INTEGRATED SYSTEM FOR RELIABILITY-MODELING OF COLD PLASTIC DEFORMATION TOOLS USED IN THE CAR INDUSTRY (Englisch)
- Neue Suche nach: Baban, C. F.
- Neue Suche nach: Pele, A. V.
- Neue Suche nach: Baban, M.
- Neue Suche nach: Baban, C. F.
- Neue Suche nach: Pele, A. V.
- Neue Suche nach: Baban, M.
In:
Annual reliability and maintainability symposium
;
212-216
;
2002
-
ISBN:
-
ISSN:
- Aufsatz (Konferenz) / Print
-
Titel:INTEGRATED SYSTEM FOR RELIABILITY-MODELING OF COLD PLASTIC DEFORMATION TOOLS USED IN THE CAR INDUSTRY
-
Beteiligte:
-
Kongress:Annual reliability and maintainability symposium ; 2002 ; Seattle, WA
-
Erschienen in:
-
Verlag:
- Neue Suche nach: IEEE
-
Erscheinungsdatum:01.01.2002
-
Format / Umfang:5 pages
-
Anmerkungen:Theme title: Beyond 2001: the reliability and maintainability odyssey. Also known as the 48th annual international symposium on product quality and integrity. IEEE cat no 02CH37318
-
ISBN:
-
ISSN:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Inhaltsverzeichnis Konferenzband
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
A study of online maintenance practices at US nuclear plantsLin, J.C. et al. | 2002
- 6
-
Risk-informed reliability-focused decision analysis support for effective facility change managementLiming, J.K. / Olson, B.K. et al. | 2002
- 14
-
Optimizing intervals for inspection and failure-finding tasksHauge, B.S. et al. | 2002
- 14
-
OPTIMIZING INTERVALS FOR INSPECTION & FAILURE-FINDING TASKSHauge, B. S. et al. | 2002
- 20
-
Prioritizing the purchase of spare parts using an approximate reasoning modelEisenhawer, S.W. / Bott, T.F. / Jackson, J.W. et al. | 2002
- 26
-
Availability centered maintenance (ACM), an integrated approachCeschini, G.F. / Saccardi, D. et al. | 2002
- 32
-
A path-based algorithm to evaluate asymptotic unavailability for large Markov modelsBouissou, M. / Lefebvre, Y. et al. | 2002
- 32
-
A PATH-BASED ALGORITHM TO EVALUATE ASYMPOTIC UNAVAILABILITY FOR LARGE MARKOV MODELSLefebvre, Y. / Bouissou, M. et al. | 2002
- 40
-
A simple graphical approach for comparing reliability trends of different units in a fleetTang, L.C. / Xie, M. et al. | 2002
- 44
-
FAILURE-DATA ANALYSIS BY MIXTURE OF 3 WEIBULL DISTRIBUTIONSZhang, T. / Ren, Y. et al. | 2002
- 44
-
Failure data analysis by models involving 3 Weibull distributionsTieling Zhang, / Ren, Y. et al. | 2002
- 51
-
Sample sizes for system availabilitySingh, V.P. / Swaminathan, S. et al. | 2002
- 56
-
Comprehensive review of estimating system-reliability confidence-limits from component-test dataXijin Tian, et al. | 2002
- 61
-
Supply chain reliability for contingency operationsThomas, M.U. et al. | 2002
- 68
-
Maintenance-cost modeling for a refrigerated-trailer fleetNutter, D.W. / Cassady, C.R. / Taylor, G.D. / Chet Tuck Wong, et al. | 2002
- 74
-
Reliability improvement of airport ground transportation vehicles using neural networks to anticipate system failureSmith, A.E. / Coit, D.W. / McCullers, C.W. et al. | 2002
- 80
-
Input data characterization factors for complex systems affecting availability estimation accuracyDurkee, D.P. / Pohl, E.A. / Mykytka, E.F. et al. | 2002
- 90
-
Optimizing condition based maintenance decisionsJardine, A.K.S. et al. | 2002
- 98
-
Normal accident theory validated: interactive complexity and resource availability as predictors of reliabilityWolf, F.G. et al. | 2002
- 104
-
RELIABILITY & AVAILABILITY EVALUATION FOR HIGHLY-MESHED NETWORK-SYSTEMSCarpignano, A. / Piccini, M. / Gargiulo, M. et al. | 2002
- 104
-
Reliability and availability evaluation for highly meshed network systems: status of the art and new perspectivesCarpignano, A. / Piccini, M. / Gargiulo, M. / Ponta, A. et al. | 2002
- 112
-
Generalized imperfect coverage phased-mission analysisLiudong Xing, / Dugan, J.B. et al. | 2002
- 120
-
How safety-investments increase performance: a practical caseSonnemans, P.J.M. / Korvers, P.M.W. / Brombacher, A.C. et al. | 2002
- 127
-
RISK ANALYSIS USING A HYBRID BAYES-APPROXIMATE REASONING METHODOLOGYBott, T. F. / Eisenhawer, S. W. et al. | 2002
- 127
-
Risk analysis using a hybrid Bayesian-approximate reasoning methodologyBott, T.F. / Eisenhawer, S.W. et al. | 2002
- 134
-
Ulysses, Scylla and Charybdis - and the story of reliabilityTurconi, G. et al. | 2002
- 140
-
Beyond root-cause analysis [product development process improvement]Bergman, B.L.S. / Fundin, A.P. / Gremyr, I.C. / Johansson, P.M. et al. | 2002
- 140
-
BEYOND ROOT-CAUSE ANALYSISJohansson, P. M. / Gremyr, I. C. / Fundin, A. P. / Bergman, B. L. S. et al. | 2002
- 147
-
Risk assessment in railroad signaling: experience gained and lessons learnedBraband, J. et al. | 2002
- 147
-
RISK ASSESSMENT IN RAILROAD SIGNALLING: EXPERIENCE GAINED AND LESSONS-LEARNEDBraband, J. et al. | 2002
- 153
-
A method for achieving an enhanced mission capabilityCrow, L.H. et al. | 2002
- 158
-
Integrating reliability improvement modeling into practice-challenges and pitfallsHodge, R. / Quigley, J. / James, I. / Marshall, J. et al. | 2002
- 165
-
FMEA OF MARINE SYSTEMS: MOVING FROM PRESCRIPTIVE TO RISK-BASED DESIGN & CLASSIFICATIONFarquharson, J. A. / McDuffee, J. L. / Seah, A. K. et al. | 2002
- 165
-
FMEA of marine systems: moving from prescriptive to risk-based design and classificationFarquharson, J. / McDuffee, J. / Seah, A.K. / Matsumoto, T. et al. | 2002
- 173
-
THE FAILURE-ANALYSIS MATRIX: A KINDER, GENTLER ALTERNATIVE FOR FMEA FOR INFORMATION SYSTEMSSignor, M. C. et al. | 2002
- 173
-
The failure-analysis matrix: a kinder, gentler alternative to FMEA for information systemsSignor, M.C. et al. | 2002
- 178
-
How to avoid the generation of loops in the construction of fault treesCiarambino, I. / Contini, S. / Demichela, M. / Piccinini, N. et al. | 2002
- 186
-
Service fault-tree-analysis: its use for improving the efficiency of service processesde Carvalho, A.A.P. / Scapin, C.A. et al. | 2002
- 190
-
PROBABILITY EVALUATION OF SYSTEM-FAILURE OCCURENCE BASED ON MINIMAL CUT-SETSKohda, T. / Inoue, K. et al. | 2002
- 190
-
Probability evaluation of system-failure occurrence based on minimal cut-setsKohda, T. / Inoue, K. et al. | 2002
- 195
-
Refrigerator failure early prediction based on warranty dataKe Liu, et al. | 2002
- 200
-
Can CATV availability reach that of the TELCOs? The road to 5NINES!Gonzales, M.G. et al. | 2002
- 200
-
CAN CABLE-TELEVISION AVAILABILITY REACH THAT OF THE TELCOS? THE ROAD TO 5 NINESGonzales, M. G. et al. | 2002
- 205
-
Reliability analysis system for risk management of LNG receiving terminals and piping networkTakagi, D. / Koyama, K. / Ishizuka, A. / Kawai, K. et al. | 2002
- 205
-
RELIABILITY-ANALYSIS SYSTEM FOR RISK MANAGEMENT OF LNG RECEIVING TERMINALS AND PIPING NETWORKSTakagi, D. / Koyama, K. / Miura, K. / Kawai, K. et al. | 2002
- 212
-
Integrated system for reliability-modeling of cold plastic deformation tools used in car industryBaban, C.F. / Radu, I.E. / Baban, M. et al. | 2002
- 212
-
INTEGRATED SYSTEM FOR RELIABILITY-MODELING OF COLD PLASTIC DEFORMATION TOOLS USED IN THE CAR INDUSTRYBaban, C. F. / Pele, A. V. / Baban, M. et al. | 2002
- 217
-
Random vibration analysis and parameter optimizationYongcang Zhang, / Mingxiao Jiang, et al. | 2002
- 222
-
Scenario-based unit testing for reliabilityKuball, S. / Hughes, G. / Gilchrist, I. et al. | 2002
- 228
-
Three modified dependency-tests for software failuresWang, C.-C. / Chen, R.J.-W. et al. | 2002
- 235
-
An integrated measure of software maintainabilityAggarwal, K.K. / Singh, Y. / Chhabra, J.K. et al. | 2002
- 242
-
Investigating a specific class of software reliability growth modelsKeiller, P.A. / Mazzuchi, T.A. et al. | 2002
- 249
-
Reliability estimation of hierarchical software systemsLeblanc, S.P. / Roman, P.A. et al. | 2002
- 254
-
MAINTANANCE OPTIMIZATION UNDER UNCERTAINITIES, USING INTERVAL-METHODS & EVOLUTIONARY STRATEGIESRocco, C. M. et al. | 2002
- 254
-
Maintenance optimization under uncertainties using interval methods & evolutionary strategiesRocco, C.M. et al. | 2002
- 260
-
Modelling of maintenance, within discrete event simulationWarrington, L. / Jones, J.A. / Davis, N. et al. | 2002
- 266
-
Use of functional representation diagram for reliability improvementLin, J.C. et al. | 2002
- 272
-
Two-dimensional reliability modeling from warranty dataGuangbin Yang, / Zaghati, Z. et al. | 2002
- 279
-
The failure of MTTF in availability evaluationHairong Sun, / Han, J.J. et al. | 2002
- 285
-
Making the (business) case for software reliabilityMcGibbon, T. / Nicholls, D. et al. | 2002
- 293
-
An approach for understanding and testing third party software componentsHaddox, J.M. / Kapfhammer, G.M. et al. | 2002
- 300
-
Reliability centered software testingBluvband, Z. et al. | 2002
- 306
-
Utility of popular software defect modelsHartman, P. et al. | 2002
- 312
-
Validation of guidance control software requirements specification for reliability and fault-toleranceSheldon, F.T. / Hye Yeon Kim, et al. | 2002
- 319
-
Accelerated tests to simulate metal migration in hybrid circuitsBhakta, S.D. / Lundberg, S. / Mortensen, G. et al. | 2002
- 325
-
Reliability quantification of induction motors-accelerated degradation testing approachWendai Wang, / Dragomir-Daescu, D. et al. | 2002
- 332
-
Reliability stress test method: impact on the new product introduction process, time to market, field reliability impact and reliability assessmentJawaid, S. / Ferguson, J. / Zaki, S. et al. | 2002
- 338
-
Planning multiple levels constant stress accelerated life testsLoon-Ching Tang, / Guiyu Yang, et al. | 2002
- 343
-
Modeling and analysis of time-dependent stress accelerated life dataMettas, A. / Vassiliou, P. et al. | 2002
- 349
-
QRAS - the Quantitative Risk Assessment SystemGroen, F.J. / Smidts, C.S. / Mosleh, A. / Swaminathan, S. et al. | 2002
- 356
-
Effective automated sneak circuit analysisPrice, C.J. / Hughes, N. et al. | 2002
- 361
-
The application of RODON to the FMEA of a microgravity facility subsystemZampino, E.J. / Burow, D. et al. | 2002
- 367
-
Plausible reasoning theory in reliability-centered maintenance analysisJohnston, D.C. et al. | 2002
- 367
-
PLAUSIBLE REASONING THEORY IN RCM ANALYSISJohnston, D. C. et al. | 2002
- 372
-
Enhancing product reliability using REMMMarshall, J. / Walls, L. / Jones, J. et al. | 2002
- 379
-
Intellectual capital: utilizing the Web for knowledge management and data utilization in reliability engineeringMettas, A. / Rock, D. et al. | 2002
- 379
-
INTELLECTUAL CAPITAL: USING THE WEB FOR KNOWLEDGE MANAGEMENT AND DATA UTILIZATION IN RELIABILITY ENGINEERINGMettas, A. / Rock, D. et al. | 2002
- 386
-
Research on the model and software package for ship reliability analysisYi Hong, / Zhang Yufang, / Li Changchun, / Chen Mingjun, et al. | 2002
- 392
-
RELIABILITY THERMAL ANALYSIS AND OPTIMIZATION WIRABILITY DESIGN OF MULTI-LAYER PRINTED WIRE BOARDSTian, X. / Palusinski, O. A. et al. | 2002
- 392
-
Reliability, thermal analysis and optimization wirability design of multi-layer PCB boardsTian, X. / Palusinski, O.A. et al. | 2002
- 399
-
INTEGRATED MODELING OF SYSTEM FUNCTIONAL, MAINTENANCE & ENVIRONMENTAL FACTORSJones, J. A. / Warrington, L. / Davis, N. et al. | 2002
- 399
-
Integrated modelling of system functional, maintenance & environmental factorsJones, J.A. / Warrington, L. / Davis, N. et al. | 2002
- 404
-
MULTI-PHASE RELIABILITY ANALYSIS FOR DYNAMIC & STATIC PHASESMeshkat, L. / Ou, Y. / Dugan, J. B. et al. | 2002
- 404
-
Multi-phase reliability analysis for dynamic and static phasesOu, Y. / Meshkat, L. / Dugan, J.B. et al. | 2002
- 411
-
Availability modeling for the application of manufacturing equipmentBrall, A. et al. | 2002
- 417
-
Improving design for reliability with in-service data analysisJames, I.J. / Marshall, J. / Walls, L. et al. | 2002
- 423
-
Reliability of lead-free solder interconnects-a reviewTonapi, S. / Gopakumar, S. / Borgesen, P. / Srihari, K. et al. | 2002
- 429
-
The use of indirect evidence for Bayesian reliability analysisLin, J.C. et al. | 2002
- 434
-
The future of reliability engineering as a professionKapur, K.C. et al. | 2002
- 436
-
RELIABILITY - LOOKING AHEADMitrou, T. et al. | 2002
- 438
-
Reliability specialists-a critical needVassiliades, G.A. et al. | 2002
- 439
-
The design and evaluation of all voting triple modular redundancy systemHyunki Kim, / Hyung-Joon Jeon, / Keyseo Lee, / Hyuntae Lee, et al. | 2002
- 439
-
THE DESIGN & EVALUATION OF ALL VOTING TRIPLE MODULAR REDUNDANCY SYSTEMJean, H. J. / Lee, H. K. / Lee, H. et al. | 2002
- 445
-
Fault information model and maintenance cycle forecasting for ship's power systemGu Wei, / Chu Jianxin, et al. | 2002
- 450
-
Reliability/availability of K-out-of-N system with M cold standby unitsWendai Wang, / Loman, J. et al. | 2002
- 450
-
RELIABILITY/AVAILABILITY OF K-OUT-OF-N:G SYSTEM WITH M COLD-STANDBY UNITSWang, W. / Loman, J. et al. | 2002
- 456
-
On reliability modeling and analysis of highly-reliable large systemsLoman, J. / Wendai Wang, et al. | 2002
- 460
-
Approximation method and formulas for average unavailability of systems with latent faultsRamesh, A.V. / Twigg, D.W. / Sharma, T.C. et al. | 2002
- 467
-
Using TL 9000 requirements to improve telecommunications product quality and reliabilityYohe, T.F. / Liebesman, S. et al. | 2002
- 471
-
Development of quality index for TL 9000 measurementsJain, A.K. et al. | 2002
- 476
-
Using TL 9000 measurements [telecommunication industry quality standards]Morrow, R. / Dandekar, A. et al. | 2002
- 476
-
USING TL 9000 MEASUREMENTSMorrow, R. F. / Dandekar, A. V. et al. | 2002
- 480
-
ISO 9000:2000-the challenges and opportunities for internal auditorsLiebesman, S. et al. | 2002
- 484
-
QFD implementation in a discrete semiconductor industryCher Ming Tan, / Teck-Khim Neo, et al. | 2002
- 490
-
Warranty, product spectrum and customer roleRamaswamy, M.K. et al. | 2002
- 496
-
Analyzing fuzziness in product quality and reliability information-flow during time-driven product-development-processYuan Lu, / Brombacher, A.C. / Den Ouden, E. / Korvers, P.M.W. et al. | 2002
- 496
-
ANALYZING FUZZINESS IN PRODUCT QUALITY & RELIABILITY INFORMATION-FLOW DURING TIME-DRIVEN PRODUCT-DEVELOPMENT PROCESSLu, Y. / Brombacher, A. C. / Ouden, E. D. / Korvers, P. K. M. W. et al. | 2002
- 503
-
Reliability models of repairable systems considering the effect of operating conditionsPrasad, P.V.N. / Rao, K.R.M. et al. | 2002
- 503
-
RELIABILITY MODELS OF REPAIRABLE SYSTEMS CONSIDERING THE EFFECT OF OPERATION CONDITIONSPrasad, P. V. N. / Rao, K. R. M. et al. | 2002
- 511
-
Measuring RCM implementationJohnston, D.C. et al. | 2002
- 511
-
MEASURING RELIABILITY-CENTERED-MAINTENANCE IMPLEMENTATIONJohnston, D. C. et al. | 2002
- 516
-
A failure-forecast method based on Weibull and statistical-pattern analysisFitzgibbon, K. / Barker, R. / Clayton, T. / Wilson, N. et al. | 2002
- 522
-
Fault-frequency prediction of chassis components for heavy-duty trucksWickstrom, G.L.J. et al. | 2002
- 528
-
RELIABILITY PREDICTION BASED ON CRITICALITY-ASSOCIATED SIMILARITY ANALYSISJackson, A. / Jackson, T. / Jain, A. K. et al. | 2002
- 528
-
Reliability predictions based on criticality-associated similarity analysisJackson, A. / Jain, A.K. / Jackson, T. et al. | 2002
- 536
-
Reliability assessment methodology for 1-shot systemsBierbaum, R.L. / Wright, D.L. et al. | 2002
- 542
-
SYSLEB-a tool for the calculation of the system reliability from raw failure dataPozsgai, P. / Krolo, A. / Bertsche, B. / Fritz, A. et al. | 2002
- 550
-
The exponential distribution: the good, the bad and the ugly. A practical guide to its implementationMurphy, K.E. / Carter, C.M. / Brown, S.O. et al. | 2002
- 556
-
A simplified availability modeling tool for networks with 1:1 redundant software-hardware systemsWei Hou, / Okogbaa, O.G. et al. | 2002
- 563
-
COMPARISON OF RELIABILITY & AVAILABILITY EVALUATION TECHNIQUES FOR DISTRIBUTION NETWORK SYSTEMSRoggero, E. / Mosso, A. / Ponta, A. / Carpaneto, E. et al. | 2002
- 563
-
Comparison of reliability and availability evaluation techniques for distribution network systemsCarpaneto, E. / Mosso, A. / Ponta, A. / Roggero, E. et al. | 2002
- 569
-
Probabilistic assessment of availability from system performance dataSmith, J.B. / Smith, W.B. et al. | 2002
- 577
-
Application of Bayes statistics to reduce sample-size, considering a lifetime-ratioKrolo, A. / Rzepka, B. / Bertsche, B. et al. | 2002
- 584
-
Application of semi-Markov process and CTMC to evaluation of UPS system availabilityLiang Yin, / Fricks, R.M. / Trivedi, K.S. et al. | 2002
- 592
-
A reliability driven mission for Space StationShooman, M.L. / Sforza, P.M. et al. | 2002
- 601
-
The knowledge path to mission success: overview of the NASA PBMA-KMSNewman, J.S. / Wander, S.M. et al. | 2002
- 607
-
Dynamic modeling of degradation dataMingxiao Jiang, / Yongcang Zhang, et al. | 2002
- 612
-
A discrete-event simulator for predicting outage time and costs as a function of maintenance resourcesHecht, M. / Handal, J. et al. | 2002
- 612
-
A DISCRETE-EVENT SIMULATOR FOR PREDICTING OUTAGE TIME & COSTS AS A FUNCTION OF MAINTENANCE RESOURCESHecht, M. / Handal, J. et al. | 2002
- 618
-
Reliability tests on power devicesMarcos, J. / Pallas, J.M.L. / Fernandez-Gomez, S. et al. | 2002
- 622
-
Increase reliability for screening by coating plastic partsMorrison, A.J. et al. | 2002
- 628
-
Electronic packaging adhesive fatigue life prediction using thermal cycling step-stress testingXijin Tian, / Prince, J.L. et al. | 2002
- 636
-
Establishment of accelerated corrosion testing conditionsKlyatis, L.M. et al. | 2002
- 642
-
Improving the reliability of a newly-designed mobile phone by environmental tests and accelerated life testsSang-Jun Park, / Jong-Shin Ha, / Wan-Soo Choi, / Sang-Deuk Park, et al. | 2002
- 647
-
AUTOMATED REAL-TIME TESTING (ARTT) FOR EMBEDDED CONTROL SYSTEMSHawkins, J. / Howard, R. B. / Nguyen, H. V. et al. | 2002
- 647
-
Automated real-time testing (ARTT) for embedded control systems (ECS)Hawkins, J. / Howard, R.B. / Nguyen, H.V. et al. | 2002
- 653
-
Author index| 2002
- 655
-
Key Word Index| 2002
-
Annual Reliability and Maintainability Symposium. 2002 Proceedings (Cat. No.02CH37318)| 2002