Teaching BIM as a collaborative information management process through a continuous improvement assessment lens: a case study (Englisch)
- Neue Suche nach: Nikolic, Dragana
- Neue Suche nach: Castronovo, Fadi
- Neue Suche nach: Leicht, Robert
- Weitere Informationen zu Leicht, Robert:
-
https://orcid.org/0000-0001-6705-8141
- Neue Suche nach: Nikolic, Dragana
- Neue Suche nach: Castronovo, Fadi
- Neue Suche nach: Leicht, Robert
- Weitere Informationen zu Leicht, Robert:
-
https://orcid.org/0000-0001-6705-8141
In:
Engineering, Construction and Architectural Management
;
28
, 8
;
2248-2269
;
2021
-
ISSN:
- Aufsatz (Zeitschrift) / Elektronische Ressource
-
Titel:Teaching BIM as a collaborative information management process through a continuous improvement assessment lens: a case study
-
Weitere Titelangaben:A study on teaching BIM as a process
-
Beteiligte:
-
Erschienen in:Engineering, Construction and Architectural Management ; 28, 8 ; 2248-2269
-
Verlag:
- Neue Suche nach: Emerald Publishing Limited
-
Erscheinungsdatum:21.06.2021
-
Format / Umfang:22 pages
-
ISSN:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Elektronische Ressource
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis – Band 28, Ausgabe 8
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 2065
-
EditorialFormoso, Carlos T. / Sacks, Rafael et al. | 2021
- 2069
-
Profit distribution of IPD projects using fuzzy allianceGuo, Shuwen / Wang, Junwu / Wu, Han et al. | 2021
- 2090
-
Method for managing requirements in healthcare projects using building information modellingBaldauf, Juliana Parise / Formoso, Carlos Torres / Tzortzopoulos, Patricia et al. | 2021
- 2119
-
The application of simulation in lean production research: a critical review and future directionsShou, Wenchi / Wang, Jun / Wu, Peng et al. | 2021
- 2155
-
A BIM-lean framework for digitalisation of premanufacturing phases in offsite constructionBarkokebas, Beda / Khalife, Salam / Al-Hussein, Mohamed / Hamzeh, Farook et al. | 2021
- 2176
-
Quantitative assessment of the impacts of BIM and lean on process and operations flow in construction projectsMaraqa, Musab Jamal / Sacks, Rafael / Spatari, Sabrina et al. | 2021
- 2199
-
Transformation of construction project management toward situational awarenessLappalainen, Eelon Mikael / Seppänen, Olli / Peltokorpi, Antti / Singh, Vishal et al. | 2021
- 2222
-
Increasing production efficiency through the reduction of transportation activities and time using 4D BIM simulationsPérez, Cristina Toca / Bastos Costa, Dayana et al. | 2021
- 2248
-
Teaching BIM as a collaborative information management process through a continuous improvement assessment lens: a case studyNikolic, Dragana / Castronovo, Fadi / Leicht, Robert et al. | 2021