Comparison of Approaches to Automated Terminals: USA vs. Europe (Englisch)
- Neue Suche nach: Johnson, Daniel J.
- Neue Suche nach: Kats, Jeroen
- Neue Suche nach: Johnson, Daniel J.
- Neue Suche nach: Kats, Jeroen
In:
Ports 2013
: Success through Diversification
;
361-370
;
2013
-
ISBN:
- Aufsatz (Konferenz) / Elektronische Ressource
-
Titel:Comparison of Approaches to Automated Terminals: USA vs. Europe
-
Beteiligte:Johnson, Daniel J. ( Autor:in ) / Kats, Jeroen ( Autor:in )
-
Kongress:Proceedings of Ports '13: 13th Triennial International Conference ; 2013 ; Seattle, Washington
-
Erschienen in:Ports 2013 : Success through Diversification ; 361-370
-
Verlag:
- Neue Suche nach: American Society of Civil Engineers
-
Erscheinungsort:Reston, VA
-
Erscheinungsdatum:12.08.2013
-
ISBN:
-
DOI:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Elektronische Ressource
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis Konferenzband
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
Development of a Multi-Habitat Umbrella Mitigation Banking Agreement at the Port of Los AngelesPrickett, Katherine / Curtis, Kathryn / Burnam, Joshua / Malone, Jack / DeSantis, Lena et al. | 2013
- 9
-
A Living Shoreline Approach to Protect Historic Structures on Ocracoke IslandDoll, Jason C. / Martin, Johnny D. et al. | 2013
- 19
-
Port of Seattle Terminal 10: From Superfund to Active UseGeiselbrecht, A. / McCullough, M. / Nielsen, Vern / Meyer, Paul et al. | 2013
- 29
-
Making a Business Case for LID Treatment MethodsHarne, Melissa et al. | 2013
- 39
-
Balancing Engineering and Resource Agency Requirements to Create Shallow Water HabitatPollard, Matthew / Foxworthy, John et al. | 2013
- 49
-
Reducing Inwater Pile Driving Sound - What Are My Options?Leslie, Brian / Schwertner, Margaret et al. | 2013
- 60
-
Methodology for Assessing and Providing Recommendations for Waterfront Lighting Efficiency ImprovementsMcKee, Sean / Jose, Gregory et al. | 2013
- 70
-
Randle Reef Sediment Remediation ProjectKellems, Barry / Fabian, Kristof / Orchard, Barbara / Parmelee, Rhiannon / Bonkoski, Brooke / Spadaro, Philip / Beaver, Jamie / Fitzgerald, William P. / Santiago, Roger / Rozenberg, Wally et al. | 2013
- 80
-
Habitat Development for Eco-Credit in Port SettingsWatson, Nathan / Severn, Shawn R. T. / Granger, Bill / Lockert, Scott et al. | 2013
- 90
-
Place of Circling Waters - Industrial Land to Habitat SiteWatson, Nathan / Myers, David / Conner, Leslee / Kozak, Michaella / Horvitz, Garry et al. | 2013
- 100
-
Building Effective Compensatory Marine Habitat for Arctic PortsClarke, Jason / Martin, Christopher / Wright, Stewart et al. | 2013
- 109
-
Port of Long Beach LEED Building Program at Pier GKozma, Nicholas C. / Alcorn, Alan E. / Caldwell, John / Pearson, Jennifer / McEvoy, Ryan et al. | 2013
- 119
-
Endangered Species Act and Marine Mammal Protection Act Permitting in the Pacific NorthwestReeder, Tabitha / Carrico, Brian / Gunderson, Dan et al. | 2013
- 129
-
Programmatic Permitting for Maintenance ActivitiesGunderson, Dan / Carrico, Brian et al. | 2013
- 139
-
Port of Anacortes Former Scott Paper Mill Cleanup ProjectHyde, B. / Horine, A. / Johnson, C. / Phillips, S. / Shepsis, V. et al. | 2013
- 148
-
Lockheed Shipyard Capping and Shoreline RestorationPhillips, Shane / Shepsis, Vladimir / Simpson, David P. et al. | 2013
- 158
-
Permitting, Collaboration, and Sustainability of the Paulsboro Marine TerminalLawrence, Christopher A. / Peterson, Marlin J. et al. | 2013
- 168
-
Future Marine Highway Development in the U.S.McLeod, Shannon / Stromberg, Erik / Douglas, W. Scott / Bea, Jr., Paul H. et al. | 2013
- 178
-
Approach to Remedial Dredging for Legacy Contaminants, Port of Long Beach IR Site 7 West Basin SiteUeda, Emily / Houston, Christine / Graham, Todd / Cappellino, Steve et al. | 2013
- 188
-
Photovoltaic Solar Power at the Port of Los AngelesBaldenegro, Carlos C. et al. | 2013
- 195
-
Beneficial Reuse of Dredge Spoils from Squalicum HarborKinsella, S. / Pischer, D. / Gouran, B. / McRae, B. et al. | 2013
- 205
-
Performance of Constructed Habitat BeachSimpson, David / Klekotka, John et al. | 2013
- 215
-
The Challenge of Replacing Existing InfrastructureKirchner, Chuck et al. | 2013
- 225
-
Rich Passage 1 Wake Validation and Shore Response StudyCôté, Jessica M. / Curtiss, Greg / Osborne, Philip D. et al. | 2013
- 235
-
Managing Flooding Risk in Response to Sea Level RiseRichardson, Bob / Simpson, David P. / Haub, Andy et al. | 2013
- 245
-
Adapting Ports to the Impacts of Climate ChangeWright, E. / Wells, L. / Dhingra, E. / Toplis, C. et al. | 2013
- 255
-
Fish Tissue Targets for PCB TMDLs: What is the Real Risk? An Example from the Greater Los Angeles and Long Beach Harbor Waters TMDLDarby, E. / Arms, M. / Jirik, A. / Curtis, K. / Anghera, S. / Glaser, D. / Hovel, W. / Poon, Y. et al. | 2013
- 262
-
Legacy Pollutant Total Maximum Daily Loads:An Oxymoron?Darby, E. / Rhea, J. / Benaman, J. / Anghera, S. / Glaser, D. / Hovel, W. et al. | 2013
- 272
-
Climate Change Risk Management for PortsWright, Stewart et al. | 2013
- 282
-
Port of Seattle - A Collaborative Emission Reduction Success StoryWatson, Ellen L. et al. | 2013
- 292
-
Whatcom Waterway Cleanup of Phase 1 AreasWoltman, M. / Wang, T. et al. | 2013
- 302
-
Sustainable Design and Construction Guidelines for PortsAryan-Zahlan, Dina / Graves, Ralph / Rebstock, Jan Green / Sereno, Doug / Van Wormer, Tim et al. | 2013
- 312
-
Masonville Dredged Material Containment Facility:Mitigation Design Including Shore Protection, Reef Creation, and Wetlands RestorationKotulak, Peter W. et al. | 2013
- 322
-
Successfully Incorporating Environmental Commitments into Plans and Specifications for Port ProjectsKoellmann, D. S. et al. | 2013
- 332
-
Design and Permitting the Des Moines Marina ImprovementsWalter, Katie / Peirce, Web / Hemphill, Mike / Dusenbury, Joe et al. | 2013
- 341
-
Light Emitting Plasma Fixtures for Port FacilitiesWard, Thomas / Lurie, Brad et al. | 2013
- 351
-
Universal Composite Submarine Camels - Design of a PrototypeStauder, James B. / Lambros, Matthew H. / Reeve, Scott et al. | 2013
- 361
-
Comparison of Approaches to Automated Terminals: USA vs. EuropeJohnson, Daniel J. / Kats, Jeroen et al. | 2013
- 371
-
Features of the APL Los Angeles 22-Wide STS CranesJordan, Michael / Olsen, David / Oritatsu, Yoshi / McCarthy, Patrick et al. | 2013
- 381
-
The Impact on Maintaining Our Federal Channels with Today's Fiscal RealitiesBryant, J. T. / White, S. M. / Ludwig, F. M. et al. | 2013
- 391
-
Evaluation of the Impact on St. Johns River Circulation and Salinity for the Jacksonville Harbor Deepening ProjectLiu, Xiaohai / Kabiling, Michael B. / Bratos, Steven M. et al. | 2013
- 402
-
Harbor-Wide Passing Cruise Ship Surge Study, Port Canaveral, FLFenical, S. / Rice, S. / Salcedo, F. / Walsh, J. et al. | 2013
- 412
-
Mamainse Harbour Deepening - Revitalising Local EconomyJenkins, H. / Kullman, H. / Roper, A. et al. | 2013
- 418
-
Channel Requirements for Offshore Petroleum ExplorationBerlin, Joseph E. et al. | 2013
- 427
-
ULCS Mooring/Propwash Analysis, Port of Oakland, CATirindelli, M. / Fenical, S. / Shepsis, V. / Mac Donnell, B. et al. | 2013
- 437
-
Columbia River Vessel Arrival/Departure AnalysisKrcma, Karl / Burnette, Eric / Degens, Sebastian et al. | 2013
- 447
-
Mixed Sediment Modeling for Matagorda Ship Channel, TexasLin, L. / Li, H. / Ferro, M. / Reed, C. W. et al. | 2013
- 462
-
Emergency Barge Slip Repair Requires Creative SolutionsHingtgen, Jim / Riley, Bob / Lindquist, Doug et al. | 2013
- 472
-
Port of Long Beach (-)76 MLLW Main Channel DredgingThiessen, Doug / Ueda, Emily / Watanabe, Janna / Fields, Jim / Graham, Todd / Cappellino, Steve / Alcorn, Alan et al. | 2013
- 482
-
AIS History and Future Improvements in Waterway ManagementScully, B. M. / Mitchell, K. N. et al. | 2013
- 492
-
Pontoon Launch Channel Analysis, Design and PerformanceDarnell, Joel / Shepsis, Vladimir et al. | 2013
- 502
-
Bayport Ship Channel Improvements ProjectSepulveda, Carl / Judith, Ashley / Casebeer, David / Vincent, Mark et al. | 2013
- 512
-
Integrated Modeling and Sedimentation Management: the Case of Salt Ponds Inlet and Harbor in VirginiaBarua, D. K. / Crum, P. / Truitt, C. / Walther, M. et al. | 2013
- 522
-
Dredged Material Management Planning for Florida's Intracoastal and Okeechobee WaterwaysBrownell, Lori S. / Adams, John F. et al. | 2013
- 532
-
IHNC- Seabrook Sector Gate Complex - How We Arrived Here After Hurricane KatrinaZahid, M. Anwar / Enam, M. Badre et al. | 2013
- 541
-
Waterway Improvement Work with Underwater Tubular Pile Walls Driven by the Press-in Piling MethodTakuma, T. / Nishimura, H. / Kambe, S. et al. | 2013
- 550
-
Detailed Simulation of Tsunami-Induced Currents in California Ports and HarborsLynett, Patrick / Borrero, Jose / Wilson, Rick / Miller, Kevin / Son, Sangyoung et al. | 2013
- 560
-
Kodiak Pier 3 - Ship Motion Tests for a Solid Fill and Pile-Supported PierSultan, Nels J. / Sampath, Ajay / Randall, Robert E. / Zhi, Yuanzhe / Luai, Andres et al. | 2013
- 570
-
Accelerated Bridge Construction (ABC) Techniques for Heavy Lift (HL) & Materials Off-Loading Facility (MOF)Arora, Dushyant / Traber, James / Byres, Ron et al. | 2013
- 580
-
The Execution of a Comprehensive Dock Condition SurveyCaudill, Chris / Hingle, Joanna / Asavareungchai, Sam / Sidler, Andre et al. | 2013
- 590
-
Seismic Isolators in Pile-Supported WharvesLeal, Joan / De La Llera, Juan Carlos / Aldunate, Gregorio et al. | 2013
- 600
-
Model Investigations on Wave Disturbance and Vessel Movements in Dawei Sea Port, MyanmarBayram, Atilla / Carr, Christopher / Zhang, Yang / Knox, Paul et al. | 2013
- 610
-
Performance of Port and Harbor Structures Impacted by the March 11, 2011 Great Tohoku Earthquake & TsunamiPercher, M. / Bruin, W. / Dickenson, S. / Eskijian, M. / Oritatsu, Y. / Rudolph, R. W. et al. | 2013
- 620
-
Seismic Response of Nonstructural Components Supported on Piers and WharvesSrivastava, Siddharth et al. | 2013
- 630
-
Deep Dynamic Compaction:Practical and Cost-Effective Ground Improvement at the Port of Long BeachSieradzki, Mariusz P. / Patton, Bartlett W. / Sereno, Douglas J. / Wehrlen, Paul et al. | 2013
- 640
-
Slope Rehabilitation and Berth Deepening of PortMcGregor, Carla / Ramsden, Mark / Yung, Willy et al. | 2013
- 650
-
Post-Katrina Terminal Rehab Prepares Way for GrowthBergman, Adam / Conn, Joe / Watson, Nathan et al. | 2013
- 660
-
Ground Improvement to Enhance Bulkhead Seawall StabilityGilbert, Gary K. / Yourman, Jr., Allen M. / Isa, Clint / Grossi, Chris et al. | 2013
- 670
-
Collection of Berthing Velocities and Resulting Design Recommendations by PIANC Working Group MarCom 145Burkhart, Elizabeth C. / Matakis, Kevin E. et al. | 2013
- 679
-
Optimization of Maintenance Dredging Requirements at Berths 1 through 10, Port of Vancouver, WAUglum, Lars / Shepsis, Vladimir / Dawson, John et al. | 2013
- 686
-
Fender Modernization at Pier 1, Port of Davisville, RIPage, Matthew J. / Fiscaletti, Dino D. et al. | 2013
- 696
-
Floating Port - Design, Construction, and TestAhn, Woosuk "Willy" / Han, Sang-Hun / Na, Seong-Won / Jung, Seung-Jin et al. | 2013
- 706
-
Designing Floating Wave Attenuators for Long Period WavesCox, Jack C. / Stangland, Jason et al. | 2013
- 716
-
Accelerated Freshwater Corrosion Protection & Remediation of Structures in Cold RegionsScott, Chad / Clark, Gene et al. | 2013
- 726
-
AIMS Array Design and ConstructionRobbins, Daniel / Bretzke, Jason / Rambough, Frank / Miller, Mathew et al. | 2013
- 735
-
Ship Loader Platforms Using a Pile/Micropile SystemGalloway, Joe / Mjelde, Jon / Allen, Bill et al. | 2013
- 745
-
Survey Assessments for Waterfront Facility EngineeringMitchell, T. J. et al. | 2013
- 755
-
Automated Container Terminal Design at the POLAFedrick, Adrienne / Sar, Christina / Desai, Milind et al. | 2013
- 765
-
Life-Cycle Management - West Coast Deep Sea WharfRamadhas, Vignesh / Bleasdale, Anthony et al. | 2013
- 775
-
Double-Decked Piers: A New Reality for West Coast Marine Oil Terminals USN P-151 Replace Fuel Pier Project, NBPL, San Diego BayDubbs, Bill / Sanchez, Alberto / Bogage, Adam et al. | 2013
- 785
-
Slender Marine Pile Design for Gravity LoadsSchneider, Stephen P. / Branlund, C. Scott et al. | 2013
- 795
-
Megayacht Mooring Study - Conversion of a Historic Facility for Modern-Day Use, Embarcadero Wharf, San Diego, CaliforniaFinkler, Jacob / Smith, Eric et al. | 2013
- 805
-
An Innovative Method of Enhancing Deep Water Wharf StabilityStringer, Stuart J. / Walter, Catrina A. / Pesicka, Benjamin et al. | 2013
- 815
-
St. Louis Service Base Floating Wharf Mooring System ReplacementBozorgzadeh, A. / Jensen, B. M. / Murtaugh, B. R. / Koelling, B. N. et al. | 2013
- 825
-
Jet Grouting Improvement at Pier D, Port of Long BeachVaratharaj, Raj S. / Pratheepan, Pratheep K. / Arulmoli, Arul K. / Trowbridge, Matt / Baldwin, Tom et al. | 2013
- 835
-
Port of Portland T6 Berth 604-605 Seismic Upgrade and Modernization ProjectChin, King H. / Dittmer, Dave / Carlson, Jenny et al. | 2013
- 845
-
New ASCE Waterfront Facilities Inspection & Assessment ManualHeffron, Ron et al. | 2013
- 851
-
Pier E Construction Challenges at Port of Long BeachTrowbridge, M. / Jaradat, O. / Arulmoli, K. / Baldwin, T. et al. | 2013
- 861
-
Port Pavilion at Broadway Pier, Design and Construction of a Modern Building on a 100-Year-Old Structure, San Diego Unified Port District, San Diego, CaliforniaMartinez, Matthew N. / Whitsel, Rod et al. | 2013
- 871
-
Fender Modernization at Veterans Terminal, Pier MJones, Bryan N. / Shaffer, John M. / Morgan, Benjamin J. et al. | 2013
- 881
-
Recent Advances in Prefabricated Vertical DrainsGoldberg, A. D. / Palmatier, M. A. et al. | 2013
- 890
-
Innovative Rigid Concrete Fender System Reduces Life Cycle CostsBroos, E. J. / van Schaik, C. / Huitema, S. et al. | 2013
- 900
-
Effects of Soil Lateral Loading on Marine StructuresUlmer, Michael S. / Stehmeyer, III, Edward H. et al. | 2013
- 910
-
Design Build Fender System and Panelized ConstructionSchilling, T. J. / Allen, William L. et al. | 2013
- 919
-
Geotechnical Challenges in Reclamation of a Soft Soil SiteMcArthur, Morgan et al. | 2013
- 929
-
Newport Dock Remediation and Geotechnical Risk Mitigation in Variably Weathered Rock ConditionsSchlechter, S. M. / Greenfield, M. W. / Reed, M. W. et al. | 2013
- 939
-
The Roi-Namur Fuel Pier Rehabilitation in the Kwajalein AtollStromberg, Daniel G. / Benitez, Luis D. et al. | 2013
- 949
-
Coastal Engineering Analysis for Airport Improvements, False Pass, AKSierra-Carrascal, Eduardo / Connell, Kenneth J. / Curtiss, Greg / Osborne, Philip D. et al. | 2013
- 959
-
Earthquake Mitigation at Washington United Terminal Tacoma, WASquires, Garry H. et al. | 2013
- 969
-
Bulkhead Design Procedure and Challenges on Harbor IslandJain, Pooja / Chin, King H. et al. | 2013
- 979
-
Innovative Approach to Reuse Existing Elements Yields Cost-Effective Dock UpgradePaparis, B. / Prilutsky, V. / Czernikiewicz, J. / Snow, J. / Dolan, P. et al. | 2013
- 989
-
Replacement of a Failing Bulkhead Wall with Inches to SpareFrank, Ian / Bergman, Adam / Horvitz, Garry / Koellmann, Derek et al. | 2013
- 999
-
Rail Trench Structure Design at Port of Vancouver USAWells, Howard A. / Maxwell, Brian S. / Westrand, Greg / Sircar, Jyotirmoy et al. | 2013
- 1009
-
Container Berth Bridges over Sewer TunnelPaparis, B. / Nauss, S. / Boisvert, B. R. / Buzzoni, G. et al. | 2013
- 1018
-
Design of a Steel Stop Log Gate and Basin OperationsLighty, Trevor / Bennett, Andrew / Moore, Stuart et al. | 2013
- 1028
-
Design and Construction of a Cruise Pier with Time and Location Constraints at Royal Caribbean's Private Destination in Labadee, HaitiDorang, Christopher / Chiariello, Melynne / Mock, David / Weis, John et al. | 2013
- 1038
-
Pile Capacity Setup in Fine-Grained Glacial Deposits at the South Brooklyn Marine TerminalMorgan, Russell / Pizzimenti, Paul / Walsh, Kathy / Margeson, Greg et al. | 2013
- 1048
-
Time-Critical Port Terminal Shore Protection Design: Supporting the Port of Gulfport Restoration ProgramHenderson, Matthew / Reemts, Mark / Mears, Wendell / Mohan, Ram et al. | 2013
- 1058
-
Port Canaveral North Cargo Berth 5 & 6 WharfVieira, Anthony L. / Ledford, Gary D. / Rice, Sandra D. / Landry, Tony et al. | 2013
- 1068
-
Minimizing Disruptions During Shore Power InstallationHernandez, Jose / Litzinger, John / Sagredo, Victor et al. | 2013
- 1077
-
Geotechnical Design:Deep Water Pontoon Mooring AnchorsUpsall, Ben / Horvitz, Garry / Riley, Bob / Howard, Tripp / Olsen, Kimball / Struthers, James R. et al. | 2013
- 1087
-
Structural Design of Deep Water Pontoon Mooring AnchorsHoward, Tripp / Riley, Bob / Upsall, Ben / Horvitz, Garry et al. | 2013
- 1097
-
Fast Track Project Yields Economic Benefit to CommunityFaris, Norm / Schlechter, Scott et al. | 2013
- 1107
-
Improvements for an Aging Sheetpile Wharf at Mayport Naval StationMozo, M. R. / McCullough, Nason J. et al. | 2013
- 1117
-
Seismic Investigation/Below-Water Load Test for a 100-Year-Old PierHarn, Robert / Martinez, Matthew et al. | 2013
- 1127
-
Practical Implementation of Marine Concrete Specifications for Waterfront StructuresGiza, Jeffrey F. / Burke, Douglas F. et al. | 2013
- 1137
-
A Case Study in Cellular Cofferdam Life Extension DesignBasford, Jeffery R. / McCarty, Matthew A. et al. | 2013
- 1147
-
Test Pile Program at Naval Base Kitsap - BangorColson, Nick / Lindquist, Doug / Stockwell, Joseph et al. | 2013
- 1157
-
Seismic Improvements and Upgrade of Uniform and Tango Wharves Located on U.S. Naval Base GuamArulmoli, Arul K. / Varatharaj, Raj S. / Schulze, Carl / Bogage, Adam / Chan, Dick et al. | 2013
- 1167
-
Use of Soil-Structure Interaction Analyses to Optimize Cement Silos Foundation DesignRoth, Wolfgang / Hadfield, Philip / Su, Bei / Dawson, Ethan et al. | 2013
- 1177
-
Seismic Retrofit of a Historic Pier Using Lead-Rubber BearingsKilborn, Jeff / Firat, Yeliz / Harn, Robert / Branlund, Scott et al. | 2013
- 1187
-
Innovative Wharf Details:Elastomeric Bearing Pile-Deck Connection and Finned MonopileSoderberg, Erik / Lind, Derrick / Loni, Sugi et al. | 2013
- 1197
-
Seismic Design of the Uniform Wharf in GuamKlusmeyer, Louis A. / Yang, Frank L. / Firat, Yeliz et al. | 2013
- 1207
-
Seismic Design of Bulkhead and Foundation in Stratified Soft Clay and Liquefiable SoilsChin, King H / Sheng, George / Zinserling, Manfred / Kumar, V. K. et al. | 2013
- 1217
-
Remediation of Grain Off-Loading Facility in Corpus Christi, TXShin, Seungcheol / McCullough, Nason J. / Portwood, Bill / Rock, Mark et al. | 2013
- 1227
-
Washington United Terminals Berth ExtensionEnglish, Daryl / Mjelde, Jon / Bickel, Scott et al. | 2013
- 1235
-
Post-Earthquake Repair and Improvements, San Vicente, ChileBardi, John C. / Sircar, Jyotirmoy / Smith-Pardo, J. Paul et al. | 2013
- 1245
-
Infrastructure Design for Automated Container Stacking AreaAlamir, Reza / Jaradat, Omar A. / Jacob, Ashebir et al. | 2013
- 1255
-
Crane-Wharf Interaction Nonlinear Time-History Analysis for Pier E Wharf at the Port of Long BeachJaradat, O. / Lai, Cheng / Elsadek, A. et al. | 2013
- 1265
-
Anticipated Changes to Los Angeles Building Code Due to IBC 2012: Impact on the Seismic Design of Building Foundations on Liquefiable Soils at the Port of Los AngelesLim, A. / Martin, G. R. / Arulmoli, K. / Jaradat, O. / Cisneros, H. / Varatharaj, S. / Bachman, R. E. et al. | 2013
- 1275
-
Rapid Bridge Construction Methods Applied to Piers and WharvesJaradat, O. et al. | 2013
- 1285
-
Foundation Design in Weathered Limestone - Where Will the Piles End?McCullough, Nason J. / Dorang, Christopher et al. | 2013
- 1295
-
Development of Wave Protection for Port of Long Beach Pier FFassardi, Claudio. / Zhang, Yang / Gordon, IV, George E. et al. | 2013
- 1305
-
Load Test Procedures for In-Service ShiploadersLeonard, D. E. / Thomson, R. M. et al. | 2013
- 1315
-
Marine Construction Logistics for a LNG Export FacilityErickson, Bradley. P. / Marsden, Paul / Kirkup, Paul / Vanderloos, Clem et al. | 2013
- 1325
-
Foundation System for a New Grain Export TerminalKocijan, J. / Andrews, R. / Smith, P. / Jones, S. et al. | 2013
- 1335
-
Systemic Coating Failure on a Nuclear Submarine Drydock, Evaluation and an Engineering SolutionTinnea, Ryan / Sutter, Benjamin / Ostbo, Bruce I. et al. | 2013
- 1345
-
The New ASCE Standard for Seismic Design of Piers and WharvesJohnson, Gayle S. / Harn, Robert / Lai, Cheng / Jaradat, Omar et al. | 2013
- 1355
-
Mega Vessels and Quay WallsTaneja, P. / Zwakhals, J. W. / Vellinga, T. et al. | 2013
- 1365
-
Home Again for the EagleO'Connor, Daniel W. / Kremer, Jason et al. | 2013
- 1375
-
In-Situ Testing of Mooring BollardsMcGeady, F. X. et al. | 2013
- 1385
-
Planning and Design of A New Public Open Space WharfLewis, Craig / Serrahn, Clay / Reel, Steven et al. | 2013
- 1395
-
Bahia Urbana: Overcoming Structural Engineering Challenges for Successful Port Redevelopment, San Juan, Puerto RicoArmbruster, Jonathan / Verkerk, Hubert / Lavergne, Héctor / Amy, Carlos et al. | 2013
- 1405
-
Lyttelton Port of Christchurch Seismic Resiliance from an Owner's PerspectiveChalmers, Gary / McLennan, Neil / Barsanti, Leonard et al. | 2013
- 1415
-
Computer Simulation of Moored Ship Motion Considering Harbor Resonance in Pohang New HarborKwak, Moonsu / Pyun, Chongkun et al. | 2013
- 1425
-
Seismic and Tsunami Design Considerations for Essential Port Facilities - Case StudiesBrawner, Katherine R. / Bishop, Erik S. / Swanson, David B. / Hammer, Corbin M. / Lum, Lance K. / Heidenreich, Michael / Chahim, Abdul et al. | 2013
- 1434
-
Port of Long Beach and Port of Los Angeles Advanced Transportation Management and Information System (ATMIS)Choe, Tom / Gordon, IV, George E. / Martinez, Jr., Guillermo et al. | 2013
- 1444
-
POLA Pier 500 Planning, Hydrodynamic and Berthing StudiesLi, Xiao (Steven) / Sisson, Mark / Brown, Chris / Khouri, Jeff / Schmeltz, Edward et al. | 2013
- 1454
-
Concrete Facing as Protective Coating for Navy CofferdamHingtgen, Jim / Schindler, Greg / Spady, Jay / Helser, Greg / Watson, Nathan et al. | 2013
- 1463
-
Geotechnical Aspects of Deep Foundation Design and Construction at the SR520 Pontoon Casting FacilityMitchell, Robert / Moore, Stuart / Buechel, Gerard / Johnson, Cora et al. | 2013
- 1473
-
Port Requirements to Support Offshore Wind Development in North AmericaCooper, Brent D. / Marrone, Joseph F. et al. | 2013
- 1483
-
Offshore Breakwaters for Port Development in BrazilSayao, Otavio J. et al. | 2013
- 1493
-
Making the Destin Harbor Boardwalk Happen: A Public/Private Partnership RealityBomar, Michael B. et al. | 2013
- 1502
-
The North Carolina Maritime Strategy: Enhancing the North Carolina Economy through Investments in the State's Maritime InfrastructureVandenberg, R. C. / Canales, R. et al. | 2013
- 1512
-
The SAFRR Tsunami ScenarioPorter, K. / Jones, L. / Ross, S. / Borrero, J. / Bwarie, J. / Dykstra, D. / Geist, E.L. / Johnson, L. / Kirby, S. / Long, K. et al. | 2013
- 1522
-
Redeveloping and Diversifying Port Land in MilwaukeeKlancnik, Fred / Sullivan, Larry et al. | 2013
- 1532
-
Bringing a Port in the 21st Century: Master Planning Iskenderun PortPachakis, Dimitrios / Saad, George / Jacob, Ashebir / Nye, Larry / Yildiz, Resit et al. | 2013
- 1542
-
Effective Maintenance Using a Database Management ToolTeeden, Matthew L. / Colby, LT Richard C. / Bachtel, LT Brian D. et al. | 2013
- 1552
-
The Port/Community Edge: A Successful Case StudyBrown, Chris / Aryan-Zahlan, Dina / Hamwey, Stephen et al. | 2013
- 1562
-
What if We Don't? An Economic View of Seismic UpgradeJohnson, Darin / Kuebler, Scott / Bernstein, Jeri / Cook, Dave et al. | 2013
- 1572
-
Nanaimo Cruise Ship Facility - OverviewKeiser, Jon / Nottingham, Todd / Johnson, Rian / Dumas, Bernie et al. | 2013
- 1582
-
Case Study - Developing and Implementing an Asset Management Program Aligned to the Business Needs of One Seaport at its CentennialPattison, Scott H. et al. | 2013
- 1592
-
Asset Management Program Development and Implementation for the Port of Tacoma - Port of Tacoma, Tacoma, WAPaulsen, Lou / Tremaglio, Richard / Spencer, Thomas et al. | 2013
- 1601
-
Transformation of Commercial Harbor to Urban UsesLayton, Jeffrey A. / Becker, Jeffrey T. et al. | 2013
- 1611
-
Berth Allocation in Container Ports: A Particle Swarm Optimization (PSO)-Based ApproachJoharianzadeh, Mohammad / Babazadeh, Abbas / Fakher, Ali et al. | 2013
- 1623
-
Integrated Approach to Marine Terminal DevelopmentGarcia, Blair / Franck, David / Schechtman, Jeff et al. | 2013
- 1633
-
Construction Management Opportunities and Challenges at Middle HarborCardamone, Gary J. / Cowan, Douglas / Mackie, Bryon et al. | 2013
- 1644
-
Environmental Construction Management at Middle Harbor Port of Long BeachBierei, Mark / Cardamone, Gary J. / Laugier-Diamond, Maryline et al. | 2013
- 1656
-
Construction of Ocean Reef Islands Residential CommunityFierro, José / Magaña, Abel / Zinserling, Manfred H. et al. | 2013
- 1666
-
Construction of a New Aggregate Export TerminalMattila, Mark / Sridhar, Sid / Wilson, Herb et al. | 2013
- 1676
-
Subsea Pipelines and Calm Buoy SystemMattila, Mark / Johansen, Carlos et al. | 2013
- 1686
-
Design-Build Efforts for Naval MarinaJenkins, Zachary D. / Shorey, David et al. | 2013
- 1696
-
Construction Management in a Foreign Land - SP-SSA and Cai Lan International Container Terminals, VietnamCornell, Christopher B. / Ozolin, Brett / Platt, Richard et al. | 2013
- 1706
-
Modeling the Economics of Port ResiliencyGajjar, H. M. / McLeod, S. / Wakeman, III, T. H. et al. | 2013
- 1716
-
Replacement of Tsunami-Damaged Crescent City MarinaTrenkwalder, Ted W. / Stover, Ward / Young, Richard et al. | 2013
- 1726
-
Port of Redwood City Wharves 1 & 2 ReplacementTrenkwalder, Ted W. / Gerwick, Jack W. / Snaman, Don K. / Giari, Michael J. et al. | 2013
- 1736
-
Deltaport Intermodal Railyard Capacity StudySisson, Mark et al. | 2013
- 1743
-
Westport Marina Redevelopment ProjectAhn, Woosuk "Willy" / McRae, Blaine G. / Benn, Lisa A. et al. | 2013
- 1753
-
Designing a Harbor Entrance to Defeat Swell Wave AgitationWesson, Mauricio / Cox, Jack C. et al. | 2013
- 1764
-
New PIANC Guidelines for Marine Oil and Petrochemical Terminal DesignHeffron, Ron / Asante, William / Eskijian, Martin / Johnson, Gayle et al. | 2013
- 1772
-
Swartz Bay Ferry Terminal, Berths 4 & 5, Standardization & RebuildNg, Michelle / Hebden, Ray / Seitz, Robert et al. | 2013
- 1782
-
Upgrading Shore Facilities for 3 New Ferries Propelled by LNGBoucher, Jean-Pierre et al. | 2013
- 1792
-
Planning and Design of a Regional Delivery Hub for the Next Generation of Bulk Carrier Vessels in West AfricaMabija, S. et al. | 2013
- 1802
-
Pedra de Ferro Offshore Port, Bahia, BrazilMicklem, Graham / Neville-Jones, Peter et al. | 2013
- 1812
-
Planning, Design and Realization of a Successful Automated Container TerminalKaptein, R. / Nye, L. / Richter, M. / Jacob, A. / Ranta, P. / Baldwin, T. et al. | 2013
- 1822
-
Agile Simulation Analysis for Automated Container Terminal and Intermodal Facility Development and PlanningZhang, Yu (Alan) / Baldwin, Thomas / Nye, Larry / McCarthy, Michael / Richter, Michael / Jacob, Ashebir et al. | 2013
- 1832
-
Floating Bridge to Floating Docks:Complex Criteria for Small Craft Naval HarborDoonan, Melissa / Riley, Bob / Sultani-Wright, Katherine V. et al. | 2013
- 1842
-
Bridging the Gap - Cai Lan International Container Terminal, VietnamMalla, Ajaya P. / Cornell, Christopher B. et al. | 2013
- 1852
-
Designing Buildings for New Automated TerminalsFarrell, Bruce R. et al. | 2013
- 1862
-
Grain Dock Development at Port of Longview, WAJoque, Darrell T. / McMahon, Scott / Krehbiel, Norman G. et al. | 2013
- 1872
-
Planning and Design of the Port of Cristobal Phase 2 Expansion -Colon, PanamaZinserling, Manfred / McMahon, Scott / Puente, Jorge et al. | 2013
- 1882
-
Planning for the TraPac Automated Container TerminalDi Meglio, Louis J. / Sisson, Mark et al. | 2013
- 1891
-
Design and Construction of a Bunker Fuel Transfer Pier at Melones Island, PanamaOspina, Carlos E. / Kumar, Viswanath K. / Morales, José A. et al. | 2013
- 1901
-
Mozambique LNG Port - A Catalyst for ProsperidadeThomas, Jonathan E. / Wise, Larry A. / Hampson, R. / Weinbel, R. Cory / Kaplan, Al et al. | 2013
- 1911
-
Accelerated Delivery for Retrofit of Existing Navy Pier to a Crude DockMatakis, Kevin E. / Moore, Brent et al. | 2013
- 1919
-
Design and Construction of Berth IV Marginal Wharf at Seagirt Marine TerminalShafer Jr., Thomas / Knott, Michael / Joines, Nicholas et al. | 2013
- 1929
-
Breakwater Layout Optimisation Using A Root-Finding AlgorithmRustell, Michael et al. | 2013
- 1939
-
A Comparative Study on Van der Meer (1988) and Van Gent et al. (2004) Stability FormulaeGuler, Hasan Gokhan et al. | 2013
- 1948
-
Duffy Dock: Proposed Offshore Mooring Alternative for Newport Beach, CAStoica, Dale et al. | 2013
- 1955
-
Hydrodynamic Modeling of Tides and Hurricane Storm Surge for Pre- and Post-Dredging Conditions in the Lower St. Johns River, FloridaBilskie, Matthew V. et al. | 2013
- 1965
-
Investigation of the Design and Dredging Maintenance for a Rural Marina in Cedar Key, FLBranyon, Jackie / Greer, Duncan / Feng, Cici / Womak, Corey et al. | 2013
- 1974
-
A Numerical Wave-Structure-Soil Interaction Model for Monolithic Breakwaters Subject to Breaking Wave ImpactSafti, Hisham El et al. | 2013
- 1985
-
An Update on Pile-CPTu Direct CorrelationsNiazi, Fawad S. et al. | 2013
- i
-
FrontmatterOstbo, Bruce I. / Oates, Don et al. | 2013