Barriers to adoption of RPAs on construction projects: a task–technology fit perspective (Englisch)
- Neue Suche nach: Golizadeh, Hamed
- Neue Suche nach: Hosseini, M. Reza
- Neue Suche nach: Edwards, David John
- Neue Suche nach: Abrishami, Sepehr
- Neue Suche nach: Taghavi, Nasrin
- Neue Suche nach: Banihashemi, Saeed
- Neue Suche nach: Golizadeh, Hamed
- Neue Suche nach: Hosseini, M. Reza
- Neue Suche nach: Edwards, David John
- Neue Suche nach: Abrishami, Sepehr
- Neue Suche nach: Taghavi, Nasrin
- Neue Suche nach: Banihashemi, Saeed
In:
Construction Innovation
;
19
, 2
;
149-169
;
2019
-
ISSN:
- Aufsatz (Zeitschrift) / Elektronische Ressource
-
Titel:Barriers to adoption of RPAs on construction projects: a task–technology fit perspective
-
Beteiligte:Golizadeh, Hamed ( Autor:in ) / Hosseini, M. Reza ( Autor:in ) / Edwards, David John ( Autor:in ) / Abrishami, Sepehr ( Autor:in ) / Taghavi, Nasrin ( Autor:in ) / Banihashemi, Saeed ( Autor:in )
-
Erschienen in:Construction Innovation ; 19, 2 ; 149-169
-
Verlag:
- Neue Suche nach: Emerald Publishing Limited
-
Erscheinungsdatum:09.04.2019
-
Format / Umfang:1 pages
-
ISSN:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Elektronische Ressource
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis – Band 19, Ausgabe 2
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 126
-
A dual-functional social innovation process model for low-cost houses through university-enabled initiativeBelayutham, Sheila / Che Ibrahim, Che Khairil Izam / Zulkifli, Assrul Reedza / Ibrahim, Norhati et al. | 2019
- 149
-
Barriers to adoption of RPAs on construction projects: a task–technology fit perspectiveGolizadeh, Hamed / Hosseini, M. Reza / Edwards, David John / Abrishami, Sepehr / Taghavi, Nasrin / Banihashemi, Saeed et al. | 2019
- 170
-
Building information modelling (BIM) capability and delivery success on construction projectsMahamadu, Abdul-Majeed / Mahdjoubi, Lamine / Booth, Colin / Manu, Patrick / Manu, Emmanuel et al. | 2019
- 193
-
Projecting at the project level: MMC supply chain integration roadmap for small housebuildersDowsett, Ruth / Green, Martin / Sexton, Martin / Harty, Chris et al. | 2019
- 212
-
Do firm-level barriers to construction product innovation adoption vary according to position in the supply chain?Rose, Timothy / Manley, Karen / Widen, Kristian et al. | 2019
- 236
-
Integrated design experiences for energy-efficient housing in ChileEcheverria-Valiente, Ernesto / Garcia-Alvarado, Rodrigo / Celis-D’Amico, Flavio / Saelzer-Fuica, Gerardo et al. | 2019
- 256
-
Owner and contractor solution strategies for industrial commissioningMock, Brant / O’Connor, James T. et al. | 2019
- 280
-
BIM-based draft schedule generation in reinforced concrete-framed buildingsWang, Ziwei / Rezazadeh Azar, Ehsan et al. | 2019