Quantifying the benefits of a long‐lead ENSO prediction model to enhance harvest management—A case study for the Herbert sugarcane growing region, Australia (Englisch)
- Neue Suche nach: Everingham, Yvette L.
- Neue Suche nach: Everingham, Yvette L.
- Neue Suche nach: Stoeckl, Natalie E.
- Neue Suche nach: Cusack, Justin
- Neue Suche nach: Osborne, John A.
In:
International journal of climatology
;
32
, 7
; 1069-1077
;
2012
-
ISSN:
- Aufsatz (Zeitschrift) / Print
-
Titel:Quantifying the benefits of a long‐lead ENSO prediction model to enhance harvest management—A case study for the Herbert sugarcane growing region, Australia
-
Beteiligte:
-
Erschienen in:International journal of climatology ; 32, 7 ; 1069-1077
-
Verlag:
- Neue Suche nach: Wiley
-
Erscheinungsort:Chichester [u.a.]
-
Erscheinungsdatum:2012
-
ISSN:
-
ZDBID:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Print
-
Sprache:Englisch
- Neue Suche nach: 38.82
- Weitere Informationen zu Basisklassifikation
-
Schlagwörter:
-
Klassifikation:
BKL: 38.82 Klimatologie -
Datenquelle:
Inhaltsverzeichnis – Band 32, Ausgabe 7
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 975
-
How do Himalayan areas respond to global warming?Diodato, Nazzareno / Bellocchi, Gianni / Tartari, Gianni et al. | 2012
- 983
-
Four‐dimensional structures and physical process of the decadal abrupt changes of the northern extratropical ocean–atmosphere system in the 1980sXiao, Dong / Li, Jianping / Zhao, Ping et al. | 2012
- 995
-
A possible cause of decreasing summer rainfall in northeast AustraliaLi, Jianping / Feng, Juan / Li, Yun et al. | 2012
- 1006
-
Understanding the effect of climatology on monthly rainfall amounts in Australia using Tweedie GLMsHasan, Md. Masud / Dunn, Peter K et al. | 2012
- 1018
-
Tropical systems from the southwest Indian Ocean making landfall over the Limpopo River Basin, southern Africa: a historical perspectiveMalherbe, J. / Engelbrecht, F.A. / Landman, W.A. / Engelbrecht, C.J. et al. | 2012
- 1033
-
Joint modes of climate variability across the inter‐AmericasJury, Mark R. / Malmgren, Björn A. et al. | 2012
- 1047
-
Spatio‐temporal variation of daily extreme temperatures over TurkeyToros, Hüseyin et al. | 2012
- 1056
-
Relationship between daily atmospheric circulation types and winter dry/wet spells in western IranRaziei, Tayeb / Bordi, Isabella / Pereira, Luis S. / Corte‐Real, João / Santos, João A. et al. | 2012
- 1069
-
Quantifying the benefits of a long‐lead ENSO prediction model to enhance harvest management—A case study for the Herbert sugarcane growing region, AustraliaEveringham, Yvette L. / Stoeckl, Natalie E. / Cusack, Justin / Osborne, John A. et al. | 2012
- 1077
-
Local and global climate signals from tree rings of Parkinsonia praecox in La Guajira, ColombiaRamírez, Jorge Andrés / del Valle, Jorge Ignacio et al. | 2012
- 1089
-
Tree ring density‐based summer temperature reconstruction for Zajsan Lake area, East KazakhstanChen, Feng / Yuan, Yujiang / Wei, Wenshou / Wang, Lily / Yu, Shulong / Zhang, Ruibo / Fan, Ziang / Shang, Huaming / Zhang, Tongwen / Li, Yang et al. | 2012
- 1098
-
A stochastic space‐time model for the generation of daily rainfall in the Gaza StripMhanna, Muamaraldin / Bauwens, Willy et al. | 2012
- 1113
-
Stochastic simulation of rainfall in the semi‐arid Limpopo basin, BotswanaKenabatho, P. K. / McIntyre, N. R. / Chandler, R. E. / Wheater, H. S. et al. | 2012
- 1128
-
Eastward shift of the Pacific/North American pattern on an interdecadal time scale and an associated synoptic eddy feedbackLee, Yun‐Young / Kug, Jong‐Seong / Lim, Gyu‐Ho / Watanabe, Masahiro et al. | 2012