A Pareto-Archived Estimation-of-Distribution Algorithm for Multiobjective Resource-Constrained Project Scheduling Problem (Englisch)
- Neue Suche nach: Wang, Ling
- Neue Suche nach: Fang, Chen
- Neue Suche nach: Mu, Chun-Di
- Neue Suche nach: Liu, Min
- Neue Suche nach: Wang, Ling
- Neue Suche nach: Fang, Chen
- Neue Suche nach: Mu, Chun-Di
- Neue Suche nach: Liu, Min
In:
IEEE Transactions on Engineering Management
;
60
, 3
;
617-626
;
2013
- Aufsatz (Zeitschrift) / Elektronische Ressource
-
Titel:A Pareto-Archived Estimation-of-Distribution Algorithm for Multiobjective Resource-Constrained Project Scheduling Problem
-
Beteiligte:Wang, Ling ( Autor:in ) / Fang, Chen ( Autor:in ) / Mu, Chun-Di ( Autor:in ) / Liu, Min ( Autor:in )
-
Erschienen in:IEEE Transactions on Engineering Management ; 60, 3 ; 617-626
-
Verlag:
- Neue Suche nach: IEEE
-
Erscheinungsdatum:01.08.2013
-
Format / Umfang:852603 byte
-
ISSN:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Elektronische Ressource
-
Sprache:Englisch
-
Datenquelle:
Inhaltsverzeichnis – Band 60, Ausgabe 3
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 453
-
Editorial for August 2013 IssueSabherwal, Rajiv et al. | 2013
- 457
-
The Impact of Network Ties and Resource Input on Research Performance: An Empirical Investigation Among Surgeons in Academic Medical CentersSchultz, Carsten / Schreyogg, Jonas et al. | 2013
- 468
-
Bridging the Gap Between Manufacturing and Service Through IT-Based Boundary ObjectsBecker, Jorg / Beverungen, Daniel / Knackstedt, Ralf / Matzner, Martin / Muller, Oliver / PoppelbuB, Jens et al. | 2013
- 483
-
Exploring SME Perceptions of Sustainable Product Service SystemsHernandez-Pardo, Ricardo J. / Bhamra, Tracy / Bhamra, Ran et al. | 2013
- 496
-
Capturing and Tracking Performance of Patent Portfolio Using Formula Not Shown -Complement Area CentroidKuan, C. H. / Huang, M. H. / Chen, D. Z. et al. | 2013
- 496
-
Capturing and Tracking Performance of Patent Portfolio Using $h$ -Complement Area CentroidKuan, Chung-Huei / Huang, Mu-Hsuan / Chen, Dar-Zen et al. | 2013
- 506
-
A Multidimensional Analysis of Project Manager CompetencesChipulu, Maxwell / Neoh, Jun Guan / Ojiako, Udechukwu / Williams, Terry et al. | 2013
- 518
-
Improving Project Management Decision Making by Modeling Quality, Time, and Cost ContinuouslyLiberatore, Matthew J. / Pollack-Johnson, Bruce et al. | 2013
- 529
-
Contextual Determinants of Ambidextrous Learning: Evidence From Industrial Firms in Four Industrialized CountriesLee, Cheng-Yu / Wu, Hsueh-Liang / Liu, Chia-Yi et al. | 2013
- 541
-
Test and Evaluation Resource Allocation Using Uncertainty ReductionBjorkman, Eileen A. / Sarkani, Shahram / Mazzuchi, Thomas A. et al. | 2013
- 552
-
Improving Product Development Performance Through Iteration Front-LoadingMartinez Leon, Hilda C. / Farris, Jennifer A. / Letens, Geert et al. | 2013
- 566
-
Managing the Social Trajectory: A Practice Perspective on Project ManagementOLeary, Tim / Williams, Terry et al. | 2013
- 581
-
Strategic Pricing and Production Planning Using a Stackelberg Differential Game With Unknown Demand ParametersFan, Lifan / Friesz, Terry L. / Yao, Tao / Chen, Xu et al. | 2013
- 592
-
Joint Effect of Team Structure and Software Architecture in Open Source Software DevelopmentNan, Ning / Kumar, Sanjeev et al. | 2013
- 604
-
Optimal Information Production in Product Development Environments: A Model With SimulationsGhosh, Jaideep et al. | 2013
- 617
-
A Pareto-Archived Estimation-of-Distribution Algorithm for Multiobjective Resource-Constrained Project Scheduling ProblemWang, Ling / Fang, Chen / Mu, Chun-Di / Liu, Min et al. | 2013
- 627
-
An Integrated Framework for Risk Response Planning Under Resource Constraints in Large Engineering ProjectsFang, Chao / Marle, Franck / Xie, Min / Zio, Enrico et al. | 2013
- 640
-
A Multiobjective Distribution-Pricing Model for Multiperiod Price-Sensitive DemandsKarimi-Nasab, M. / Dowlatshahi, S. / Heidari, H. et al. | 2013
- 655
-
Forthcoming engineering management related conferences| 2013
- 656
-
Journal Subscription Information| 2013
- 657
-
Papers to be Published in Future Issues of IEEE Transactions on Engineering Management| 2013
- 659
-
August 2013 IEEE Transactions on Engineering Management Readership survey| 2013
- C1
-
Table of contents| 2013
- C2
-
IEEE Transactions on Engineering Management publication information| 2013
- C3
-
IEEE Engineering Management Society Information| 2013