Japan's Nuclear Regulation Authority has effectively approved the eventual restart of unit 3 at Shikoku Electric Power Company's Ikata NPP in Ehime prefecture (Englisch)
In:
Nuclear engineering international
;
61
, 743
; 6
;
2016
-
ISSN:
- Aufsatz (Zeitschrift) / Print
-
Titel:Japan's Nuclear Regulation Authority has effectively approved the eventual restart of unit 3 at Shikoku Electric Power Company's Ikata NPP in Ehime prefecture
-
Erschienen in:Nuclear engineering international ; 61, 743 ; 6
-
Verlag:
- Neue Suche nach: Global Trade Media
-
Erscheinungsort:London
-
Erscheinungsdatum:2016
-
ISSN:
-
ZDBID:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Print
-
Sprache:Englisch
- Neue Suche nach: 52.55 / 58.54 / 58.54 / 52.55
- Weitere Informationen zu Basisklassifikation
- Neue Suche nach: 275/5540
-
Schlagwörter:
-
Klassifikation:
-
Datenquelle:
Inhaltsverzeichnis – Band 61, Ausgabe 743
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 5
-
Westinghouse gets serious about UK SMRs| 2016
- 5
-
Iter project delayed and over budget| 2016
- 5
-
Swedish approval for Finland's Hanhikivi NPP| 2016
- 5
-
Iran enters the global market for nuclear materials| 2016
- 6
-
Russia's National Operator for Radioactive Waste Management| 2016
- 6
-
Japan's Board of Audit estimates that efforts to remove radioactive fallout resulting from the accident at the Fukushima Daiichi NPP would cost more than $27 billion by the end of the current fiscal year| 2016
- 6
-
Westinghouse Electric Company is to expand its nuclear fuel factory in Vasteras, Sweden, in response to growing demand for nuclear fuel supply diversification for WER-1,000 reactors in Europe| 2016
- 6
-
Japan's Nuclear Regulation Authority has effectively approved the eventual restart of unit 3 at Shikoku Electric Power Company's Ikata NPP in Ehime prefecture| 2016
- 6
-
EDF subsidiary EDF Developpement Environnement signed an agreement to buy low-level radioactive waste operations in Sweden and the UK from Sweden's Studsvik for SEK355 million ($44 million)| 2016
- 6
-
Russian state nuclear corporation Rosatom has denied reports that it is considering selling a 49% stake in Turkey's Akkuyu NPP project| 2016
- 6
-
Japan's Nuclear Regulation Authority is to review its inspection system for NPPs and in future will carry out safety inspections without prior notice to plant operators| 2016
- 6
-
Germany's Gundremmingen NPP| 2016
- 6
-
Russia state nuclear corporation Rosatom and Algeria's Commissariat for Atomic Energy have signed a Memorandum of Understanding on cooperation in the field of nuclear energy for peaceful purposes| 2016
- 6
-
Ukrainian nuclear utility Energoatom is unable to meet payments for fresh nuclear fuel and materials and for the export of used nuclear fuel| 2016
- 6
-
Rusatom International Network , part of Russian state nuclear corporation Rosatom, has signed a memorandum of understanding with the Korean Atomic Industrial Forum aimed at "enhancing dialogue between the nuclear industries of the two countries"| 2016
- 6
-
Japan's Nuclear Regulation Authority is to begin providing daily information on the safety of four NPPs located near the regions recently hit by a series of earthquakes| 2016
- 6
-
Jordan and Russia have signed a nuclear energy cooperation agreement covering safety legislation| 2016
- 6
-
Belgium's nuclear safety agency says unit 2 at Tihange NPP and unit 3 at Doel NPP meet the "strictest possible safety requirements"| 2016
- 6
-
India's Atomic Energy Regulatory Board has said unit 1 of Kakrapar Atomic Power Station (a 220MWe pressurised heavy water reactor), which was shut down in March following a leak of radioactive water, may remain closed for three to eight months| 2016
- 6
-
French President Francois Hollande will publish a decree later this year formally launching the process to shut down France's Fessenheim NPP| 2016
- 6
-
EDF has extended the outage period for unit 2 of its Paluel NPP until March 2017 after a 450t steam generator crashed onto the reactor floor during handling in March| 2016
- 6
-
US uranium enrichment company Centrus Energy Corporation and uranium conversion company ConverDyn have signed a memorandum of understanding to explore the potential for joint sales of their respective nuclear fuel products and services around the world| 2016
- 7
-
Russia's National Research Nuclear University will become the first Russian university to launch a MA programme in nuclear management technologies which meets International Atomic Energy Agency standards| 2016
- 7
-
The State Nuclear Regulatory Inspectorate of Ukraine has granted a separate permit for activities| 2016
- 7
-
The first reactor coolant pump for an AP1000 reactor plant in the US has been delivered to unit 3 at Georgia Power's Vogtle NPP project| 2016
- 7
-
US EnergySolutions has signed a collaborative agreement with the Japan Atomic Power Company for decommissioning commercial light water NPPs in Japan| 2016
- 7
-
Canada's Federal Court of Appeal has dismissed a judicial review of the environmental assessment for Ontario Power Generation's planned CAD12.8 billion refurbishment of the Darlington NPP in response to a lawsuit brought by groups led by Greenpeace Canada| 2016
- 7
-
The first shipment of nuclear fuel will be delivered by Russia to the Belarusian NPP in Ostravets in late 2017| 2016
- 7
-
Repair and restructuring has been completed on the graphite stack of the RBMK-1000 reactor at unit 1 at Russia's Kursk NPP, to bring the stack geometry back in line with original design requirements| 2016
- 7
-
Canada-based L-3 Mapps is to upgrade the full-scope simulator at Slovenia's single-unit Krsko NPP under a contract signed with operator Nuklearna Elektrarna Krsko| 2016
- 7
-
US Power company Entergy announced that its Pilgrim NPP in Massachusetts will be refuelled for the last time in 2017 and will shut down on 31st May 2019| 2016
- 7
-
Russia's Mining and Chemical Combine at Zheleznogorsk has begun the next stage of work to decommission an outdoor reservoir for liquid radioactive waste storage and to develop a pilot industrial installation to remove sludge deposits| 2016
- 7
-
OECD Nuclear Energy Agency| 2016
- 7
-
Russian state nuclear corporation Rosatom has called for bids to decommission Building 4 at the Angarsk Electrolysis Chemical Complex, formerly a key uranium enrichment and conversion facility| 2016
- 7
-
The Emirates Nuclear Energy Corporation has completed the concrete dome for the unit 2 reactor containment building at the Barakah NPP in Abu Dhabi| 2016
- 7
-
Sellafield Limited and Tokyo Electric Power Company| 2016
- 7
-
China's first maritime nuclear power platform in the South China Sea is due to be completed by 2018 and be put into operation by 2019, according to the Chinese newspaper Global Times| 2016
- 7
-
Canada's L-3 Mapps has signed a contract with Korea Hydro & Nuclear Power to supply a full-scope training simulator for the Wolsong 1 Candu pressurized heavy water reactor in South Korea| 2016
- 7
-
The digital control system for China's demonstration high-temperature gas-cooled --pebble bed module reactor--has passed factory acceptance tests and will now be sent to the construction site at Shidaowan in Shandong province, according to China General Nuclear| 2016
- 7
-
Electricite de France is to delay the final decision on whether to proceed with its 18 billion [pounds sterling] ($26 billion) NPP at Hinkley Point C in the UK by several months| 2016
- 7
-
Russia's Novovoronezh NPP| 2016
- 8
-
Renewable power--can it push nuclear out of the picture?Kidd, Steve et al. | 2016
- 10
-
Expanding the table| 2016
- 12
-
A global response| 2016
- 16
-
Fuelling innovationStrumpell, John et al. | 2016
- 20
-
Lines in the sandThomson, Corrina et al. | 2016
- 22
-
Russian reactions| 2016
- 26
-
Fast reactions| 2016
- 29
-
Political power playPerera, Judith et al. | 2016
- 33
-
Mission control: Robert Krivanek of the International Atomic Energy Agency considers the results from SALTO peer review missions and summarizes the main trends and results from follow-up missions thus farKrivanek, Robert et al. | 2016
- 36
-
Addressing nuclear new build construction risks: some pointers on risk management in plant construction from former Finnish chief regulatorLaaksonen, Jukka et al. | 2016
- 40
-
Through the looking glass| 2016