Critical Path for Cryptosporidium Research: Results of AWWARF Process (Englisch)
- Neue Suche nach: Brink, D. R.
- Neue Suche nach: Hund, R.
- Neue Suche nach: Martin, K.
- Neue Suche nach: Brink, D. R.
- Neue Suche nach: Hund, R.
- Neue Suche nach: Martin, K.
- Neue Suche nach: Fricker, C. R.
- Neue Suche nach: Clancy, J. L.
- Neue Suche nach: Rochelle, P. A.
In:
Waterborne cryptosporidium
;
335-344
;
1997
-
ISBN:
- Aufsatz (Konferenz) / Print
-
Titel:Critical Path for Cryptosporidium Research: Results of AWWARF Process
-
Beteiligte:Brink, D. R. ( Autor:in ) / Hund, R. ( Autor:in ) / Martin, K. ( Autor:in ) / Fricker, C. R. / Clancy, J. L. / Rochelle, P. A.
-
Kongress:International symposium, Waterborne cryptosporidium ; 1997 ; Newport Beach; CA
-
Erschienen in:Waterborne cryptosporidium ; 335-344
-
Verlag:
- Neue Suche nach: American Water Works Association
-
Erscheinungsdatum:01.01.1997
-
Format / Umfang:10 pages
-
ISBN:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Inhaltsverzeichnis Konferenzband
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
The Concentration and Separation of Cryptosporidium Oocysts and Giardia Cysts Using Vortex Flow Filtration and Immunomagnetic SeparationFricker, C. R. / Jonas, A. / Crabb, J. / Turner, N. et al. | 1997
- 9
-
Routine Cytometric Detection of Cryptosporidium and Giardia: Recovery Rates and Quality ControlVeal, D. / Vesey, G. / Fricker, C. R. / Ongerth, J. et al. | 1997
- 21
-
Fluorescent In-situ Labeling of Viable Cryptosporidium parvum in Water SamplesVesey, G. / Deere, D. / Dorsch, M. / Veal, D. et al. | 1997
- 31
-
Optimization of an Infectivity Assay, Combining Cell Culture and PCR, for Waterborne Cryptosporidium parvumRochelle, P. A. / DeLeon, R. / Ferguson, D. M. / Stewart, M. H. et al. | 1997
- 41
-
Synergistic Effects of Sequential Exposure of Cryptosporidium Oocysts to Chemical DisinfectantsLiyanage, L. R. J. / Finch, G. R. / Belosevic, M. et al. | 1997
- 53
-
Sensitive Quantitative Detection/Identification of Infectious Cryptosporidium parvum Oocysts by Signature Lipid Biomarker AnalysisWhite, D. C. / Alugupalli, S. / Schrum, D. P. / Kelly, S. T. et al. | 1997
- 61
-
Detection of Cryptosporidium Using Strand Displacement Amplification and a Colorimetric Probe Capture SystemBlassak, M. / Mueller, R. / Jolly, J. / Kosler, E. et al. | 1997
- 71
-
Detection of Cryptosporidium parvum Oocysts in Municipal Water Samples Using the Polymerase Chain Reaction and the Digene SHARP Signal SystemChung, E. / Yee, A. / DeGrandis, S. / Aldom, J. et al. | 1997
- 79
-
Improved Sampling Methods for the Receiving of Giardia and Cryptosporidium From Source and Treated WaterClancy, J. L. / Hargy, T. M. / Schaub, S. et al. | 1997
- 87
-
Membrane Filter Dissolution: A Novel Method for the Recovery of Cryptosporidium Oocysts From WaterAldom, J. E. / Chagla, A. H. et al. | 1997
- 91
-
Immunomagnetic Separation of Cryptosporidium Oocysts From High Turbidity Water Sample ConcentratesCampbell, A. T. / Gron, B. / Johnsen, S. E. et al. | 1997
- 97
-
Viability of Cryptosporidium Oocysts: Assessment Following Disinfection With OzoneCampbell, A. T. / Anderson, R. / Robertson, L. J. / Parker, J. F. W. et al. | 1997
- 103
-
Improved Techniques for the Recovery of Cryptosporidium parvum From WaterWhitmore, T. N. / Nazir, M. et al. | 1997
- 109
-
A Simple Procedure for an Exact Evaluation of the Sensitivity of the Selective Detection of Viable Cryptosporidium Oocysts by In vitro Excystation and PCRWiedenmann, A. / Steuer, S. / Krueger, P. / Botzenhart, K. et al. | 1997
- 115
-
Spores of Sulphite-Reducing Clostridia: A Surrogate Parameter for Assessing the Effects of Water Treatment Processes on Protozoan (Oo)cysts?Hijnen, W. A. M. / Houtepen, F. A. P. / Van der Speld, W. M. H. / Van der Kooij, D. et al. | 1997
- 127
-
Enhanced Production of Cryptosporidium parvum Oocysts in Immuno-suppressed MiceCicmanec, J. L. / Reasoner, D. J. et al. | 1997
- 133
-
Infection of Immune Suppressed Adult C57BL/6 Mice as a Biologic Model to Study the Infectivity and Viability of Cryptosporidium parvum OocystsSwabby-Cahill, K. D. / Cahill, A. R. et al. | 1997
- 137
-
Modeling the Impact of Body-Contact Recreation on Cryptosporidium Levels in a Drinking Water ReservoirStewart, M. / Yates, M. / Anderson, M. / Gerba, C. et al. | 1997
- 147
-
The Prevalence of Cryptosporidium and Giardia in U.S. GroundwatersHancock, C. M. / Rose, J. B. / Callahan, M. et al. | 1997
- 153
-
The Potential Role of Oysters and Waterfowl in the Complex Epidemiology of Cryptosporidium parvumFayer, R. / Trout, J. M. / Graczyk, T. K. / Farley, C. A. et al. | 1997
- 159
-
Detection, Occurrence and Epidemiology of Cryptosporidium in Kwazulu-Natal, South AfricaJarmey-Swan, C. / Bailey, I. W. / Howgrave-Graham, A. R. et al. | 1997
- 171
-
In vitro Survival of Cryptosporidium Oocysts in Natural WatersHeisz, M. / Chauret, C. / Chen, P. / Springthorpe, S. et al. | 1997
- 177
-
Modelling the Discharge of Cryptosporidium and Giardia by Domestic Sewage and Their Dispersion in Surface WaterMedema, G. J. / Schijven, J. F. / De Nijs, A. C. M. / Elzenga, J. G. et al. | 1997
- 183
-
A Field Survey on Occurrence of Giardia Cysts and Cryptosporidium Oocysts in Sewage Treatment PlantsHirata, T. / Hashimoto, A. et al. | 1997
- 195
-
The Cincinnati Water Works' Development of a Ground-Water Parasite Monitoring Program and Analytical ResultsCossins, F. A. / Gollnitz, W. D. / DeMarco, J. / Hartman, D. J. et al. | 1997
- 201
-
Cincinnati: Six Years of Parasite Monitoring at a Surface Water Treatment PlantSwertfeger, J. / Cossins, F. / DeMarco, J. / Metz, D. H. et al. | 1997
- 207
-
A Study of Cryptosporidiosis in Relation to Water SupplyO'Neill, J. G. / Fewtrell, L. / Kav, D. / McNamara, M. et al. | 1997
- 213
-
Oh-Oh CystsSakaji, R. H. / Chun, D. G. et al. | 1997
- 219
-
Inactivation of Cryptosporidium parvum Oocysts in Water Using Advanced Ultraviolet IrradiationClancy, J. L. / Marshall, M. M. / Dyksen, J. E. et al. | 1997
- 229
-
Comparative Ozone Inactivation of Cryptosporidium and Other MicroorganismsMiltner, R. J. / Shukairy, H. M. / Rice, E. W. / Owens, J. H. et al. | 1997
- 243
-
From Target Pathogens to Surrogate IndicatorsNieminski, E. C. et al. | 1997
- 253
-
Cryptosporidium Disinfection Goals for Lake MichiganCrozes, G. / Hagstrom, J. / Finch, G. / Haas, C. et al. | 1997
- 275
-
Disinfection of Cryptosporidium: Design Criteria for North American Water AgenciesOppenheimer, J. / Aieta, E. M. / Jacangelo, J. / Najm, I. et al. | 1997
- 281
-
Optimizing Coagulation/Filtration Processes for Cryptosporidium RemovalYates, R. S. / Green, J. F. / Liang, S. / Merlo, R. P. et al. | 1997
- 291
-
Evaluation of the Removal of Pathogenic Parasites by a Point-of-Use Water Treatment SystemJohnson, D. C. / Roessler, P. F. / Hasan, M. N. / Gerba, C. P. et al. | 1997
- 297
-
Microbial Degradation of Cryptosporidium parvum by Serratia marcescens With High Chitinolytic ActivityZuckerman, U. / Gold, D. / Shelef, G. / Yuditsky, A. et al. | 1997
- 305
-
A Framework for Assessing the Risks of Waterborne CryptosporidiumPerz, J. F. / Ennever, F. K. / Le Blancq, S. M. et al. | 1997
- 317
-
Descriptive Epidemiology of Cryptosporidiosis in New York City, 1995Miller, J. R. / Ashendorff, A. / Seeley, A. / Mikol, Y. B. et al. | 1997
- 329
-
The Meaningfulness of Analytical Results in the Detection of Cryptosporidium and Giardia in WaterNahrstedt, A. / Gimbel, R. et al. | 1997
- 335
-
Critical Path for Cryptosporidium Research: Results of AWWARF ProcessBrink, D. R. / Hund, R. / Martin, K. et al. | 1997
- 345
-
Water Works and the Health Department: Working Together in MilwaukeeLewis, C. M. et al. | 1997
- 355
-
An Outbreak of Cryptosporidiosis in Southeastern British Columbia, CanadaOng, C. S. L. / Pearce, M. / Eisler, D. / Swee Han Goh et al. | 1997
- 367
-
Waterborne Cryptosporidiosis - A Single Outbreak in SwedenDe Jong, B. / Andersson, Y. et al. | 1997
- 369
-
Cryptosporidium - A Regulator's ViewpointDrury, D. F. / Lloyd, A. et al. | 1997
- 377
-
How Philadelphia Water Department Has Used the Partnership for Safe Water to Build Consumer Confidence in Their Drinking WaterDahme, J. et al. | 1997
- 381
-
How Dallas Water Utilities Has Communicated With Customers About CryptosporidiumMirochna, J. et al. | 1997
- 385
-
Panel Discussion: Why Can't We Detect Crypto?Fricker, C. R. et al. | 1997
- 403
-
Panel Discussion: Is Cryptosporidium in Water a Risk?Stewart, M. et al. | 1997
- 417
-
Closing Session: Question and Answer PeriodSmith, H. V. et al. | 1997