliability Data Sets: A Nested Simulated Annealing ApproachMajety, S. R. V. / Venkatasubramanian, S. / Smith, A. E. et al. | 1996
- 441
-
Teams in the Aircraft Maintenance EnvironmentKraus, D. C. / Gramopadhye, A. K. / Blackmon, R. B. et al. | 1996
- 447
-
Using the Aircraft Inspector's Training System (AITS) to Improve Quality of Aircraft InspectionBlackmon, R. B. / Gramopadhye, A. K. et al. | 1996
- 453
-
Nonparametric Models for Analyzing Failure Time Data of Aging Aircraft with Multiple StressesShyur, H.-J. / Luxhoj, J. T. et al. | 1996
- 459
-
Stochastic Formulations of the Redundancy Allocation ProblemCoit, D. W. / Smith, A. E. et al. | 1996
- 464
-
The Effect of Modular System Structures on Component Reliability EstimationUsher, J. S. / Aboul-Seoud, M. H. et al. | 1996
- 468
-
A Framework for Developing Intelligent Decision Aids to Support Adaptive Human-System InteractionNtuen, C. A. / Koubek, R. et al. | 1996
- 473
-
Multi-Agent Coordination Using Dynamic Virtual Clustering in a Distributed Manufacturing SystemMaturana, F. P. / Norrie, D. H. et al. | 1996
- 479
-
The Enterprise Engineering DisciplineLiles, D. H. / Johnson, M. E. / Meade, L. et al. | 1996
- 485
-
Engineering the Virtual EnterpriseLeigh Reid, R. / Rogers, K. J. / Johnson, M. E. / Liles, D. H. et al. | 1996
- 491
-
Production Planning and Scheduling in Virtual ManufacturingHe, D. / Kusiak, A. et al. | 1996
- 497
-
Toward a Hierarchical, Real-Time Scheduling System for Manufacturing CellsJones, A. / Yih, Y. / Sun, Y.-L. et al. | 1996
- 503
-
Component Selection Using Hybrid Optimization AlgorithmsRoy, U. / Liao, J. et al. | 1996
- 509
-
Integrated Evolutionary Computation Neural Network Quality Controller for Automated SystemsPatro, S. / Kolarik, W. J. et al. | 1996
- 515
-
Evaluating Organizational Performance with Multiple Performance MeasuresPark, C. / Occe�a, L. G. et al. | 1996
- 521
-
Supporting Organizational Learning in a Manufacturing EnvironmentKotnour, T. et al. | 1996
- 527
-
In the Eyes of the Beholder: Employee Perceptions of Manufacturing Improvement Team ProgramsBailey, D. E. et al. | 1996
- 533
-
A Quantitative Assessment of Manufacturing Team Influence on Work Group PerformanceBailey, D. E. et al. | 1996
- 539
-
Analyzing the Supplier/Customer Relationship: An Industrial Case StudyLarson, N. / Kusiak, A. / Clymer, D. / Thompson, G. et al. | 1996
- 545
-
The Industrial Engineering Role in Industry/University PartnershipsGerstenfeld, A. et al. | 1996
- 551
-
On Integrating Work Measurement Systems with Voice Recognition TechnologiesCohen, Y. / Bidanda, B. / Billo, R. E. / Zandin, K. B. et al. | 1996
- 557
-
Analysis and Modeling of the Impact of ISO-9000 on Small and Medium Size Manufacturing CompaniesGulley, W. / Velasco, T. et al. | 1996
- 562
-
A Quality Based Change Approach for Redesigning Product Development ProcessesYazici, H. / Kemal Tugcu, A. et al. | 1996
- 568
-
An Integrated Information Framework for Agile ManufacturingSong, L. / Nagi, R. et al. | 1996
- 574
-
Managing Multiple Projects: Leadership ChallengesWyrick, D. A. et al. | 1996
- 579
-
Case Study: HEMPAC - Hibbing Electronics MIP ProjectVoss, J. C. et al. | 1996
- 583
-
Learning Organizations for Continuous ImprovementYu, W. / Zong, Y. et al. | 1996
- 588
-
Outreach Service as a Scholarship Activity for FacultyAlden Kendall, L. et al. | 1996
- 593
-
The Use of Qualitative Research in Exploring Complex Manufacturing IssuesPeterson, W. R. et al. | 1996
- 596
-
Center for Electronics ManufacturingVillalobos, J. R. / Leon, V. J. et al. | 1996
- 602
-
The Electronics Agile Manufacturing Research Institute: A R&D Collaborative Enterprise in ElectronicsGraves, R. J. et al. | 1996
- 606
-
A Local Search Algorithm for Heavily Constrained Bi-Criterion Scheduling ProblemsNaphade, K. S. / Doshi, B. H. / Wu, S. D. / Storer, R. H. et al. | 1996
- 612
-
Melt Scheduling Problems in the Steel Industry - A Case Study at the Bethforge CorporationDoshi, B. J. / Naphade, K. S. / Storer, R. H. / Wu, S. D. et al. | 1996
- 618
-
Restructuring a House of Quality Using Factor AnalysisKim, K.-J. / Shin, J.-S. et al. | 1996
- 623
-
Managing Total Quality Management ImplementationSepehri, M. / Zargar, A. M. et al. | 1996
- 629
-
Calculating the Risk of Customer Dissatisfaction in the Telecommunications IndustryStevenson, S. / Dooley, K. J. et al. | 1996
- 635
-
Queuing Theory Approach for WIP Storage Space Sizing ProblemMeyersdorf, D. / Biron, O. / Ponte, A. et al. | 1996
- 639
-
Optimal Maintenance Inspection Frequency: A Multicriteria ApproachIslam, A.-U. / Eksioglu, M. et al. | 1996
- 645
-
Identification Strategies for Determining the Types of Transient EffectsShao, Y. E. et al. | 1996
- 650
-
Quality Improvement by RSM Modeling for Robust DesignCho, B.-R. / Phillips, M. D. / Kapur, K. C. et al. | 1996
- 656
-
Sampling Efficiency Increases Derived from Skipping ObservationsShu, M.-H. / Pape, E. S. et al. | 1996
- 661
-
A Comparison of Control Chart Schemes to Monitor Information Systems TransactionsBatson, R. G. / Moynihan, G. P. / Henderson, E. / Albright, T. L. et al. | 1996
- 667
-
On the Properties of Exponentially Weighted Moving Average Control Charts for Low Volume ProductionsChang, S. I. / Lin, S.-Y. et al. | 1996
- 673
-
Statistical Quality Control of Processes Generating Time Dependent DataEnglish, J. R. et al. | 1996
- 678
-
An Inspection Model with Minimal Repair for a Deteriorating SystemChaudhuri, D. / Mohammed, O. E. et al. | 1996
- 683
-
Process Monitoring with Principal Components and Partial Least SquaresRhoads, T. R. / Montgomery, D. C. et al. | 1996
- 687
-
Variable Sampling Rate Control Charts with Sampling at Fixed IntervalsStoumbos, Z. G. / Reynolds, M. R. et al. | 1996
- 693
-
Simultaneous Monitoring for Process Location and Dispersion without SubgroupingAcosta, C. A. / Pignatiello, J. J. et al. | 1996
- 699
-
Joint Economic Design of X-bar and R Charts with Adaptive Dual Sampling PolicyLerin, E. / Das, T. K. et al. | 1996
- 705
-
Application of Cornish-Fisher Expansion in Estimating Process Capability IndicesMohsen, H. A. / Wasserman, G. S. et al. | 1996
- 711
-
Extensions of Principal Component Analysis for Data Intensive ComputingSudjianto, A. / Wasserman, G. S. / Hassoun, M. H. et al. | 1996
- 717
-
An Evaluation of Neural Networks as a Tool for Predicting Workplace Accommodations for Persons with DisabilitiesHarden, E. L. / Crumpton, L. / Killough, M. K. et al. | 1996
- 723
-
Toward a Multicriterion Analysis for the Prevention of Low Back PainNadeau, S. / Gilbert, R. / Leblanc, D. et al. | 1996
- 729
-
An Investigation of Wearing Wrist Splints While Performing Work TasksAgostinelli, T. / Crumpton, L. L. / Soh, T.-N. et al. | 1996
- 735
-
An Investigation of Body Discomfort Experienced by Older WorkersWilliams, S. N. / Crumpton, L. L. / Lee Yee Yap et al. | 1996
- 741
-
An Evaluation of Fatigue Indicators While Performing Nursing TasksSoh, T.-N. / Crumpton, L. L. et al. | 1996
- 747
-
The Effects of Fatigue on Lifting PostureResnick, M. et al. | 1996
- 752
-
Model-Based Engineering Software Systems IntegrationKoonce, D. A. / Judd, R. P. / Parks, C. M. et al. | 1996
- 758
-
QUESTER: A Computer-Integrated System for Virtual Shopping Through the InternetWong, C.-C. / Chalermdamrichai, V. / Veeramani, D. et al. | 1996
- 764
-
Manufacturing Assistance Program and Disaster Recovery ModelAdams, S. K. / Even, J. C. / Espeland, B. T. / Hall, J. L. et al. | 1996
- 769
-
An Exhaustive Search Algorithm for Determining Optimal Equipment Replacement PoliciesBoner, W. / Fleischer, G. A. / Dessouky, M. M. et al. | 1996
- 775
-
An Efficient Model for Large Parallel Replacement ProblemsHartman, J. C. / Lohmann, J. R. et al. | 1996
- 781
-
CAD Directed On Line Cost Estimation Using Activity Based CostingSubbaraman, M. / Paramaguru, R. / Anand, S. / Que, P. C. et al. | 1996
- 787
-
A Cost Model for Evaluating Alternative Cellular Manufacturing ConfigurationsNeedy, K. L. / Billo, R. E. / Colosimo, R. L. et al. | 1996
- 793
-
A Non-Traditional Economic Justification Model for Advanced TechnologiesBerardi, M. / Bidanda, B. et al. | 1996
- 799
-
Integration of Economics with Engineering Design: Statistical Analysis and FindingsThuesen, G. P. / Hartman, J. C. / Sullivan, W. G. / Walker, W. et al. | 1996
- 803
-
Definition and Quantification of System Interference in Flexible Manufacturing SystemsPiplani, R. / Talavage, J. J. et al. | 1996
- 809
-
A Protocol for Parallel Communication Between Dissimilar Controllers Using Discrete I/O: Software ImplementationShelby, J. M. / Velasco, T. et al. | 1996
- 812
-
A Strategy for Integration of Automation Control FunctionsRichmond, D. B. / Velasco, T. et al. | 1996
- 818
-
Simulation and Tabu Search in ManufacturingStarks, D. W. / Evans, G. W. et al. | 1996