Pipe Profiling Using Digital Image Correlation (Englisch)
- Neue Suche nach: Tehrani, Amin Darabnoush
- Neue Suche nach: Kohankar Kouchesfehani, Zahra
- Neue Suche nach: Najafi, Mohammad
- Neue Suche nach: Tehrani, Amin Darabnoush
- Neue Suche nach: Kohankar Kouchesfehani, Zahra
- Neue Suche nach: Najafi, Mohammad
In:
Pipelines 2020
: Condition Assessment, Construction, Rehabilitation, and Trenchless Technologies
;
36-45
;
2020
-
ISBN:
- Aufsatz (Konferenz) / Elektronische Ressource
-
Titel:Pipe Profiling Using Digital Image Correlation
-
Beteiligte:Tehrani, Amin Darabnoush ( Autor:in ) / Kohankar Kouchesfehani, Zahra ( Autor:in ) / Najafi, Mohammad ( Autor:in )
-
Kongress:Pipelines 2020 ; 2020 ; San Antonio, Texas (Conference Held Virtually)
-
Erschienen in:Pipelines 2020 : Condition Assessment, Construction, Rehabilitation, and Trenchless Technologies ; 36-45
-
Verlag:
- Neue Suche nach: American Society of Civil Engineers
-
Erscheinungsort:Reston, VA
-
Erscheinungsdatum:06.08.2020
-
ISBN:
-
DOI:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Elektronische Ressource
-
Sprache:Englisch
-
Datenquelle:
Inhaltsverzeichnis Konferenzband
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
A Component-Based Approach in Assessing Sewer ManholesKaddoura, Khalid / Zayed, Tarek et al. | 2020
- 9
-
A Data-Driven Approach to Determine If New Water Mains Construction Can Cause Neighboring Old Water Mains to BreakTak, Muhammad / Kaifer, James / McHenry, Warren et al. | 2020
- 17
-
Advanced Desktop Screening Techniques for Feeder Main Networks to Drive Condition Assessment ProgramsMacey, Chris et al. | 2020
- 29
-
Critical El Paso Force Main with High Consequence of Failure Undergoes Multi-Faceted Condition AssessmentSchaaf, George / Antilla, Michelle / Lopez, Felipe / Hernandez, Ivan / Ancell, Michael et al. | 2020
- 36
-
Pipe Profiling Using Digital Image CorrelationTehrani, Amin Darabnoush / Kohankar Kouchesfehani, Zahra / Najafi, Mohammad et al. | 2020
- 46
-
DeKalb County: A Large Utility Gaining Efficiencies to Accurately Rehab Assets in a Timely FashionEastall, Darren / Boquin, Gerardo / Shaikh, Burhan et al. | 2020
- 55
-
Distribution System Condition Assessment for Guma Valley Water Company, Sierra LeoneMorton, Ty / DiLuca, Brian / Rolfe-Dickinson, Sandra et al. | 2020
- 64
-
Emerging Technologies and Systems for Gas Pipeline Leak DetectionAwolusi, Ibukun G. / Momoh, Ayodeji K. / Soyingbe, Aliu A. et al. | 2020
- 74
-
From the Rio Grande to the Well Fields in the North: How El Paso Water Manages a Critical 20-Mile Cross City Water MainSchaaf, George / Antilla, Michelle / Kurtz, Dave / Lopez, Felipe et al. | 2020
- 80
-
Predicting Condition of Sanitary Sewer Pipes with Gradient Boosting TreeMalek Mohammadi, Mohammadrza / Najafi, Mohammad / Salehabadi, Nazanin / Serajiantehrani, Ramtin / Kaushal, Vinayak et al. | 2020
- 90
-
Prediction of Pipe Failures in Wastewater Networks Using Random Forest ClassificationTavakoli, Razieh / Sharifara, Ali / Najafi, Mohammad et al. | 2020
- 103
-
Prioritizing Pit Cast Iron Small Diameter Watermains for AssessmentMady, Rabia et al. | 2020
- 111
-
Scattered Broken Wire Wrap Effects on Structural Capacity of Prestressed Concrete Cylinder PipesHajali, Masood / McNealy, Ashan / Dettmer, Andy et al. | 2020
- 123
-
SeeSnake Inspection of the 14-Inch Steel Water Main Attached to the Neuse River BridgeBrent Johnson, M. et al. | 2020
- 130
-
The City of San José Demonstrates Flexibility and Resolution to Accomplish Yard Piping Repairs Safely and QuicklyVisitacion-Sumida, Bernadette / Chavez-Vazquez, Mariana / Bellows, Peter / Slezak, Lloyd et al. | 2020
- 139
-
To CIPP or Not to CIPP: CCTV, Laser Profiling, and Core Sampling Assessment of a 66” and 72” RCP Sanitary SewerSchroeder, John P. / FitzGerald, Sean / Alpaugh, Matt et al. | 2020
- 150
-
Validation of Sonic/Ultrasonic Nondestructive Testing of PCCPMarshall, John / Fisk, Paul S. et al. | 2020
- 156
-
7.1 Magnitude Earthquake Causes 48-Inch Pipe to Float from below Lakebed to Lake Surface: How the Utility RespondedO’Malley, Willie et al. | 2020
- 167
-
CMAR Project Delivery Method Generates Team Orientated Project Management with Win/Win MentalityMarston, Sam et al. | 2020
- 171
-
DC Water Anacostia Force Main Emergency RepairOjdrovic, Rasko / Bian, Steve / DelloRusso, Steven / Pridmore, Anna et al. | 2020
- 179
-
DC Water at Work: Mitigating Century Old Infrastructure from Historic StormsZhao, Renni / Bian, Steve / Olatunji, Tayo / Regis, Dunbar et al. | 2020
- 191
-
DigIndy Tunnel System Collection Consolidation Sewer Construction UpdateMaynard, Nick J. / Glover, Jeff A. et al. | 2020
- 198
-
Forecasting Pipeline Construction Costs Using Time Series MethodsKim, Sooin / Abediniangerabi, Bahram / Shahandashti, Mohsen et al. | 2020
- 210
-
How Innovative and Adaptive Solutions Were Used to Solve Challenges Faced by Contra Costa Water District’s Canal Replacement ProjectDudley, Colin / Bellows, Peter / Stabb, Peter / La Vallee, Sarah et al. | 2020
- 219
-
Life of a 96-Inch Water LineHenry, Gregory / Price, Venus / Wilson, James et al. | 2020
- 227
-
Line Stopping the City of Houston’s Large Diameter Transmission Line for Valve ReplacementHernandez, Eric I. / Henry, Gregory J. / Sekhon, Singarpal et al. | 2020
- 237
-
Making the Flexible Pipe “Solid”: Achieving a Quality Flexible Pipe InstallationStephens, Benjamin E. / Myers, Emily S. et al. | 2020
- 247
-
Managing Risk through Contractor Selection: A Case StudyVeach, Coy / Weaver, Ed et al. | 2020
- 255
-
Mission Critical Corrugated Metal Pipe (CMP) RepairCamp, Craig et al. | 2020
- 264
-
Overcoming the Challenges of Large Diameter Water Project in North Texas via CMAR Delivery MethodJansen, Jason / Beck, Andrew et al. | 2020
- 272
-
Pipeline S and Replacement Challenges for a Critical Water Treatment Facility: San Pablo Water Treatment Plant and Clearwell ProjectBueno, Rolando / Yoloye, Jimi / Irias, Xavier / Bullock, Tom / Jesus, Frank / Morgan, Mykel et al. | 2020
- 281
-
Positive Unintended Consequences: How Campbell Lake Gravity Sewer Pipeline Line Survived a Magnitude 7.1 EarthquakePersinger, David / Gaston, Maury D. et al. | 2020
- 292
-
Proof Positive: Pipe Prove-Out Procedures Ensure Proper Installation during ConstructionFarah, George / Voss, Amanda et al. | 2020
- 299
-
Successfully Navigating the Challenges of Emergency Interceptor Repair under the Wall Street of WhiskeyHafner, David / Dodds, Heather / Ulliman, Nick / McReynolds, Michael et al. | 2020
- 309
-
What’s in Your Pipe? Quality Management for 100-Year Life Raw Water PipelineGaughan, Matt / Allen, Robert / Cameron, Charles / Fields, Bill / Hattan, Shelly / Veach, Coy / Weaver, Ed et al. | 2020
- 322
-
Too Pure Water from Orange County Water District Results in Pipeline Rehabilitation ProjectScott-Roberts, Sandy / Smith, Benjamin et al. | 2020
- 330
-
What’s That Smell? Odor and Corrosion Mitigation in Salt Lake CityMcGowan, Emma / Trimble, Maggi et al. | 2020
- 337
-
Construction of 176-in. and 156-in. Diameter Cast-In-Place Reinforced Concrete Siphons Expanding the East Low CanalPelzer, Kylie et al. | 2020
- 343
-
Performing a Reliability Centered Maintenance Workshop on the World’s Largest Prestressed Concrete PipesGeisbush, Jim et al. | 2020
- 352
-
A Framework for Evaluation of Social Costs of Open-Cut Pipeline Replacement for Sanitary SewersKaushal, Vinayak / Najafi, Mohammad / Serajiantehrani, Ramtin / Malek Mohammadi, Mohammadreza et al. | 2020
- 361
-
Case Study: Repurposing an Abandoned 3.2 Mile 66-Inch RCP Gravity Sewer as a New Force MainScott-Roberts, Sandy / Stanton, Andrew / ten Bosch, Richard et al. | 2020
- 372
-
Changes in Trenchless Construction Contracts and the Protection Afforded to Subcontractors under Contract LawOnsarigo, Lameck / Adamtey, Simon et al. | 2020
- 382
-
CIPP for Tomorrow: What Is Needed?Gipsov, Michael P. / Engindeniz, Murat et al. | 2020
- 393
-
Dallas Water Utilities Uses Sliplining to Rehabilitate Aging 24-Inch Water Transmission MainMinkler, Kevin / Valerio, Eduardo / Flores Box, Thelma et al. | 2020
- 402
-
Decision Making Process for Identifying Optimum Trenchless Method for Corrugated Metal Pipe Rehabilitation in StormwaterGarza, Nefi / Reyna, Roberto / Ogidan, Olufunso / Gaspard, Noelle et al. | 2020
- 411
-
VOC Mitigation Device for CIPP ExhaustHowell, Jason / Matthews, Elizabeth / Matthews, John et al. | 2020
- 420
-
Ground Displacements and Pulling Forces of Pipe-Swallowing in Well-Graded SandYan, Xuefeng / Ariaratnam, Samuel T. / Ma, Baosong / Zeng, Cong et al. | 2020
- 427
-
Five Trenchless Rehab Projects Save Failing Large Diameter Combined Sewer Structures in Albany, NYWalker, Keith R. et al. | 2020
- 433
-
Has This Been Tried Before? Using Trenchless Technology in a Revolutionary Sewer Tunnel RehabilitationParks, Randall / Hale, Mike / Ganse, Peggy / Irish, David / Lehrburger, Mike et al. | 2020
- 445
-
Large Diameter Cured-in-Place Pipe Rehabilitation of Twin 90-Inch Culverts in Environmentally Sensitive AreaCosta, Andrew et al. | 2020
- 451
-
Rehabilitation of a 42-Inch Industrial Pressure Pipe at Paper Processing PlantCosta, Andrew et al. | 2020
- 458
-
Sliplining 120-Inch RCP Wastewater in Dallas: Part 2Paris, Marty S. / Morgan, Ashlyn et al. | 2020
- 466
-
Trenchless Structural Rehabilitation of Non-Circular Pipe in Congested Utility Corridor of Commercial Business DistrictKrogness, Carl / Britt, Kara / Owen, Michael et al. | 2020
- 475
-
“Underground, under Where?” How Many Communities Are Turning to Trenchless Applications to Solve Their ChallengesSwartz, Jason T. et al. | 2020
- 485
-
Crossing the Red: Managing Construction Changes on a Challenging 1200 mm Microtunnelling River Crossing in Winnipeg, Manitoba, CanadaBraun, Adam / Kehler, Nathan / Thompson, Jordan / Cournoyer, Stacy et al. | 2020
- 495
-
Deep Tunnel Hydraulic Optimization and Stakeholder Coordination: Pleasant Run Deep Tunnel SystemLewis, Maceo R. / Hawbaker, Olivia et al. | 2020
- 504
-
Evaluation of Construction Methods for a 135-Inch Diameter Tunnel Crossing of a Major Highway BridgeLiga, Michael V. / Zelaya, Yovani A. / Tran, Kevin D. et al. | 2020
- 513
-
Four Trenchless Water Main Installations under an Active Railroad in Southeast FloridaAlexander, Janine M. / Montero, Wilhelmina et al. | 2020
- 521
-
HDD Construction Challenges up a Steep SlopeMacauley, Michelle et al. | 2020
- 530
-
Parametric Study on Ground Settlement of Sand and Clay Layer Due to Horizontal Directional DrillingAhmed, Asif / Islam, Md. Azijul et al. | 2020
- 540
-
Risks and Rewards in Completing a Design/Build Tunneling ProjectRamirez, Michael / Hernandez, Ivan et al. | 2020
- 549
-
Sewer Alignment Complexities in Historic Old Town TemeculaFriedman, Steven A. et al. | 2020
- 559
-
Simplified Application of the Delft Method to Estimate Maximum Allowable Annular Pressure in HDDPark, Inshik / Bayat, Alireza et al. | 2020
- 574
-
The Project That Wore Many HatsOjert, Kalin / Steed, Harrison / Kim, Hugh et al. | 2020
- 583
-
Trenchless Soil Stabilization of Marl Prior to Using Pilot Tube Method to Install New Sanitary SewerMatheny, Stephen / DiLegge, Daniel / Croy, Ben / Babcock, Britt et al. | 2020
- i
-
Front Matter| 2020