Engineering the Virtual Enterprise (English)
- New search for: Leigh Reid, R.
- New search for: Rogers, K. J.
- New search for: Johnson, M. E.
- New search for: Liles, D. H.
- New search for: Leigh Reid, R.
- New search for: Rogers, K. J.
- New search for: Johnson, M. E.
- New search for: Liles, D. H.
- New search for: Askin, R. G.
- New search for: Bidanda, B.
- New search for: Jagdale, S.
In:
Industrial engineering research conference
;
485-490
;
1996
-
ISBN:
- Conference paper / Print
-
Title:Engineering the Virtual Enterprise
-
Contributors:Leigh Reid, R. ( author ) / Rogers, K. J. ( author ) / Johnson, M. E. ( author ) / Liles, D. H. ( author ) / Askin, R. G. / Bidanda, B. / Jagdale, S.
-
Conference:5th, Industrial engineering research conference ; 1996 ; Minneapolis; MN
-
Published in:
-
Publisher:
- New search for: Institute of Industrial Engineers
-
Publication date:1996-01-01
-
Size:6 pages
-
Remarks:Also known as IERC5
-
ISBN:
-
Type of media:Conference paper
-
Type of material:Print
-
Language:English
-
Keywords:
-
Source:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Table of contents conference proceedings
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1
-
Minimizing Inter-Cell Movements for Tool Assignment Problems Using Art-IIChopra, M. / Wu, C.-H. / Ben-Arieh, D. et al. | 1996
- 7
-
Developing a PC-Based Tool for Re-design of Small and Medium Scale Manufacturing SystemsRao, H. A. / Gu, P. et al. | 1996
- 13
-
A Concurrent Engineering Framework for Designing Cellular Manufacturing SystemsPortioli, A. / Singh, N. et al. | 1996
- 19
-
Integrated Cell Formation and Layout Design for Multiple-Cell Manufacturing Systems with Flexible Processing and RoutingHo, Y.-C. / Moodie, C. L. et al. | 1996
- 25
-
Consolidating the Machines in the Existing Functional Manufacturing System for Setting up Manufacturing Cells in A-Bay at McClellan AFBLogendran, R. / Yunan et al. | 1996
- 31
-
Machine-Part Cell Formation and Operation AllocationYang, Z. / Malakooti, B. et al. | 1996
- 37
-
On the Usage of a Computer Aided Checkweigh Inspection System in an Assembly CellBillo, R. E. / LaScola Needy, K. / Barbe, T. A. et al. | 1996
- 43
-
Solving Cell Formation Problems Using ART1&TSChen, M.-L. / Chen, C.-L. et al. | 1996
- 49
-
A Model for the Dedicated Cell Loading Policy for Manufacturing CellsIyer, A. / Askin, R. G. et al. | 1996
- 55
-
Reliability Consideration in the Comparison of Job Shop and Cellular ManufacturingSeifoddini, H. / Djassemi, M. et al. | 1996
- 59
-
Chatter Detection in Milling Process Via Time-Frequency DistributionChen, Y. / Li, X. / Orady, E. et al. | 1996
- 65
-
Develop a Neural Network-Based Automated Dispatching Rule SelectorLiu, H. / Dong, J. et al. | 1996
- 71
-
Integrated Product Design and Process DevelopmentNyaluke, A. P. / Kamrani, A. / Leep, H. R. / Parsaei, H. R. et al. | 1996
- 74
-
Intelligent Maintenance System for RobotsPatel, S. A. / Kamrani, A. K. et al. | 1996
- 80
-
Developing a Software Emulator for the Control Architecture to the Ramp FMSDavis, W. J. / Macro, J. G. et al. | 1996
- 86
-
A Two Phase Heuristic Algorithm for Surface Mounting Devices with Fixed FeedersRim, S.-C. / Min, B.-D. / Kim, N.-H. et al. | 1996
- 91
-
Component Placement Error Model for Surface Mounted TechnologyLinn, R. et al. | 1996
- 97
-
Manufacturing Systems Control in Printed Wiring Board Assembly Using Distributed Artificial IntelligenceShih, W. / Srihari, K. / Emerson, C. R. et al. | 1996
- 103
-
A Lagrangian Relaxation Method for Single Machine Scheduling with a Common Delivery WindowWeng, M. / Ventura, J. et al. | 1996
- 109
-
A Single Machine Sequencing Problem with Variable Machining Times and Sequence-Dependent SetupsKolahan, F. / Liang, M. et al. | 1996
- 115
-
A Tabu Search Algorithm for Minimizing the Makespan in Job Shop SchedulingAl-Fawzan, M. A. / Al-Sultan, K. S. et al. | 1996
- 120
-
An Improved Algorithm for the Bottleneck Assignment ProblemKuo, C.-C. et al. | 1996
- 123
-
Robustness of an Analytic Model of the Serial Transfer Line Under Conditions of Non-Exponential Processing TimesLipset, R. / Sengupta, S. / Van Til, R. P. et al. | 1996
- 129
-
Flowshops with Passing: Conditions Where Order Processing Schedules Do Not Provide the Lowest Makespans in 3 Machine FlowshopsMeyer, R. / Starr, P. J. et al. | 1996
- 135
-
Using Distributed Computer Models to Solve Manufacturing Scheduling ProblemsKeyser, T. K. / Davis, R. P. et al. | 1996
- 141
-
Solving the FMS Part-Tool Grouping Problem Using Lagrangian Relaxation ApproachCheng, C.-B. / Wu, C.-H. et al. | 1996
- 147
-
Analysis of Integrated Flexible Assembly and Distribution SystemsChin, K.-C. / Noble, J. S. et al. | 1996
- 153
-
Buffered Flowline Performance: Covariance ConsiderationsVan Enns, S. T. et al. | 1996
- 158
-
Performance of Real-Time Distruibuted Arrival Time Control in Heterarchical Manufacturing SystemsPrabhu, V. / Duffie, N. et al. | 1996
- 164
-
Fuzzy Logic Controller for Part RoutingBen-Arieh, D. et al. | 1996
- 170
-
Formalization of Feature Relationships for Determining Sequencing of Machining Operations in Process PlanningAllada, V. / Agarwal, M. et al. | 1996
- 176
-
Process Plan Selection Considering Sequence-Dependent Setup CostsKasilingam, R. et al. | 1996
- 181
-
Generation of Geodesic Tool Path Data for Machining Free-Form Complex SurfacesMeenakshi Sundaram, R. / Gudaloor, P.-K. et al. | 1996
- 187
-
A Hybrid Machining Strategy for 2.5-D Pocket MachiningGau, Y.-S. / Veeramani, D. et al. | 1996
- 193
-
Development of a Generic Networking Utility for FMC ControlJagdale, S. / Merchant, N. et al. | 1996
- 199
-
Edge Detection Algorithms for Automatic Visual InspectionHou, T.-H. / Kuo, W.-L. et al. | 1996
- 205
-
Feature Recognition of Prismatic Parts for Shape Forming ProcessesNarang, R. V. et al. | 1996
- 211
-
Automated Fixturing of Prismatic Parts for Transportation in Flexible Manufacturing SystemsPlotnik, A. / Rubinovitz, J. et al. | 1996
- 217
-
A Hierarchical Fuzzy Model for Predicting Casting Time in a Slip-Casting ProcessSmith, A. / Petri, K. et al. | 1996
- 223
-
Theory of Chaos Based Techniques for Process MonitoringKumara, S. R. T. / Bukkapatnam, S. T. S. / Lakhtakia, A. et al. | 1996
- 229
-
Application of Wavelets in Process ControlGor, T. B. / Alexander, S. M. et al. | 1996
- 233
-
A Hybrid Computer-Intelligent and User-Interactive Process Planning Framework for Four-Axis CNC Turning CentersVeeramani, D. / Stinnes, A. et al. | 1996
- 239
-
A New Three Dimensional Convex Hull Algorithm and Its Applications in Flatness EvaluationGasparraj, E. / Anand, S. et al. | 1996
- 245
-
AI-Based Performance Measurement in Manufacturing DesignBadiru, A. / Theodoracatos, V. / Sieger, D. B. et al. | 1996
- 251
-
The Experimental Frame: A Conceptual Structure for Developing a Comprehensive Manufacturing Analysis ToolTretheway, S. / Hunt, C. / Court, M. et al. | 1996
- 257
-
The Start Time Assumptions of Pert Network Models: Validation Using a Decision Stage ModelFernandez, A. / Armacost, R. / Pet-Edwards, J. et al. | 1996
- 263
-
An Overview of a Flexible Optimization Approach to Multi-Resource, Multi-Project Planning and SchedulingShankar, V. / Nagi, R. et al. | 1996
- 269
-
The Vehicle Routing Problem: A SurveyAl-Fawzan, M. A. / Al-Sultan, K. S. et al. | 1996
- 275
-
Stochastic and Dynamic Network Optimization Model for Minimizing Empty Container Allocation CostsTing, J.-H. / Cheung, R. / Chen, C.-Y. et al. | 1996
- 281
-
Integration of Just-In-Time Production and Material Handling for an Assembly EnvironmentAnwar, M. / Nagi, R. et al. | 1996
- 287
-
An Inventory Model with Inventory Level Dependent Demand Rate and ShortagesWang, M. / Hossein Cheraghi, S. et al. | 1996
- 293
-
Inventory and Pricing Policies for a Duopoly of Substitute ProductsOtake, T. / Jo Min, K. et al. | 1996
- 299
-
Determining the Number of Kanbans Using Simulation and Heuristic SearchHall, J. / Bowden, R. / Nichols, B. / Hadley, B. et al. | 1996
- 305
-
Reducing Work-in-Process Movement in One-Dimensional Machine Location ProblemNori, V. S. / Sarker, B. et al. | 1996
- 311
-
Modeling Two Stage Stochastic Linear ProgramsHigle, J. L. / Sen, S. et al. | 1996
- 321
-
An Adaptive Machine Bidding Strategy for Distributed Shop Floor Control Under Stochastic Parts DemandsWang, K.-J. / Veeramani, D. et al. | 1996
- 327
-
An Agglutinated Echelon Representation for the N/M/G/Cmax ProblemGarcia-Contreras, E. L. / Crowe, T. J. / Klein, C. M. et al. | 1996
- 333
-
Compensatory TolerancingGerth, R. et al. | 1996
- 339
-
A Comparative Evaluation of Algorithms Used for the Determination of Roundness ToleranceDamodaran, P. / Fernando, S. / Anand, S. et al. | 1996
- 345
-
The Use of Energy-Related Characteristics in Robust Product DesignWasserman, G. et al. | 1996
- 351
-
The Role of Product Specifications in Concurrent Engineering Based Product Design SystemsRoy, U. / Bharadwaj, B. et al. | 1996
- 357
-
Rapid and Accurate Cost Estimation of Sheet Metal PartsJoshi, P. / Veeramani, D. et al. | 1996
- 363
-
Developing Blackboard Systems for Product Design Using a Non-Directed Graph Decomposition AlgorithmChen, C.-H. / Occena, L. et al. | 1996
- 369
-
Knowledge-Based Design for Manufacture Assembly Critique System for Rotational Machined PartsChangchien, S. W. / Lin, L. et al. | 1996
- 375
-
Traditional Product Cost Estimation: Problems and an AlternativeFritz, R. / Kimbler, D. L. et al. | 1996
- 381
-
A Producibility Index with Process Capability and Manufacturing CostByun, J.-H. / Elsayed, E. A. / Chen, A. / Bruins, R. et al. | 1996
- 387
-
CT Imaging of Hardware Logs for Lumber ProductionSchmoldt, D. / Li, P. / Abbott, A. L. et al. | 1996
- 393
-
3D Shape Model for Generating Log and Knot Defect GenerationChen, W. / Occena, L. et al. | 1996
- 399
-
An Optimal Production Flow Control Problem with Piecewise Constant DemandBai, S. / Varanasi, S. et al. | 1996
- 405
-
Organizing Mass Customizing Factory into a Flexible Network of ProcessorsOlivier, C. / Marcotte, S. / Montreuil, B. / Lefrancois, P. et al. | 1996
- 411
-
A Genetic Approach to the Material Flow Network Design Problem in SFT Based SystemsSinriech, D. / Edouard, S. et al. | 1996
- 417
-
Production and Setup Control in a Stochastic Manufacturing SystemElHafsi, M. / Bai, S. et al. | 1996
- 423
-
Single Machine Scheduling with Controllable Processing Times and Compression CostsZhang, F. / Li, S. / Foulds, L. R. / Tang, G. et al. | 1996
- 429
-
Evaluation of Production Control Policies Via Simulation Experiment Design and AnalysisBai, S. / Nambiar, V. / Peredo, C. / Tseng, Y. et al. | 1996
- 435
-
Optimal Reliability Allocation in Series-Parallel Systems from Components' Discrete Cost-Reliability Data Sets: A Nested Simulated Annealing ApproachMajety, S. R. V. / Venkatasubramanian, S. / Smith, A. E. et al. | 1996
- 441
-
Teams in the Aircraft Maintenance EnvironmentKraus, D. C. / Gramopadhye, A. K. / Blackmon, R. B. et al. | 1996
- 447
-
Using the Aircraft Inspector's Training System (AITS) to Improve Quality of Aircraft InspectionBlackmon, R. B. / Gramopadhye, A. K. et al. | 1996
- 453
-
Nonparametric Models for Analyzing Failure Time Data of Aging Aircraft with Multiple StressesShyur, H.-J. / Luxhoj, J. T. et al. | 1996
- 459
-
Stochastic Formulations of the Redundancy Allocation ProblemCoit, D. W. / Smith, A. E. et al. | 1996
- 464
-
The Effect of Modular System Structures on Component Reliability EstimationUsher, J. S. / Aboul-Seoud, M. H. et al. | 1996
- 468
-
A Framework for Developing Intelligent Decision Aids to Support Adaptive Human-System InteractionNtuen, C. A. / Koubek, R. et al. | 1996
- 473
-
Multi-Agent Coordination Using Dynamic Virtual Clustering in a Distributed Manufacturing SystemMaturana, F. P. / Norrie, D. H. et al. | 1996
- 479
-
The Enterprise Engineering DisciplineLiles, D. H. / Johnson, M. E. / Meade, L. et al. | 1996
- 485
-
Engineering the Virtual EnterpriseLeigh Reid, R. / Rogers, K. J. / Johnson, M. E. / Liles, D. H. et al. | 1996
- 491
-
Production Planning and Scheduling in Virtual ManufacturingHe, D. / Kusiak, A. et al. | 1996
- 497
-
Toward a Hierarchical, Real-Time Scheduling System for Manufacturing CellsJones, A. / Yih, Y. / Sun, Y.-L. et al. | 1996
- 503
-
Component Selection Using Hybrid Optimization AlgorithmsRoy, U. / Liao, J. et al. | 1996
- 509
-
Integrated Evolutionary Computation Neural Network Quality Controller for Automated SystemsPatro, S. / Kolarik, W. J. et al. | 1996
- 515
-
Evaluating Organizational Performance with Multiple Performance MeasuresPark, C. / Occe�a, L. G. et al. | 1996
- 521
-
Supporting Organizational Learning in a Manufacturing EnvironmentKotnour, T. et al. | 1996
- 527
-
In the Eyes of the Beholder: Employee Perceptions of Manufacturing Improvement Team ProgramsBailey, D. E. et al. | 1996
- 533
-
A Quantitative Assessment of Manufacturing Team Influence on Work Group PerformanceBailey, D. E. et al. | 1996
- 539
-
Analyzing the Supplier/Customer Relationship: An Industrial Case StudyLarson, N. / Kusiak, A. / Clymer, D. / Thompson, G. et al. | 1996
- 545
-
The Industrial Engineering Role in Industry/University PartnershipsGerstenfeld, A. et al. | 1996
- 551
-
On Integrating Work Measurement Systems with Voice Recognition TechnologiesCohen, Y. / Bidanda, B. / Billo, R. E. / Zandin, K. B. et al. | 1996
- 557
-
Analysis and Modeling of the Impact of ISO-9000 on Small and Medium Size Manufacturing CompaniesGulley, W. / Velasco, T. et al. | 1996
- 562
-
A Quality Based Change Approach for Redesigning Product Development ProcessesYazici, H. / Kemal Tugcu, A. et al. | 1996
- 568
-
An Integrated Information Framework for Agile ManufacturingSong, L. / Nagi, R. et al. | 1996
- 574
-
Managing Multiple Projects: Leadership ChallengesWyrick, D. A. et al. | 1996
- 579
-
Case Study: HEMPAC - Hibbing Electronics MIP ProjectVoss, J. C. et al. | 1996
- 583
-
Learning Organizations for Continuous ImprovementYu, W. / Zong, Y. et al. | 1996
- 588
-
Outreach Service as a Scholarship Activity for FacultyAlden Kendall, L. et al. | 1996
- 593
-
The Use of Qualitative Research in Exploring Complex Manufacturing IssuesPeterson, W. R. et al. | 1996
- 596
-
Center for Electronics ManufacturingVillalobos, J. R. / Leon, V. J. et al. | 1996
- 602
-
The Electronics Agile Manufacturing Research Institute: A R&D Collaborative Enterprise in ElectronicsGraves, R. J. et al. | 1996
- 606
-
A Local Search Algorithm for Heavily Constrained Bi-Criterion Scheduling ProblemsNaphade, K. S. / Doshi, B. H. / Wu, S. D. / Storer, R. H. et al. | 1996
- 612
-
Melt Scheduling Problems in the Steel Industry - A Case Study at the Bethforge CorporationDoshi, B. J. / Naphade, K. S. / Storer, R. H. / Wu, S. D. et al. | 1996
- 618
-
Restructuring a House of Quality Using Factor AnalysisKim, K.-J. / Shin, J.-S. et al. | 1996
- 623
-
Managing Total Quality Management ImplementationSepehri, M. / Zargar, A. M. et al. | 1996
- 629
-
Calculating the Risk of Customer Dissatisfaction in the Telecommunications IndustryStevenson, S. / Dooley, K. J. et al. | 1996
- 635
-
Queuing Theory Approach for WIP Storage Space Sizing ProblemMeyersdorf, D. / Biron, O. / Ponte, A. et al. | 1996
- 639
-
Optimal Maintenance Inspection Frequency: A Multicriteria ApproachIslam, A.-U. / Eksioglu, M. et al. | 1996
- 645
-
Identification Strategies for Determining the Types of Transient EffectsShao, Y. E. et al. | 1996
- 650
-
Quality Improvement by RSM Modeling for Robust DesignCho, B.-R. / Phillips, M. D. / Kapur, K. C. et al. | 1996
- 656
-
Sampling Efficiency Increases Derived from Skipping ObservationsShu, M.-H. / Pape, E. S. et al. | 1996
- 661
-
A Comparison of Control Chart Schemes to Monitor Information Systems TransactionsBatson, R. G. / Moynihan, G. P. / Henderson, E. / Albright, T. L. et al. | 1996
- 667
-
On the Properties of Exponentially Weighted Moving Average Control Charts for Low Volume ProductionsChang, S. I. / Lin, S.-Y. et al. | 1996
- 673
-
Statistical Quality Control of Processes Generating Time Dependent DataEnglish, J. R. et al. | 1996
- 678
-
An Inspection Model with Minimal Repair for a Deteriorating SystemChaudhuri, D. / Mohammed, O. E. et al. | 1996
- 683
-
Process Monitoring with Principal Components and Partial Least SquaresRhoads, T. R. / Montgomery, D. C. et al. | 1996
- 687
-
Variable Sampling Rate Control Charts with Sampling at Fixed IntervalsStoumbos, Z. G. / Reynolds, M. R. et al. | 1996
- 693
-
Simultaneous Monitoring for Process Location and Dispersion without SubgroupingAcosta, C. A. / Pignatiello, J. J. et al. | 1996
- 699
-
Joint Economic Design of X-bar and R Charts with Adaptive Dual Sampling PolicyLerin, E. / Das, T. K. et al. | 1996
- 705
-
Application of Cornish-Fisher Expansion in Estimating Process Capability IndicesMohsen, H. A. / Wasserman, G. S. et al. | 1996
- 711
-
Extensions of Principal Component Analysis for Data Intensive ComputingSudjianto, A. / Wasserman, G. S. / Hassoun, M. H. et al. | 1996
- 717
-
An Evaluation of Neural Networks as a Tool for Predicting Workplace Accommodations for Persons with DisabilitiesHarden, E. L. / Crumpton, L. / Killough, M. K. et al. | 1996
- 723
-
Toward a Multicriterion Analysis for the Prevention of Low Back PainNadeau, S. / Gilbert, R. / Leblanc, D. et al. | 1996
- 729
-
An Investigation of Wearing Wrist Splints While Performing Work TasksAgostinelli, T. / Crumpton, L. L. / Soh, T.-N. et al. | 1996
- 735
-
An Investigation of Body Discomfort Experienced by Older WorkersWilliams, S. N. / Crumpton, L. L. / Lee Yee Yap et al. | 1996
- 741
-
An Evaluation of Fatigue Indicators While Performing Nursing TasksSoh, T.-N. / Crumpton, L. L. et al. | 1996
- 747
-
The Effects of Fatigue on Lifting PostureResnick, M. et al. | 1996
- 752
-
Model-Based Engineering Software Systems IntegrationKoonce, D. A. / Judd, R. P. / Parks, C. M. et al. | 1996
- 758
-
QUESTER: A Computer-Integrated System for Virtual Shopping Through the InternetWong, C.-C. / Chalermdamrichai, V. / Veeramani, D. et al. | 1996
- 764
-
Manufacturing Assistance Program and Disaster Recovery ModelAdams, S. K. / Even, J. C. / Espeland, B. T. / Hall, J. L. et al. | 1996
- 769
-
An Exhaustive Search Algorithm for Determining Optimal Equipment Replacement PoliciesBoner, W. / Fleischer, G. A. / Dessouky, M. M. et al. | 1996
- 775
-
An Efficient Model for Large Parallel Replacement ProblemsHartman, J. C. / Lohmann, J. R. et al. | 1996
- 781
-
CAD Directed On Line Cost Estimation Using Activity Based CostingSubbaraman, M. / Paramaguru, R. / Anand, S. / Que, P. C. et al. | 1996
- 787
-
A Cost Model for Evaluating Alternative Cellular Manufacturing ConfigurationsNeedy, K. L. / Billo, R. E. / Colosimo, R. L. et al. | 1996
- 793
-
A Non-Traditional Economic Justification Model for Advanced TechnologiesBerardi, M. / Bidanda, B. et al. | 1996
- 799
-
Integration of Economics with Engineering Design: Statistical Analysis and FindingsThuesen, G. P. / Hartman, J. C. / Sullivan, W. G. / Walker, W. et al. | 1996
- 803
-
Definition and Quantification of System Interference in Flexible Manufacturing SystemsPiplani, R. / Talavage, J. J. et al. | 1996
- 809
-
A Protocol for Parallel Communication Between Dissimilar Controllers Using Discrete I/O: Software ImplementationShelby, J. M. / Velasco, T. et al. | 1996
- 812
-
A Strategy for Integration of Automation Control FunctionsRichmond, D. B. / Velasco, T. et al. | 1996
- 818
-
Simulation and Tabu Search in ManufacturingStarks, D. W. / Evans, G. W. et al. | 1996