On the interaction between roadrunner or railway scheduling and priority lists or resource flow networks (Englisch)
- Neue Suche nach: Tian, Wendi
- Neue Suche nach: Demeulemeester, Erik
- Neue Suche nach: Tian, Wendi
- Neue Suche nach: Demeulemeester, Erik
In:
Flexible Services and Manufacturing Journal
;
25
, 1-2
; 145-174
;
2012
-
ISSN:
- Aufsatz (Zeitschrift) / Print
-
Titel:On the interaction between roadrunner or railway scheduling and priority lists or resource flow networks
-
Beteiligte:Tian, Wendi ( Autor:in ) / Demeulemeester, Erik ( Autor:in )
-
Erschienen in:Flexible Services and Manufacturing Journal ; 25, 1-2 ; 145-174
-
Verlag:
- Neue Suche nach: Springer US
- Neue Suche nach: Springer
-
Erscheinungsort:New York, NY
-
Erscheinungsdatum:2012
-
ISSN:
-
ZDBID:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis – Band 25, Ausgabe 1-2
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
Project management and schedulingDemeulemeester, Erik / Kolisch, Rainer / Salo, Ahti et al. | 2012
- 6
-
A new formulation for the project scheduling problem under limited resourcesBianco, Lucio / Caramia, Massimiliano et al. | 2011
- 25
-
Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resourcesKoné, Oumar / Artigues, Christian / Lopez, Pierre / Mongeau, Marcel et al. | 2012
- 48
-
New meta-heuristics for the resource-constrained project scheduling problemLim, Andrew / Ma, Hong / Rodrigues, Brian / Tan, Sun Teck / Xiao, Fei et al. | 2011
- 74
-
Project scheduling with resource capacities and requests varying with time: a case studyHartmann, Sönke et al. | 2012
- 94
-
An ant-based coordination mechanism for resource-constrained project scheduling with multiple agents and cash flow objectivesFink, Andreas / Homberger, Jörg et al. | 2012
- 122
-
An artificial immune system algorithm for the resource availability cost problemVan Peteghem, Vincent / Vanhoucke, Mario et al. | 2011
- 145
-
On the interaction between roadrunner or railway scheduling and priority lists or resource flow networksTian, Wendi / Demeulemeester, Erik et al. | 2012
- 175
-
Robust optimization for resource-constrained project scheduling with uncertain activity durationsArtigues, Christian / Leus, Roel / Talla Nobibon, Fabrice et al. | 2012
- 206
-
Resource dedication problem in a multi-project environmentBeşikci, Umut / Bilge, Ümit / Ulusoy, Gündüz et al. | 2012
- 230
-
An integrated scheduling and control model for multi-mode projectsHazır, Öncü / Schmidt, Klaus Werner et al. | 2012
- 255
-
Project portfolio selection under uncertainty with outsourcing opportunitiesGutjahr, Walter J. / Froeschl, Karl A. et al. | 2011