Effects of Ultraviolet (UV) and Thermal Cycling on Polyurethane (PUR) Coated Water Transmission Pipelines (Englisch)
- Neue Suche nach: Smith, S.
- Neue Suche nach: Caillouette, L.
- Neue Suche nach: Jourdan, J.
- Neue Suche nach: White, W.
- Neue Suche nach: Gust, K.
- Neue Suche nach: Phelps, D.
- Neue Suche nach: Smith, S.
- Neue Suche nach: Caillouette, L.
- Neue Suche nach: Jourdan, J.
- Neue Suche nach: White, W.
- Neue Suche nach: Gust, K.
- Neue Suche nach: Phelps, D.
In:
Pipelines 2015
: Recent Advances in Underground Pipeline Engineering and Construction
;
1677-1694
;
2015
-
ISBN:
- Aufsatz (Konferenz) / Elektronische Ressource
-
Titel:Effects of Ultraviolet (UV) and Thermal Cycling on Polyurethane (PUR) Coated Water Transmission Pipelines
-
Beteiligte:Smith, S. ( Autor:in ) / Caillouette, L. ( Autor:in ) / Jourdan, J. ( Autor:in ) / White, W. ( Autor:in ) / Gust, K. ( Autor:in ) / Phelps, D. ( Autor:in )
-
Kongress:Pipelines 2015 ; 2015 ; Baltimore, Maryland
-
Erschienen in:Pipelines 2015 : Recent Advances in Underground Pipeline Engineering and Construction ; 1677-1694
-
Verlag:
- Neue Suche nach: American Society of Civil Engineers
-
Erscheinungsort:Reston, VA
-
Erscheinungsdatum:17.08.2015
-
ISBN:
-
DOI:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Elektronische Ressource
-
Sprache:Englisch
-
Datenquelle:
Inhaltsverzeichnis Konferenzband
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
Sugarloaf Pipeline, Kp41 Tunnel—Design and ConstructionWeeks, Marcus et al. | 2015
- 15
-
Challenges and Rewards of a Successful Compound Curve Microtunnel DriveShearer, Dennis / Fowler, John / Anderson, Jeff et al. | 2015
- 23
-
Microtunneling Technology Implemented for the Replacement of an Aging One Mile PCCP 36-inch Force Main to Minimize Environmental ImpactsNotheis, M. / Schillo, B. et al. | 2015
- 35
-
Kaw WTP Water Transmission Main: Serving North Lawrence and BeyondHeidrick, Jeff / Ciesielski, Philip / O’Connell, Michael / Wilson, Shawn et al. | 2015
- 45
-
Permitting Requirements Drive Trenchless Design and Project Risk: An HDD Pressure Pipeline Case HistoryPrice, C. G. / Olson, M. P. / Staheli, J. E. et al. | 2015
- 56
-
HDD Utilized to Complete Key Crossings for Transmission Lines from New Woodbridge Energy CenterMurray, Scott / Dickes, Guy et al. | 2015
- 68
-
How to Manufacture an Endless Pipe OnsiteEhsani, Mo et al. | 2015
- 79
-
Hitting the Bulls-Eye: How to Cut-In a 108″ Outlet to a 108″ Vertical Shaft 230′ Beneath a LakeDavidenko, Glenn A. / Grazulis, Gedas et al. | 2015
- 91
-
Alternative Pipe Material Choice Provides Trenchless SolutionVandaelle, Craig / LeBlanc, Jeffrey et al. | 2015
- 99
-
Teamwork in Trenchless Projects: The Martha Lake Gateway ExperienceSchey, Eric / Nelson, Ben / Kucker, Michael / Pease, Matthew / Richart, Paul et al. | 2015
- 109
-
Experimental Examination of the Mathematical Model for Predicting the Borehole Pressure during Horizontal Directional DrillingYan, Xuanchen / Sayem, Sarkar / Allouche, Erez / Alam, Shaurav et al. | 2015
- 123
-
Victory Pipeline Duchesne County Utah Water Conservancy DistrictMickelsen, Ted / Langston, Dustin et al. | 2015
- 133
-
Big Pipe—Tight Quarters: Lessons Learned from Large Diameter Urban PipelinesHutson, Alan C. / Gibson, Russell L. / Barber, Jared et al. | 2015
- 145
-
Arching Effects in Box Jacking ProjectsMamaqani, Babak / Najafi, Mohammad et al. | 2015
- 154
-
Pipe Haunching Study Using Non-Linear Finite Element Analysis Including the Use of SoilcreteWebb, Mark C. et al. | 2015
- 171
-
Trenchless Rehabilitation Saves Grottoes, VA, Culverts—and Money—Without Disrupting TrafficShook, W. E. / Arold, R. M. / Shepherd, R. M. et al. | 2015
- 180
-
Trenchless Technologies Decision Support System Using Integrated Hierarchical Artificial Neural Networks and Genetic AlgorithmsFathy, Amr / Abu-Samra, Soliman / Elsheikha, Mohamed / Hosny, Ossama et al. | 2015
- 191
-
Water Pipeline from Turkey to Cyprus—1,600 mm Diameter Polyethylene 100 Pipeline and Its Flange-Technology SolutionDubocanin, Dragisa et al. | 2015
- 202
-
Make Way for Progress—The Challenges of Relocating Large Diameter Water Mains for Light Rail System ExpansionCard, Robert J. / Hook, David E. et al. | 2015
- 213
-
Under the River and through the Woods: Design and Construction of Two Large Diameter Horizontal Directional Drills for the City of Corpus ChristiCarrel, Anne / Cecil, Stephanie et al. | 2015
- 221
-
Lessons Learned from Horizontal Directional Drilling Installation of HDPE Sewer Forcemains in Anne Arundel County, MarylandHoward, James A. et al. | 2015
- 230
-
HDD River Crossing Improves Reliability of Water System and Meets Growing DemandSchuler, Chris / Gregor, John / Miller, Jeff et al. | 2015
- 238
-
Thermal Contraction Lesson Results in Steel Tunnel Liner DamageWilliams, B. Nash et al. | 2015
- 250
-
An Engineer’s Guide to Nondestructive Weld ExaminationTovey, Terri et al. | 2015
- 257
-
Streamlining the Submittal Process—Do’s and Don’tsBeieler, Roger / Roshak, Amie et al. | 2015
- 267
-
Liquefaction-Induced Differential Settlement and Resulting Loading and Structural Analysis of Buried Steel and Cast Iron PipelinesPrashar, Yogesh / Fallah, Annahita / McMullin, Roberts / Irias, Xavier et al. | 2015
- 279
-
Guidance from Tunnel Impact Analyses for DC Clean Rivers Project: Design Build Bidding to Protect Critical PipelinesJeyapalan, Jey K. / Bizzarri, Ronald B. / Murray, Bradley / Kottke, Peter / Test, Eileen et al. | 2015
- 291
-
Seismic Fragility Functions for Sewerage PipelinesLiu, M. / Giovinazzi, S. / Lee, P. et al. | 2015
- 304
-
Identifying Seismic Vulnerability Factors for Wastewater Pipelines after the Canterbury (NZ) Earthquake Sequence 2010–2011Giovinazzi, S. / Black, J. R. / Milke, M. / Esposito, S. / Brooks, K. A. / Craigie, E. K. / Liu, M. et al. | 2015
- 316
-
Shaking Table Test for Axial Behavior of Buried Inner Rehabilitated Pipes Affected by Aging Pipes in Liquefied GroundIzumi, A. / Ono, K. / Takahara, S. / Sawada, Y. / Ariyoshi, M. / Mohri, Y. / Kawabata, T. et al. | 2015
- 325
-
Design and Fabrication Requirements of a High-Pressure Steel PipelineBardakjian, Henry H. / Bush, Mark W. et al. | 2015
- 336
-
Analysis of a Steel Pipeline in a Seismically Active RegionZarghamee, Mehdi S. / Valentine, Daniel P. / Bush, Mark W. et al. | 2015
- 349
-
Analysis and Behavior of Steel Pipe Welded Lap Joints in Geohazard AreasKaramanos, Spyros A. / Koritsa, Evangelia / Keil, Brent / Card, Robert J. et al. | 2015
- 365
-
Performance of Polypropylene Corrugated Pipe in North AmericaKurdziel, John M. et al. | 2015
- 374
-
The Modified Use of the Rehabilitation of Water Mains Manual, AWWA M28 and ASTM F1216, to Design Large Diameter Pressure Pipes Using FRP SystemsWise, J. D. / Wagner, A. J. et al. | 2015
- 386
-
Why Design Engineers Do Not Follow AWWA M9 Chapter 9? Here Are Some Suggestions to Encourage Its UseJeyapalan, Jey K. et al. | 2015
- 400
-
2014 Updates to ASTM C12Boschert, Jeff / Howard, Amster et al. | 2015
- 412
-
Numerical Analysis of Pipe-in-Pipe Filled with Various MaterialsKanie, Shunji / Hayashi, Akihiro / Terada, Yutaka / Zheng, Hao et al. | 2015
- 424
-
Design and Construction Case History—South Catamount Transfer Pipeline Float-SinkBass, Bob / Link, Holly / Romer, Andrew E. / Weidmann, Theresa et al. | 2015
- 433
-
Improved Design and Constructability through Five Installation Methods for One HDPE Pipeline ProjectHaggen, Weston T. / Hansen, Drew M. / de Rubio, Ed Gil / Ambler, E. Alan et al. | 2015
- 445
-
CSO Projects—What Is the Right Solution? A Case Study for South Bend, IndianaMcCormack, Jordan C. / Boyles, Kara M. et al. | 2015
- 455
-
Deep Water Coastal Stormwater Outfalls: Designing for the Surf ZoneHancock, Dane R. / Sanford, Eric K. / Andrews, David B. et al. | 2015
- 466
-
Fast Track Relief to Midland’s Emergency ThirstSedbrook, John / Edwards, Zane / Edwards, Jay et al. | 2015
- 475
-
Share the Road: Challenges and Opportunities Facing Joint Pipeline and Roadway Construction ContractsCronin, Paige / Issa, Rami / Bhattarai, Rishi / Valerio, Eduardo et al. | 2015
- 486
-
Challenges Associated with the Implementation of the Carlsbad Desalination Conveyance SystemAdam, Jack / Crutchfield, Jeremy / Shoaf, Jeffrey A. et al. | 2015
- 498
-
New Day, New Conflict (The Challenges of Water/Wastewater Design for a Multi-Billion Dollar Highway Design-Build Project)Conine, Aaron / Opgenorth, Ryan / Stoutenburg, Daniel / McGee, Robert / Colter, H. Scott et al. | 2015
- 508
-
Ductile Iron or Welded Steel? A Comparative Analysis between Pipe Materials for the Replacement of a Large Diameter Transmission MainWimmer, M. M. et al. | 2015
- 518
-
C303—A Pipe Material in Search of a History and Searching for a NameRuchti, George F. / Card, Robert J. et al. | 2015
- 530
-
Exploring Use of Large-Diameter HDPE Pipe for Water Main ApplicationsNajafi, Mohammad / Habibian, Ahmad / Sever, V. Firat / Divyashree, D. / Jain, Abhay et al. | 2015
- 542
-
It’s a Blasting Good Time! Installation of a 30-inch HDPE Transmission Main in a Corrosive Environment, through Rock, under a River, and Adjacent to an Active Failing PipeDudley, Robert J. / Donnally, Susan S. / DiMarco, Paul S. et al. | 2015
- 553
-
Evaluation of Corrugated HDPE Pipes Manufactured with Recycled Content underneath RailroadsPluimer, Michael / McCarthy, Leslie / Welker, Andrea / Musselman, Eric et al. | 2015
- 564
-
Survey of Water Utilities on Their Experiences with Use of Large-Diameter HDPE Pipe for Water Main ApplicationsDivyashree, D. / Najafi, Mohammad / Sever, V. Firat / Entezarmahdi, Alimohammad et al. | 2015
- 574
-
Can a Design Engineer Rely on D/t Ratio as a Rational Indicator to Manage Stresses and Strains in Welded Steel Pipe During Handling?Shumaker, Stephen / Britto, Arul M. / Jeyapalan, Jey K. et al. | 2015
- 586
-
Stulling of Large Diameter Steel Water Pipe—What It Is and What It Is NotSwim, Larry / Kelemen, Neal / Keil, Brent / Mielke, Rich / Rahman, Shah et al. | 2015
- 594
-
Extremely Controlled Rock Blasting Near Critical Pipes Where Mechanical Excavation Is Not PracticalRevey, Gordon F. et al. | 2015
- 606
-
Completion and Startup of Utah Lake System PipelinesBreitenbach, Mark / Jones, Nathaniel / Murdock, Adam et al. | 2015
- 615
-
Compacting Pipeline Embedment Soils with Saturation and VibrationTurney, Matt S. / Howard, Amster / Bambei, John H. et al. | 2015
- 626
-
Sayreville Relief Force Main: 10 Years of Monitoring and Proactive ManagementPadewski, Edward A. / Tanzi, Donato J. / Castaldi, Geanine et al. | 2015
- 635
-
Incorporating GIS-Based Structural Evaluation Tools into Pipeline Asset ManagementNardini, Peter D. / Zarghamee, Mehdi S. / Bain, Lauren / Jalbert, Courtney / Remer, Angela et al. | 2015
- 646
-
Structural Integrity of Damaged Cast Iron Pipelines and Identifying When Damaged Pipes Should be Repaired or ReplacedAlavinasab, Ali / Hajali, Masood et al. | 2015
- 656
-
Water Resources Integration Program Update: Water Delivery and Operational Flexibility with a 60-inch, 45-mile PipelineAnderson, Erika “Rikki” / Reich, Sean et al. | 2015
- 664
-
Interconnections of the Lakeview Pipeline and Inland Feeder from Concept to Operation in 10 MonthsMcReynolds, Michael / Garabetian, Aida / Akhavan, Bahram et al. | 2015
- 674
-
Proposed Simplified Changes to ANSI/AWWA C304 Standard for Design of Prestressed Concrete Cylinder PipeRoller, J. J. / Lotfi, H. R. et al. | 2015
- 686
-
Cost Savings Using Optimization Methods for Water Conveyance Systems—Case Study for Recharge Fresno ProgramSmith, Jeff / Carbajal, Michael / Akel, Tony / Sellers, Matt et al. | 2015
- 698
-
Setting the Record Straight—ISO S4 Testing for AWWA C900 PipeMarti, Tom et al. | 2015
- 711
-
Development of a Testing Protocol for Fatigue Testing of Large Diameter HDPE PipesDivyashree, D. / Najafi, Mohammad / Sever, V. Firat / Entezarmahdi, Alimohammad et al. | 2015
- 722
-
Reduce Diameter, Increase Capacity!Sever, V. Firat / Schmitt, Jeremy / Mickley, Perry et al. | 2015
- 734
-
How to Estimate Flow Area Reduction and Excessive Roughness Effects in Aged PipelinesHasanabadi, B. / Junkert, J. J. et al. | 2015
- 744
-
Combating Subsidence by Delivering Surface Water to Three Million Water Users—The Successes and On-Going EffortsShumate, Charles / Gay, Melony et al. | 2015
- 756
-
Flow-Based Modeling for Enhancing Seismic Resilience of Water Supply NetworksFarahmandfar, Z. / Piratla, K. R. / Andrus, R. D. et al. | 2015
- 766
-
Benefits and Lessons Learned from Implementing Real-Time Water Modeling for Jacksonville Electric Authority and Western Virginia Water AuthoritySkeens, Brian / Ray, Rajan et al. | 2015
- 776
-
Development of a Wastewater Pipeline Performance Prediction ModelUslu, Berk / Sinha, Sunil K. / Graf, Walter L. / Angkasuwansiri, Thiti et al. | 2015
- 790
-
Pressure and Transient Monitoring of Water Transmission Pipelines and Wastewater Force MainsGresehover, Brian et al. | 2015
- 805
-
The Link between Transient Surges and Minimum Pressure Criterion in Water Distribution SystemsGhorbanian, V. / Karney, B. W. / Guo, Y. et al. | 2015
- 815
-
Metrics for the Rapid Assessment of Transient Severity in PipelinesKarney, B. / Malekpour, A. / Nault, J. et al. | 2015
- 825
-
Case Study: Hydraulic Modeling and Field Verification on the Rietspruit-Davel-Kriel Bulk Water Supply PipelinePrinsloo, Kobus / Xaba, Londiwe / van Vuuren, Stefanus J. / Jacobson, Mike et al. | 2015
- 837
-
Managing Liquid Transients and Vibration within Pump FacilitiesGrose, Jordan et al. | 2015
- 845
-
The Need for Holistic System-Wide Transient AssessmentEerkes, Eppo et al. | 2015
- 858
-
Modeling Halfway Around the World: Advanced Hydraulic Model Calibration for a Large UtilitySiemers-Kennedy, L. C. et al. | 2015
- 869
-
Analyzing Pump Energy through Hydraulic ModelingMiller, Ron / Liberi, Tracey / Scioscia, John et al. | 2015
- 878
-
Benefits of PACP® Version 7.0 Update NASSCODeBoda, Ted / Bayer, Jane et al. | 2015
- 887
-
The Condition Assessment of a 30-inch Ductile Iron Water Line by WaterOne of Johnson County, KansasPietig, Shaun et al. | 2015
- 900
-
Developing an Inline Pipe Wall Screening Tool for Assessing and Managing Metallic PipeStroebele, Allison / Wagner, Travis / Paulson, Peter O. et al. | 2015
- 911
-
Comprehensive Condition Assessment of Large Diameter Steel Pipe—The Next Chapter in San Diego County Water Authority’s Asset Management ProgramCoghill, Martin R. / Galleher, John J. / Kyea, Christopher et al. | 2015
- 923
-
The Case for Large Diameter Pipeline Condition AssessmentFaber, Nathan D. / Eaton, Gary A. et al. | 2015
- 931
-
Condition Assessment Methods for 1920s Lock-Bar Steel PipeCorrao, Andi / Briones, Brian / VanderSchaaf, Richard / Bermudo, Juan Elli et al. | 2015
- 943
-
A Look Back: Analyzing the Results of LWC’s PCCP Condition Assessment Pilot ProjectsWilliams, Andrew F. / Pike, Dennis / Gathof, Tony et al. | 2015
- 954
-
And the Kitchen Sink—Using a Full Toolbox to Assess a Critical Bulk Water Asset in South AfricaJacobson, Mike / Xaba, Londiwe / Prinsloo, Kobus et al. | 2015
- 966
-
Large Diameter Pipeline Asset Management for Sustaining Silicon Valley’s Water NeedsNdah, Tony T. / Crowley, James Stephen / Lau, Thomas / Mathews, Dave / Partridge, Arthur et al. | 2015
- 978
-
A Repair Program to Minimize Failure Risk of Highly Distressed PCCP Circulating Water LinesEngindeniz, Murat / Zarghamee, Mehdi / Crosby, Kevin / Cluff, Ben et al. | 2015
- 989
-
Condition Assessment of Sanitary Sewer Lines Using Acoustic InspectionSelembo, George / Howitt, Ivan et al. | 2015
- 1005
-
Development of Performance Index for Stormwater Pipeline InfrastructureSowmya, Bhimanadhuni / Sinha, Sunil K. et al. | 2015
- 1017
-
Protocol for Water Pipeline Failure and Forensic Data AnalysisSinha, Sunil / O’Dowd, Jim / Pfeifer, Fred / Graf, Walter / Misra, Sudhir et al. | 2015
- 1027
-
Condition Assessment of Aging, Hard to Access Sewer MainsDriscoll, Madeleine R. / Santino, Anna et al. | 2015
- 1036
-
Boston Water and Sewer Commission: Data Integration to Support Asset ManagementBerkeley, Chase / Jewell, Charlie / Peck, Jacob / Rowe, Reggie / von Zweck, Peter et al. | 2015
- 1047
-
Pipeline Asset Integration Planning for a Major Water Supply System: The Southern Delivery System, Colorado Springs, CODaniel, Jeff / Snow, J. Russell / Vogelsang, Derek / Slapper, Jeffrey et al. | 2015
- 1060
-
A Successful CCCP Rehabilitation on Two 96-inch CMP CulvertsNyirenda, Swirvine / Salazar, Steve / Sharman, Adam et al. | 2015
- 1070
-
New ASTM Standards to Encourage Wider Use of Laser Profilers and Video Micrometers in Post-Construction Inspection of PipelinesBennett, Neville / Gipson, Brian / Ellgass, Rudy / Jeyapalan, Jey K. / Katter, Robert / Bruce, Mark et al. | 2015
- 1081
-
Understanding the Benefits of Multi-Sensor InspectionGriffiths, Jeffrey et al. | 2015
- 1089
-
Looking Past the Pipe Wall: Quantifying Pipe Corrosion and Deterioration with Pipe Penetrating RadarÉkes, Csaba et al. | 2015
- 1100
-
Case Study from Application of High-Resolution Ultra-Wideband Radar for QC/QA Analysis of Trenchless Pipe Rehabilitation and Pipeline Condition AssessmentJaganathan, Arun / Yestrebsky, Tom / Winiewicz, Tony / Allouche, Erez / Simicevic, Neven et al. | 2015
- 1110
-
Drinking Water Pipelines Defect Coding SystemYounis, Rizwan / Knight, Mark / Kleiner, Yehuda / Matthews, John / Jung, Jai et al. | 2015
- 1125
-
Capital Planning for Shawnee County, Kansas, the Easy WayLorenzo, Michael F. / Ross, Jim / Vlach, Tom et al. | 2015
- 1138
-
Assessment of a Critical Raw Water Infrastructure for the City of San Diego El Monte Pipeline Inspection and Condition Assessment ProjectByrne, Kirstin / Cathcart, James / VanderSchaaf, Richard / Balotsky, Yana et al. | 2015
- 1150
-
Evaluation of Acoustic Wave Based PCCP Stiffness Testing ResultsOjdrovic, Rasko / Nardini, Peter D. / Bracken, Marc / Marciszewski, John et al. | 2015
- 1160
-
Alternative Construction Methods and Pipe Material Provide Solutions for Cleveland WWTP ProjectAshyk, Bernie / Lucie, Christopher / LeBlanc, Jeffrey et al. | 2015
- 1168
-
Padre Island Water Supply Project Minimizes Environmental Impact Using HDD TechnologyMcMullan, J. Douglas / Deng, Daniel / Williams, Jim et al. | 2015
- 1181
-
Water Mains Degradation Analysis Using Log-Linear ModelsGanjidoost, Amin / Younis, Rizwan / Knight, Mark et al. | 2015
- 1195
-
Rehabilitation and Replacement of the East Layton PipelineMurdock, Adam / Hamson, Judd / Rasmussen, Matt / Hess, Darren et al. | 2015
- 1207
-
Validating “Fully Structural”: Development and Testing of a New Carbon Composite in situ Pressure Barrier for Trenchless Rehabilitation of Small-Diameter Pressure PipelinesMeyer, N. / Arnold, Scott / Bontus, G. et al. | 2015
- 1217
-
Integrated Technology Applications for Effective Utility Infrastructure Asset ManagementApplegate, A. D. / Robinson, V. L. et al. | 2015
- 1227
-
Beyond Water Audits into Asset Management: The Process of Non-Revenue Water Reduction and Revenue Enhancement ActivitiesSkeens, Brian et al. | 2015
- 1237
-
Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPEGrafenauer, Todd / Hayes, Tom / Vanderwater, James / Kilambi, Madhu / Kasper, David et al. | 2015
- 1245
-
City of Baltimore SW Diversion 78-in. Diameter PCCP: 2,140 LF Continuous Carbon Fiber Pipe RehabilitationGabbitas, M. / Eysaman, K. / Pridmore, A. B. / Kiladis, J. / Hall, J. et al. | 2015
- 1257
-
Miami-Dade Implements Hybrid FRP Trenchless Repair SystemAguiar, Luis / Pridmore, Anna / Geraghty, Mark et al. | 2015
- 1268
-
Composite versus Stand-Alone Design Methodologies for Carbon Fiber Lining SystemsGipsov, Michael / Ojdrovic, Rasko / Pridmore, Anna et al. | 2015
- 1278
-
Better Data Equals Better Decisions: New Developments in Multi-Sensor Condition Assessment TechnologiesÉkes, Csaba et al. | 2015
- 1287
-
Application and Laboratory Tests of Stainless Steel Liner for Trenchless Rehabilitation of Water Mains in ChinaZhou, Wei / Ma, Baosong et al. | 2015
- 1296
-
Non-Invasive and Remote Pipeline Rehabilitation Technology Using Reactive and Magnetic ParticlesMakihata, M. / Eovino, B. / Jiang, X. / Toor, A. / Dorsey, K. L. / Pisano, A. P. et al. | 2015
- 1305
-
Engineering Rehabilitations Based on Non-Destructive ExaminationsEllison, Dan / Romer, Andy et al. | 2015
- 1318
-
Asset Management: Performance, Sustainability, and Resiliency Model DevelopmentThomasson, Richard O. / Sinha, Sunil K. et al. | 2015
- 1333
-
Finite Element Modeling of Full-Scale Concrete Manholes under Soil PressureRiahi, Elmira / Yu, Xinbao / Najafi, Mohammad / Sever, Firat et al. | 2015
- 1343
-
Comparative Analysis of Geopolymer Technology for Sewer System RehabilitationRoyer, J. R. / Koo, Dan D. et al. | 2015
- 1355
-
An Evaluation of Trenchless Point Repair Solutions for Pipes of Varying Inner Diameter and Offset JointsEllgass, Rudy / Jeyapalan, Jey K. / Gipson, Brian / Biesalski, Mark / Miles, Wayne / Leffler, Steve / Kurdziel, John / Bruce, Mark et al. | 2015
- 1367
-
Effective Repair of Incidental Construction Damage to 54-inch PCCP LinePridmore, A. B. / Bryant, L. / Le, J. et al. | 2015
- 1376
-
Repairing the World’s Largest Prestressed Concrete Pipe: A Case Study of the Central Arizona Project's Centennial Wash SiphonGeisbush, Jim et al. | 2015
- 1387
-
Motts Run Dam Outlet Rehabilitation—A Case Study Illustrating Design and Construction AspectsEdwards, Chris / Farooqi, Owais E. / Habibian, Ahmad et al. | 2015
- 1396
-
Design and Construction of a Raw River Water Welded Steel Transmission Main for a New Water Supply System in Northern VirginiaLaRocque, Eric J. et al. | 2015
- 1407
-
Lessons Learned in the Design, Manufacture, Shipping, and Installation of the 108-inch Integrated Pipeline (IPL) Section 15-1Card, Robert J. / Weaver, Ed / Payton, Randall / Mielke, Richard / Rahman, Shah et al. | 2015
- 1419
-
Steel Water Transmission Mains in Liquefiable Soils in Hillsboro, Oregon, Planning ConsiderationsMucibabic, Nebojsa “Nesh” / Lang, Yuxin “Wolfe” / Wubbena, Tyler et al. | 2015
- 1431
-
Addressing Rehabilitation Challenges for the Underwood Creek Force MainLivingston, Bryon / Clemmons, Jeremy / Kalinger, Keith et al. | 2015
- 1443
-
Decision-Making Guidance for Culvert Rehabilitation and Replacement Using Trenchless TechniquesJin, He / Piratla, Kalyan R. / Matthews, John C. et al. | 2015
- 1452
-
Hot Tapping and Plugging Procedures Enable Replacement of Concrete Pressure Pipelines Reaching the End of Service Life without Service InterruptionHerckis, Charles et al. | 2015
- 1461
-
Evaluating Chloramine Loss in Raw Water Supply PipelinesPope, P. Greg / Cullwell, Rob / Gehrig, Jason et al. | 2015
- 1470
-
Evaluating the Effectiveness of the Sewer Root Control Program for the City of BaltimoreDriscoll, M. / Calderon, D. / Harris, B. et al. | 2015
- 1478
-
Performing a Condition Assessment of a 24-inch Diameter Gas Line Supplying an Important Part of a Suburban Area of a Large Midwest CityHerckis, Charles et al. | 2015
- 1489
-
Influences on the Rate of Pressure Drop in Automatic Line Break Control Valves on a Natural Gas PipelineZuo, Lili / Jiang, Fangmei / Jin, Bin / Zhang, Liya / Xue, Ting et al. | 2015
- 1500
-
More Precise Hydro-Static Test Evaluation of High Pressure Petroleum Pipelines Using Automated Data Collection TechniquesVanderpool, David A. / Parmentier, Stephen J. et al. | 2015
- 1510
-
Maximum Transient Pressures in Batch Pipelines due to Valve ClosuresLi, Guohua et al. | 2015
- 1521
-
Electrochemical Impedance Spectroscopy: Characterizing the Performance of Corrosion Protective Pipeline CoatingsCroll, S. G. / Croes, K. J. / Keil, B. D. et al. | 2015
- 1533
-
Watertightness of CFRP Liners for Distressed PipesZarghamee, Mehdi S. / Engindeniz, Murat et al. | 2015
- 1544
-
Oil and Gas Pipeline Technology Finds Uses in the Water and Wastewater IndustryMcDonnell, Shamus / Onuoha, Chukwuma et al. | 2015
- 1554
-
Strategic Management of AC Pipe in Water SystemsSpencer, D. / Walis, M. / Irias, X. / Dodge, C. / Sakaji, R. / Bueno, R. / Ellison, D. / Bell, G. et al. | 2015
- 1566
-
Pipe Bursting Asbestos Cement Pipe: The Process Is Established but What’s NextAmbler, E. A. / Matthews, J. / Pultz, L. / Stowe, R. et al. | 2015
- 1577
-
Management of a Pipe of High Concern for Failure: Asbestos Cement PipesBlaha, F. / Zhang, J. et al. | 2015
- 1590
-
A Comparison Study of Water Pipe Failure Prediction Models Using Weibull Distribution and Binary Logistic RegressionVladeanu, Greta Julia / Koo, Dan D. et al. | 2015
- 1602
-
Where are the Hot Zones: Prioritization with Historical Pipe BreakZhao, Chongyang Kate / Daly, Craig et al. | 2015
- 1608
-
Minimizing the Risk of Catastrophic Failure of PCCP in the City of BaltimoreDriscoll, M. R. / Hussam, T. N. et al. | 2015
- 1620
-
Extending the Life of Existing Pipelines through the Use of a Retrofit Cathodic Protection and Internal Lining ProgramSmith, John O. / Van der Walt, Gert / Fuller, Andrew et al. | 2015
- 1630
-
Evaluating Remaining Strength of Thinning and Weakening Lined Cylinder PCCP Force Mains due to Hydrogen Sulfide CorrosionHajali, Masood / Alavinasab, Ali et al. | 2015
- 1642
-
Pipelines at Bridge Crossings: Empirical-Based Seismic Vulnerability IndexRais, A. / Giovinazzi, S. / Palermo, A. et al. | 2015
- 1655
-
Benefits of Global Standards on the Use of Optical Fiber Sensing Systems for the Impact of Construction of New Utilities and Tunnels on Existing UtilitiesIten, Michael / Spera, Zachary / Jeyapalan, Jey K. / Duckworth, Gregory / Inaudi, Daniele / Bao, Xiaoyi / Noether, Nils / Klar, Assaf / Marshall, Alec / Glisic, Branko et al. | 2015
- 1667
-
Integrated Fiber Optic Sensing System for Pipeline Corrosion MonitoringHuang, Ying / Liang, Xiao / Galedar, Sahar Abualigaledari / Azarmi, Fardad et al. | 2015
- 1677
-
Effects of Ultraviolet (UV) and Thermal Cycling on Polyurethane (PUR) Coated Water Transmission PipelinesSmith, S. / Caillouette, L. / Jourdan, J. / White, W. / Gust, K. / Phelps, D. et al. | 2015
- 1695
-
Development of Constrained Soil Modulus Values for Buried Pipe DesignWebb, Mark C. et al. | 2015
- 1711
-
The Value of Value Engineering—Functionality without Breaking the Bank on a Raw Water Transmission Project in TexasGaughan, Matt / Murphy, Janis / Wallace, William L. / Weaver, Ed et al. | 2015
- 1723
-
Triple Bottom-Line Assessment of Alternatives for a Large-Diameter Transmission Main from a Congested 280-MGD Water Treatment Plant SiteWelter, Gregory / Fashokun, Adebola / Six, Kim / Dudley, Bob / Venkatesan, Narayan / Jennings, Jason et al. | 2015
- 1730
-
Value Engineering of Conveyance System Projects on a Large Wet Weather ProgramBaldwin, Jennifer D. / Layrisson, Heather S. / Smith, Adam M. et al. | 2015
- 1740
-
Tools for Successful Risk Management of Your Next Underground ProjectKramer, Steven R. et al. | 2015
- 1750
-
Assessing the Condition and Consequence of Failure of Pipes Crossing Major Transportation CorridorsHess, Jeremiah et al. | 2015
- 1762
-
Risk Model for Large-Diameter Transmission Pipeline Replacement ProgramMoughamian, Raffi / McLeod, Marshall et al. | 2015
- 1772
-
Understanding Risk and Resilience to Better Manage Water Transmission SystemsKerr, David J. / Singh, Amanvir / Motala, Imran et al. | 2015
- 1786
-
Shifting the Paradigm from Replacement to ManagementSteffens, J. / Lamica, J. et al. | 2015
- 1797
-
Baltimore’s First Step towards Advanced Pipeline ManagementBall, Brian P. / Driscoll, Madeleine / Mazurek, Michael et al. | 2015
- 1809
-
Driving the Industry Forward Again: WSSC’s Pipeline Management SystemFick, Gregory / Woodcock, Mike / Tak, Muhammad / Rodriguez, Jorge et al. | 2015
- 1817
-
Asset Management Mixing Bowl: Idea Sharing Amongst OwnersDonnally, Susan S. / DiMarco, Paul S. et al. | 2015
- 1825
-
Smart Pipeline Infrastructure Network for Energy and Water (SPINE)Sinha, Sunil / Singh, Preet / Oppenhiem, Irving / Iseley, David / Khademian, Anne / Edwards, Marc / Perdomo, Jose / Graf, Walter et al. | 2015
- 1835
-
Developing Design Standards for a New Multi-Agency Regional Water Supply SystemDuffy, Matthew / Britch, Mike / Wubbena, Tyler / Plattsmier, John R. et al. | 2015
- 1844
-
What Pipeline Management Can Do for You—A Review of the Costs and BenefitsWagner, Travis / Culbertson, Erin et al. | 2015
- 1857
-
Developing a Pre-Certification Process for Using ISI Envision during the Planning Phase of a Pipeline ProjectFuchs, Jeffrey / Perimon, Todd / Iverson, Niki / Igloria, Ronan / Bennett, Joelle L. et al. | 2015
- 1868
-
Picking a Pipeline Route through a Densely Developed Urban Environment: The Challenges Are Not TechnicalBennett, Joelle L. / Britch, Mike / Wubbena, Tyler / Plattsmier, John R. et al. | 2015
- 1879
-
DC Water Uses 3D FEM in Assessing Century Old Trunk SewerBian, Steve / Soni, Satish et al. | 2015
- 1890
-
Wilburton Sewer Improvements—No Problems, Just Opportunities to Provide a Toolbox of Engineering SolutionsChae, James / Cole, Brandon / Finley, Josh et al. | 2015
- 1901
-
Potts Ditch: Rerouting the ImpossibleUrban, Derek C. / Grinstead, Joseph W. / Vincent, Karla D. et al. | 2015
- i
-
Front Matter| 2015