Low-cost aerial unit for outdoor inspection of building façades (Englisch)
- Neue Suche nach: Roca, D.
- Neue Suche nach: Lagüela, S.
- Neue Suche nach: Díaz-Vilariño, L.
- Neue Suche nach: Armesto, J.
- Neue Suche nach: Arias, P.
- Neue Suche nach: Roca, D.
- Neue Suche nach: Lagüela, S.
- Neue Suche nach: Díaz-Vilariño, L.
- Neue Suche nach: Armesto, J.
- Neue Suche nach: Arias, P.
In:
Automation in Construction
;
36
;
128-135
;
2013
-
ISSN:
- Aufsatz (Zeitschrift) / Elektronische Ressource
-
Titel:Low-cost aerial unit for outdoor inspection of building façades
-
Beteiligte:Roca, D. ( Autor:in ) / Lagüela, S. ( Autor:in ) / Díaz-Vilariño, L. ( Autor:in ) / Armesto, J. ( Autor:in ) / Arias, P. ( Autor:in )
-
Erschienen in:Automation in Construction ; 36 ; 128-135
-
Verlag:
- Neue Suche nach: Elsevier B.V.
-
Erscheinungsdatum:31.08.2013
-
Format / Umfang:8 pages
-
ISSN:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Elektronische Ressource
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis – Band 36
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
Real-time drill monitoring and control using building information models augmented with 3D imaging dataAkula, Manu / Lipman, Robert R. / Franaszek, Marek / Saidi, Kamel S. / Cheok, Geraldine S. / Kamat, Vineet R. et al. | 2013
- 16
-
Modeling relational transaction and relationship quality among team members in public projects in Hong KongLing, Florence Y.Y. / Ning, Yan / Ke, Yongjian / Kumaraswamy, Mohan M. et al. | 2013
- 25
-
Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of thingsDing, L.Y. / Zhou, C. / Deng, Q.X. / Luo, H.B. / Ye, X.W. / Ni, Y.Q. / Guo, P. et al. | 2013
- 38
-
Mobile passive Radio Frequency Identification (RFID) portal for automated and rapid control of Personal Protective Equipment (PPE) on construction sitesKelm, Agnes / Laußat, Lars / Meins-Becker, Anica / Platz, Daniel / Khazaee, Mohammad J. / Costin, Aaron M. / Helmus, Manfred / Teizer, Jochen et al. | 2013
- 53
-
Use-phase memory: A tool for the sustainable construction and renovation of residential buildingsPicon, Lucile / Yannou, Bernard / Zaraket, Toufic / Minel, Stéphanie / Bertoluci, Gwenola / Cluzel, François / Farel, Romain et al. | 2013
- 71
-
Performance of global optimization models for dynamic site layout planning of construction projectsSaid, Hisham / El-Rayes, Khaled et al. | 2013
- 79
-
Maintaining style of garden designs by using graph-based constraintsŚlusarczyk, G. / Piȩtak, P. et al. | 2013
- 95
-
Computing 3D blind spots of construction equipment: Implementation and evaluation of an automated measurement and visualization method utilizing range point cloud dataRay, Soumitry J. / Teizer, Jochen et al. | 2013
- 108
-
Automated progress control using laser scanning technologyZhang, Chengyi / Arditi, David et al. | 2013
- 117
-
Evaluation of user interaction with daylighting simulation in a tangible user interfaceNasman, Joshua / Cutler, Barbara et al. | 2013
- 128
-
Low-cost aerial unit for outdoor inspection of building façadesRoca, D. / Lagüela, S. / Díaz-Vilariño, L. / Armesto, J. / Arias, P. et al. | 2013
- 128
-
Low-cost aerial unit for outdoor inspection of building facadesRoca, D. / Laguela, S. / Diaz-Vilarino, L. / Armesto, J. / Arias, P. et al. | 2013
- 136
-
Numerical modeling of concrete strength under multiaxial confinement pressures using linear genetic programmingBabanajad, Saeed K. / Gandomi, Amir H. / Mohammadzadeh S., Danial / Alavi, Amir H. et al. | 2013
- 145
-
BIM implementation throughout the UK construction project lifecycle: An analysisEadie, Robert / Browne, Mike / Odeyinka, Henry / McKeown, Clare / McNiff, Sean et al. | 2013
- 152
-
Designing adapted visualization for collaborative 4D applicationsBoton, Conrad / Kubicki, Sylvain / Halin, Gilles et al. | 2013
- 168
-
Extending automation of building construction — Survey on potential sensor technologies and robotic applicationsVähä, Pentti / Heikkilä, Tapio / Kilpeläinen, Pekka / Järviluoma, Markku / Gambao, Ernesto et al. | 2013
- 179
-
Creative constructionJane et al. | 2013
- 180
-
Enhanced function modeling for early assessment of conceptual innovative construction technologiesYu, Wen-der / Wu, Chih-ming / Cheng, Shao-tsai / Chen, Tai-shiuh et al. | 2013
- 191
-
Prediction of the learning curve in roof insulationMályusz, Levente / Pém, Attila et al. | 2013
- 196
-
Computer simulation and analysis framework for floating caisson construction operationsPantouvakis, John-Paris / Panas, Antonios et al. | 2013
- 208
-
PSO-based Elman neural network model for predictive control of air chamber pressure in slurry shield tunneling under Yangtze RiverZhou, C. / Ding, L.Y. / He, R. et al. | 2013
- IFC
-
Editorial Board| 2013