Assessing quality performance outcomes and the relationship with staffing: a General Contractor case study (Englisch)
- Neue Suche nach: Gordon, Elizabeth Ann
- Neue Suche nach: Rawlinson, Keila
- Neue Suche nach: Dabhade, Neha
- Neue Suche nach: Reed, Dean
- Neue Suche nach: Gordon, Elizabeth Ann
- Neue Suche nach: Rawlinson, Keila
- Neue Suche nach: Dabhade, Neha
- Neue Suche nach: Reed, Dean
In:
Proceedings of the 30th Annual Conference of the International Group for Lean Construction
; 973-983
;
2022
-
ISBN:
- Aufsatz (Konferenz) / Elektronische Ressource
-
Titel:Assessing quality performance outcomes and the relationship with staffing: a General Contractor case study
-
Beteiligte:Gordon, Elizabeth Ann ( Autor:in ) / Rawlinson, Keila ( Autor:in ) / Dabhade, Neha ( Autor:in ) / Reed, Dean ( Autor:in )
-
Kongress:International Group for Lean Construction ; 30. ; 2022 ; Edmonton, Alberta; Online
-
Erschienen in:
-
Verlag:
- Neue Suche nach: International Group for Lean Construction
-
Erscheinungsort:[Erscheinungsort nicht ermittelbar]
-
Erscheinungsdatum:2022
-
ISBN:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Elektronische Ressource
-
Sprache:Englisch
- Neue Suche nach: 56.40
- Weitere Informationen zu Basisklassifikation
-
Schlagwörter:
-
Klassifikation:
BKL: 56.40 Baubetrieb -
Lizenzbestimmungen:
-
Datenquelle:
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
Lean thinking to improve curriculum delivery in civil engineering using Monte Carlo simulationMohsen, Osama / Naumets, Serhii / Hamzeh, Farook et al. | 2022
- 2
-
Takt planning effectiveness into one Billion Dollars ProjectsFish, Mohamed Abou El / Shoeb, Mohamed / Neeraganti, Thirupal / Majed, Ali / Salhab, Diana / Urizar, Mark et al. | 2022
- 3
-
Nine innovation barriers in Australian construction contractingStevens, Matt et al. | 2022
- 4
-
Role of lean in reducing physical and operational waste and environmental impactMaraqa, Musab Jamal / Spatari, Sabrina / Sacks, Rafael et al. | 2022
- 5
-
Effects of daily management on design reliabilityLappalainen, Eelon Mikael / Uusitalo, Petri / Ibrahim, Hisham Abou / Seppänen, Olli / Hänninen, Aku / Söderström, Kristian et al. | 2022
- 6
-
Findings on the use of Last Planner - a case studyLappalainen, Eelon Mikael / Ibrahim, Hisham Abou / Seppänen, Olli / Palsola, Ilari et al. | 2022
- 7
-
Development of an Educational Game to teach Integrated Project Delivery PrinciplesRussmann, Eduard / Budau, Maximilian Rolf-Dieter / Hickethier, Gernot / Shervin, Haghsheno et al. | 2022
- 8
-
Decreasing waste in mechanical, electrical and plumbing workSeppänen, Olli / Görsch, Christopher et al. | 2022
- 9
-
Assembly process in off-site construction: Self-lock device as a key to a lean aproachPicard, Laurence / Blanchet, Pierre / Bégin-Drolet, André et al. | 2022
- 10
-
Rethinking Project Delivery to Focus on Value and Innovation in the Public SectorTillmann, Patricia / Eckblad, Stuart / Whitney, Fred / Koefoed, Niall et al. | 2022
- 11
-
Towards integrated implementation of IPD and DfMA for construction projects: a reviewRankohi, Sara / Bourgault, Mario / Iordanova, Ivanka / Carbone, Carlo et al. | 2022
- 12
-
Value-adding Index - Share of direct Work incorporated in Location Tracking DataGörsch, Christopher / Jianyu, Zhao / Seppänen, Olli et al. | 2022
- 13
-
Uncovering and visualizing Work Process Interruptions through quantitative Workflow AnalysisGörsch, Christopher / Barazi, Alaa Al / Ibrahim, Hisham Abou / Seppänen, Olli et al. | 2022
- 14
-
Hybrid lean decision making framework integrating value stream mapping and simulation: a manufacturing case studyAbdel-Jaber, Omar / Itani, Anas / Al-Hussein, Mohamed et al. | 2022
- 15
-
Situational awareness in construction projects using takt productionHalttula, Heikki Pentti / Seppänen, Olli et al. | 2022
- 16
-
Scrum complementing Last Planner System - a case studyPower, William / Sinnott, Derek / Lynch, Patrick et al. | 2022
- 17
-
Location-Based Work SamplingPérez, Cristina Toca / Salling, Stephanie / Wandahl, Søren et al. | 2022
- 18
-
Synergies between Lean Construction and Artificial Intelligence : ai driven Continuous Improvement ProcessCisterna, Diego / Lauble, Svenja / Haghsheno, Shervin / Wolber, Jan et al. | 2022
- 19
-
Influence of Last Planner® Sys tem adoption level on project management and communicationLagos, Camilo Ignacio / Herrera, Rodrigo Fernando / Alarcón, Luis Fernando / Muñoz, Javiera et al. | 2022
- 20
-
Breakdown work samplingSalling, Stephanie / Pérez, Cristina Toca / Wandahl, Søren et al. | 2022
- 21
-
Digital Twins and Lean Construction: challenges for future practical applicationsAraújo, Caroline Silva / Costa, Dayana Bastos / Corrêa, Fabiano Rogerio / Ferreira, Emerson de Andrade Marques et al. | 2022
- 22
-
Robustness of work sampling for measuring time wasteWandahl, Søren / Pérez, Cristina T. / Salling, Stephanie / Lerche, Jon et al. | 2022
- 23
-
Collaborative Method for Training and Implementing the Line of Balance in projects already in progressPereira, Fernando Gabriel Lopes / Farias, Thiago Alves / Fireman, Marcus Costa Tenório / Etges, Bernardo Martim Beck da Silva / Lopes, Leonardo Campos et al. | 2022
- 24
-
Challenges and importance of human beings within Last Planner® System in Colo mbia: A case studyAmado, Maria Alejandra Diaz et al. | 2022
- 25
-
Why is flow not flowing?Rocha, Cecilia Gravina da / Wijayaratna, Kasun / Koskela, Lauri et al. | 2022
- 26
-
Putting the Collaborative Style of a Successful Football Team in a Lean Construction ContextMalvik, Tobias Onshuus et al. | 2022
- 27
-
Lean simulation game with BIM-based progress monitoring for Takt ControlAlves, Sharina / Melzner, Jürgen / Hollermann, Sebastian et al. | 2022
- 28
-
A framework for enhancing the engineering review proces s in oil and gas EPC projectsMatta, Michel / Nakouzi, Reem / Kalach, Mayssa et al. | 2022
- 29
-
Improving strategic partnering between contractors and designersPaulsen, Sigurd Brunstad / Engebø, Atle / Lædre, Ola et al. | 2022
- 30
-
Developing & testing a value stream map simulation: helping the construction industry learn to seeArefazar, Yasaman / Rybkowski, Zofia K. et al. | 2022
- 31
-
kaizen as an improvement method for concrete walls construction in social housing projectVieira, João Paulo Pierre / Etges, Bernardo Martim Beck da Silva / Lins, Monyque / Pelegrino, Renato / Costa, Larissa et al. | 2022
- 32
-
Using pull planning as a method for the certificate of occupancy processSilva, Matheus Almeida Miran da / Pereira, Mariana Del Carlo / Etges, Bernardo Martim Beck da Silva et al. | 2022
- 33
-
Continuous improvement of takt production with data-driven knowledge management approachAhonen, Toni Henrik / Lehtovaara, Joonas / Peltokorpi, Antti / Uusitalo, Petri et al. | 2022
- 34
-
Managing product information for Lean construction: Use cases and a proposed processPeltokorpi, Antti / Seppänen, Olli et al. | 2022
- 35
-
Is construction industry still performing worse than other industries?Elfving, Jan Alarik / Seppänen, Olli et al. | 2022
- 36
-
Location-Based Planning to promote safe distancing during construction activitiesSantos, Mírian Farias / Silveira, Bruno Falcón / Costa, Dayana Bastos et al. | 2022
- 37
-
Hybrid Simulation for Value Stream Mapping to Improve the Environmental Performance of the Construction PhaseNguyen, Danh Toan / Sharmak, Walter et al. | 2022
- 38
-
Method of industrialization potential analysis of construction systemsz, Alejandro Vásquez -Hernánde / Ortega, Jesús / Giménez, Zulay / Alarcón, Luis Fernando et al. | 2022
- 39
-
Towards a citizen-centered smart city: integrating lean thinking and social wellbeingIsmail, Nada / Kalach, Mayssa / Kleib, Yorgo et al. | 2022
- 40
-
Ideation framework in industrialized constructionOrtega, Jesús / Vásquez-Hernández, Alejandro / Giménez, Zulay / Alarcón, Luis Fernando et al. | 2022
- 41
-
Eliciting Requirements in Social Housing retrofit projects: tools and processes within a Living LabsettingSoliman-Junior, Joao / Awwal, Samira / Tzortzopoulos, Patricia / Ayo-Adejuyigbe, Morolake / Kagioglou, Mike et al. | 2022
- 42
-
Social interactions and team dynamics in a Last Planner meeting: an observational methodAsadian, Elnaz / Leicht, Robert et al. | 2022
- 43
-
Impact of lean practices in the planning of design tasks: evidence from two projects in FranceChaize, Eva / Balkhy, Wassim Al / Morael, Vincent / Lafhaj, Zoubeir et al. | 2022
- 44
-
Devising and implementing process models within infrastructure engineering designPedo, Barbara / Nguyen, Quynh Anh / Koskela, Lauri / Tezel, Algan / Vrabie, Elena / Potter, Doug / Whitelock-Wainwright, Andrew / Robinson, Stuart / Tzortzopoulos, Patricia et al. | 2022
- 45
-
Visual management standard of the reinforcement steel process in MéxicoHernández, Fernando Daniel Lazcano / Armiña, Eugenio Pellicer / Rodríguez, Salvador García et al. | 2022
- 46
-
Superior contractor performance: A barrier to lean construction adoption in AustraliaStevens, Matt et al. | 2022
- 47
-
Identifying the impact on labor productivity from design choices through work samplingLerche, Jon / Wandahl, Søren / Neve, Hasse et al. | 2022
- 48
-
The dual nature of complexity in construction management - Call for a renewed debateKalsaas, Bo Terje / Bølviken, Trond / Skaar, John et al. | 2022
- 49
-
Applying a DFMA approach in the redesign of steel bracket- A case study in post and beam systemThajudeen, Shamnath / Elgh, Fredrik / Lennartsson, Martin et al. | 2022
- 50
-
Α conceptual frame work for lean construction and blockchain integrationTezel, Algan / Kifokeris, Dimosthenis / Formoso, Carlos Torres / Koskela, Lauri / Koch, Christian et al. | 2022
- 51
-
Defining more sustainable and innovative solutions through Choosing by AdvantagesChristensen, Randi Muff et al. | 2022
- 52
-
Project pull planning based on location: from construction to designBiotto, Clarissa / Kagioglou, Mike / Koskela, Lauri / Tzortzopoulos, Patricia / Serra, Sheyla et al. | 2022
- 53
-
The synergies between Lean and BIM: a practical and theoretical comparisonLandim, Gabriela Linhares / Rocha, Larissa de Moraes / Nogueira, Rebeca Nara / Neto, José de Paula Barros et al. | 2022
- 54
-
Employee’s Mental Wellbeing with reference to IEQ and Managerial Environment in office spacesPadia, Shubham Ashok / Divatia, Ami / Saripally, Durga et al. | 2022
- 55
-
Mechanical, electrical and plumbing coordination practices: case Finnish construction marketChauhan, Krishna / Peltokorpi, Antti / Ibrahim, Hisham Abou / Seppänen, Olli et al. | 2022
- 56
-
Exploring the use of digital visual management for Last Planner System implementationConte, Manoela / Trentin, Bianca / Pedó, Bárbara / Etges, Bernardo Martim Beck da Silva / Navarrete, Santiago et al. | 2022
- 57
-
Lean public construction in the project definition phase: the case of PeruLujan, Guillermo Prado / Murguia, Danny et al. | 2022
- 58
-
A cognitive review for improving the collaboration between BIM and lean expertsDavoudabadi, Soudabeh / Pedo, Barbara / Tezel, Algan / Koskela, Lauri et al. | 2022
- 59
-
How does flow impact data center roofing durations ? A case studyApgar, Becca / Smith, James / Copenhaver, Daryn et al. | 2022
- 60
-
Projects are becoming ‘lean’ , but not organisationsLota, Paramjit Singh / TM, Vijayashree / Dave, Bhargav et al. | 2022
- 61
-
Developing a Multi-Project collaboration based IPD framework for Small and Medium Enterprises in the Construction IndustryVaitla, Raviteja / Gaikwad, Vrinda Arjun / Singireddy, Abhinav Reddy / Yoon, Jong Han et al. | 2022
- 62
-
How a takt plan can fail: applying failure modes and effects analysis in takt controlLehtovaara, Joonas / Tommelein, Iris D. / Seppänen, Olli et al. | 2022
- 63
-
Lean solutions for program development for Construction Daily ReportGimenez, Victor / Diepenbruck, Thomas M. / Rodegheri, Priscila M. / Serra, Sheyla M. B. / Anumba, Chimay J. et al. | 2022
- 64
-
Method to allocate Covid 19 preventive means based on expert prioritizationHerrera, Rodrigo Fernando / Lagos, Camilo Ignacio / Luna, Roberto / Alarcón, Luis Fernando et al. | 2022
- 65
-
Implementing lookahead planning and digital tolls to enable scability and set of information in a multi-site lean implementation.Bellaver, Gustavo Bridi / Santos, Diego de Oliveira Rodrigues da Silva / Etges, Bernardo Martim Beck da Silva et al. | 2022
- 66
-
Framework for blockchain-enabled building Information modeling (BIM) data sharing in construction supply chainYoon, Jong Han / Pishdad-Bozorgi, Pardis / paricio, Monica Viviana Sierra-A / Quintana, Emilio J. et al. | 2022
- 67
-
Sensemaking of guiding principles in construction projectsSkaar, John et al. | 2022
- 68
-
Investigation of the construction supply chain vulnerabilities under an unfavorable macro-environmental contextSaeedi, Sarow / Koohestani, Kayvan / Poshdar, Mani / Talebi, Saeed et al. | 2022
- 69
-
Empirical validation of Lean implementation barriers in Engineer-to-Order companies: An exploratory studySchulze, Felix / Patrick, Dallasega et al. | 2022
- 70
-
Preparing construction employers for the Gen-Z workforce: A case studyHatoum, Makram Bou / Ammar, Ashtarout / Nassereddine, Hala / Dadi, Gabriel et al. | 2022
- 71
-
The need for a human-centric approach in C4.0 technologiesNoueihed, Karim / Hamzeh, Farook et al. | 2022
- 72
-
Categorization of construction tasks for robotics using lean vs value-added effectiveness frameworkKhan, Muhammad Amir Hamza / Leicht, Robert et al. | 2022
- 73
-
CBA as a Differentiator to Win Projects in Pursuit: A Case Study Including Design and Construction Team perspective and Owner’s MotivesArroyo, Paz / Schöttle, Annett / Christensen, Randi / Arthur, Chad et al. | 2022
- 74
-
Building Quality Builders: Lessons learned from scaling a companywide trainingArroyo, Paz / Hinsley, Emilee / Komuravelli, Raj / Nelson, JD / Romayor, Ralph / Holland, Ellie / Tolle, Robert et al. | 2022
- 75
-
Takt planning: an enabler for lean constructionTommelein, Iris D. / Emdanat, Samir et al. | 2022
- 76
-
So many flows!Tommelein, Iris D. / Singh, Vishesh V. / Coelho, Rafael V. / Lehtovaara, Joonas et al. | 2022
- 77
-
The Impacts of Lean Implementation Revealed in the Course of Building a Digital Twin of a Construction Manufacturing FacilityAlsakka, Fatima / Darwish, Mohammad / Yu, Haitao / Hamzeh, Farook / Al-Hussein, Mohamed et al. | 2022
- 78
-
Teaching university students Last Planner System through learning by doingDrevland, Frode et al. | 2022
- 79
-
Developing project value attributes: A proposed process for value delivery on construction projectsKhalife, Salam / Emadi, Seyyedbehrad / Wilner, Deon / Hamzeh, Farook et al. | 2022
- 80
-
Understanding the relations between BIM maturity models and Lean principlesPeralta, Cristian / Mourgues, Claudio et al. | 2022
- 81
-
Implementing VDCBreistein, Helene Trine West bye / Lædre, Ola et al. | 2022
- 82
-
Integrated scheduling platform based on BIM and Lean constructionValdivieso, Fernando / ilion, Carolyne F / Iordanova, Ivanka et al. | 2022
- 83
-
LPS performance diagnosis model using fuzzy inference systemShehab, Lynn / Pourrahimian, Elyar / Salhab, Diana / Hamzeh, Farook et al. | 2022
- 84
-
Assessing quality performance outcomes and the relationship with staffing: a General Contractor case studyGordon, Elizabeth Ann / Rawlinson, Keila / Dabhade, Neha / Reed, Dean et al. | 2022
- 85
-
Collaborative project delivery with early contractor involvement and target costNarum, Kristoffer Brattegard / Engebø, Atle / Lædre, Ola / Torp, Olav et al. | 2022
- 86
-
CAPACITY BUILDING: Learning from corporate successes outside construction.Mossman, Alan / Ramalingam, Shobha et al. | 2022
- 87
-
Prefabricated reinforcement in construction using VDC: Case study Ovalo Monitor BridgeSchuler, Rodrigo Tuesta / Jiménez, Mark Anthony Vicuña / Savio, Alexandre Almeida Del / Mori, Felipe Quiroz / Benites, Erika Valle / Flores, Alejandro Palpan et al. | 2022
- 88
-
Addressing waste during the design phase : A matrix model for the interactions between robotic systems and lean principlesCastaneda, Jennifer Alejandra Cardenas / Mudireddy, Vedasree / Martinez, Pablo / Ahmad, Rafiq et al. | 2022
- 89
-
How to choose the best media to implement the Choosing by Advantages (CBA) Tabular method?Schöttle, Annett / Arroyo, Paz / Christensen, Randi et al. | 2022
- 90
-
Framework for using LPS in design on IPD projectsAsl, Negar Mansouri / Najafizadeh, Nazan in / Fakhrzarei, Mahboobeh / Hammad, Ahmed / Hamzeh, Farook et al. | 2022
- 91
-
The silo game: a simulation on interdisciplinary collaborationAlves, Thais et al. | 2022
- 92
-
Evaluating blockchain in construction supply chain managementAliasgari, Ramin / Dazmiri, Danial Gholinezhad / Hamzeh, Farook et al. | 2022
- 93
-
The development of simulations and Pull Planning for lean construction learning and implementationTsao, Cynthia C. Y. / Howell, Gregory A. et al. | 2022
- 94
-
Reducing bias in the hiring process through Choosing By Advantages: A case studyPaucar-Espinoza, Anthony F. / Erazo-Rondinel, Andrews A. / Arroyo, Paz / Salazar, Luis A. et al. | 2022
- 95
-
Digitalizing Collaborative Planning in Design – A case studyNiranjan, Christopher / Knotten, Vegard / Lædre, Ola et al. | 2022
- 96
-
Relations between preconditions, categories and impacts of making-do wasteAmaral, Tatiana Gondimdo / Braga, Pedro Dantas Bezerra / Silva, Sara Vieira da / Neto, José de Paula Barros et al. | 2022
- 97
-
Building interdisciplinary teams through student design competitions : A case studyGolestanirad, Pooria / Rybkowski, Zofia K. / Dixit, Manish / Luhan, Gregory A. et al. | 2022
- 98
-
Establishing design metrics to inform design change, increase communication, and reduce waste : A healthcare case study Sean StatonMulholland, Sean M. / Banasiak, Meredith / Brown, Qadry / Clevenger, Caroline / Staton, Jamie et al. | 2022
- 99
-
Evaluation of construction performance with the use of LPS and precast slabs in residential buildingsVeranleigh, Daniel / Murguia, Danny / Brioso, Xavier / Cisneros, Matias Calmet Arana et al. | 2022
- 100
-
Quantifying participation: An IPD case studyMulholland, Sean M. / Clevenger, Caroline et al. | 2022
- 101
-
Impact of fragmentation on value generation-towards a BIM-enabled Lean frameworkMehran, Donya / Poirier, Erik / Forgues, Daniel et al. | 2022
- 102
-
VDC in practice: A preliminary study to categorize production metrics on design and construction projects in Scandinavia and Latin AmericaMajumdar, Tulika / Rasmussen, Steinar. G. / Savio, Alexandre Almeida Del / Johannesdottir, Katrin / Hjelseth, Eilif / Fischer, Martin Arthur et al. | 2022
- 103
-
Developing a flow-based planning and control approach for linear infrastructure projectsFormoso, Carlos T. / Flores, Patrícia / Barth, Karina B. et al. | 2022
- 104
-
Digital twin of design process: an exploratory studyAbou-Ibrahim, Hisham / Lappalainen, Eelon / Seppänen, Olli et al. | 2022