A dynamic calculation model of the carbon footprint in the life cycle of hospital building: a case study in China (Englisch)
- Neue Suche nach: Yue, Jianjin
- Neue Suche nach: Li, Wenrui
- Neue Suche nach: Cheng, Jian
- Neue Suche nach: Xiong, Hongxing
- Neue Suche nach: Xue, Yu
- Neue Suche nach: Deng, Xiang
- Neue Suche nach: Zheng, Tinghui
- Neue Suche nach: Yue, Jianjin
- Neue Suche nach: Li, Wenrui
- Neue Suche nach: Cheng, Jian
- Neue Suche nach: Xiong, Hongxing
- Neue Suche nach: Xue, Yu
- Neue Suche nach: Deng, Xiang
- Neue Suche nach: Zheng, Tinghui
In:
Engineering, Construction and Architectural Management
;
30
, 10
;
4735-4761
;
2023
-
ISSN:
- Aufsatz (Zeitschrift) / Elektronische Ressource
-
Titel:A dynamic calculation model of the carbon footprint in the life cycle of hospital building: a case study in China
-
Weitere Titelangaben:A dynamic calculation model of the CFP
-
Beteiligte:Yue, Jianjin ( Autor:in ) / Li, Wenrui ( Autor:in ) / Cheng, Jian ( Autor:in ) / Xiong, Hongxing ( Autor:in ) / Xue, Yu ( Autor:in ) / Deng, Xiang ( Autor:in ) / Zheng, Tinghui ( Autor:in )
-
Erschienen in:Engineering, Construction and Architectural Management ; 30, 10 ; 4735-4761
-
Verlag:
- Neue Suche nach: Emerald Publishing Limited
-
Erscheinungsdatum:28.11.2023
-
Format / Umfang:27 pages
-
ISSN:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Elektronische Ressource
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis – Band 30, Ausgabe 10
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 4541
-
Dynamic network analysis of stakeholder-associated social risks of megaprojects: a case study in ChinaXia, Xin / Xiang, Pengcheng et al. | 2023
- 4569
-
How A/E/C professionals accept BIM technologies in China: a technology acceptance model perspectiveZhao, Yiwei / Sun, Yindong / Zhou, Qianqian / Cui, Caiyun / Liu, Yong et al. | 2023
- 4590
-
Factors affecting organizational resilience in megaprojects: a leader–employee perspectiveWang, Dedong / Zhao, Xiaoru / Zhang, Kangning et al. | 2023
- 4609
-
Analysis on risk factors related delay in PCPsZhao, Ying / Chen, Wei / Yang, Zhuzhang / Li, Zongliang / Wang, Yong et al. | 2023
- 4645
-
A data model for integrating BIM and blockchain to enable a single source of truth for the construction supply chain data deliveryHijazi, Amer A. / Perera, Srinath / Calheiros, Rodrigo N. / Alashwal, Ali et al. | 2023
- 4665
-
Paving the way for industry 4.0 maturity of construction enterprises: a state of the art reviewDas, Priyadarshini / Perera, Srinath / Senaratne, Sepani / Osei-Kyei, Robert et al. | 2023
- 4695
-
Selecting control strategies in projects of intangible outputs: empirical evidence from architectural and engineering design projectsNing, Yan / Ling, Florence Yean Yng et al. | 2023
- 4715
-
A framework for continuation of digitalization in construction: a PLS-SEM approachBajpai, Avirag / Misra, Subhas C. et al. | 2023
- 4735
-
A dynamic calculation model of the carbon footprint in the life cycle of hospital building: a case study in ChinaYue, Jianjin / Li, Wenrui / Cheng, Jian / Xiong, Hongxing / Xue, Yu / Deng, Xiang / Zheng, Tinghui et al. | 2023
- 4762
-
Client and contractor perspectives on attributes affecting construction quality in a war-affected regionZaray, Abdul Habib / Hasan, Abid / Johari, Sparsh / Hashmat, Parvez Ahmad / Jha, Kumar Neeraj et al. | 2023
- 4782
-
A structural equation model to assess the effects of strategic and project related potential risks on project delivery in QatarGunduz, Murat / Abumoza, Abdulla M. / Aly, Aly Abdelfattah et al. | 2023
- 4821
-
How resilient safety culture correct unsafe behavior of new generation of construction workers: the mediating effects of job crafting and perceived work meaningfulnessNi, Guodong / Zhang, Qi / Fang, Yaqi / Zhang, Ziyao / Qiao, Yaning / Wang, Wenshun / Deng, Yongliang et al. | 2023
- 4846
-
Modern tendency of development of architectural typology on the example of micro-apartment for Almaty cityKaratseyeva, Tatsiana / Akhmedova, Aizhan et al. | 2023
- 4867
-
Effectiveness of peer support to reduce depression, anxiety and stress among migrant construction workers in SingaporePalaniappan, Kavitha / Rajaraman, Natarajan / Ghosh, Santu et al. | 2023
- 4881
-
Evaluation and decision-making framework for concrete surface quality based on computer vision and ontologyChai, Ying Tao / Wang, Ting-Kwei et al. | 2023
- 4914
-
Combining transaction characteristics and governance mechanisms to suppress opportunism in construction projects: qualitative comparative analysisGuo, Wenqian / Lu, Wenxue / Kang, Fei et al. | 2023
- 4933
-
Ranked generic criteria for EPC contractor selectionDissanayake, Nayana / Xia, Bo / Skitmore, Martin / Trigunarsyah, Bambang / Menadue, Vanessa et al. | 2023
- 4955
-
Effect of network position on inter-team conflict and project success in megaprojectsLiu, Cong / Cao, Jiming / Duan, Kaifeng / Wu, Guangdong et al. | 2023
- 4978
-
Understanding adoption of high off-site construction level technologies in construction based on the TAM and TTFCai, Jin / Li, Zhongfu / Dou, Yudan / Li, Tianxin / Yuan, Mengqi et al. | 2023
- 5007
-
Enhancing project stakeholder communication under insufficient knowledge of project management conceptsZwikael, Ofer / Salmona, Michelle / Meredith, Jack / Zarghami, Seyed Ashkan et al. | 2023
- 5030
-
Workers' relational identification with supervisors influences safety behaviour in construction projectsAshraf, Hassan / Ali, Alishbah / Sunindijo, Riza Yosia / Maqsoom, Ahsen / Memon, Shoeb Ahmed / Hassan, Muhammad Usman et al. | 2023
- 5052
-
A model-based smart contracts system via blockchain technology to reduce delays and conflicts in construction management processesWahab, Abdul / Wang, Jun / Shojaei, Alireza / Ma, Junfeng et al. | 2023
- 5073
-
Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: a developer satisfaction perspectiveCai, Jin / Li, Zhongfu / Dou, Yudan / Teng, Yue / Yuan, Mengqi et al. | 2023
- 5109
-
An association rule mining model for evaluating the potential correlation of construction cross operation riskChen, Qianqian / Tian, Zhen / Lei, Tian / Huang, Shenghan et al. | 2023
- 5133
-
Modeling the influence patterns of barriers to electronic procurement technology usage in construction projectsYevu, Sitsofe Kwame / Yu, Ann Tit Wan / Darko, Amos / Nani, Gabriel / Edwards, David J. et al. | 2023
- 5160
-
An overall review of research on prefabricated construction supply chain managementHan, Yanhu / Yan, Xiyu / Piroozfar, Poorang et al. | 2023
- 5196
-
Interactions among antecedents of project outsourcing strategies: evidence from Chinese construction firmsLai, Jingyi / Fu, Yongcheng / Chen, Yongqiang / Du, Bo et al. | 2023
- 5217
-
Development of zero-based budgeting approach for multinational construction contractorsKazar, Gokhan / Mutlu, Ugur / Tokdemir, Onur Behzat et al. | 2023
- 5233
-
Assessing the interactive effects of the ethics of construction professionals on project performance in the Ghanaian construction industryKuoribo, Ewald / Yomoah, Roland / Owusu-Manu, De-Graft / Acheampong, Alex / John Edwards, David / Debrah, Caleb et al. | 2023
- 5253
-
Automatic generation of BIM-based construction schedule: combining an ontology constraint rule and a genetic algorithmWu, Zhijiang / Ma, Guofeng et al. | 2023
- 5280
-
Coupling coordination degree spatiotemporal characteristics and driving factors between new urbanization and construction industry: evidence from ChinaMa, Shengbin / Li, Zhongfu / Li, Long / Yuan, Mengqi et al. | 2023
- 5302
-
An approach for monitoring prefabricated building construction based on feature extraction and point cloud segmentationXu, Zhao / Liang, Yangze / Lu, Hongyu / Kong, Wenshuo / Wu, Gang et al. | 2023