Characterization of Vacuum Pumps and Engneering Analysis of Vacuum Units for Automated Pumping Plants (Englisch)
- Neue Suche nach: Nazarov, N. T.
- Neue Suche nach: Nazarov, S. N.
- Neue Suche nach: Filipovich, Yu. Yu.
- Neue Suche nach: Nazarov, N. T.
- Neue Suche nach: Nazarov, S. N.
- Neue Suche nach: Filipovich, Yu. Yu.
In:
Power Technology and Engineering
;
37
, 3
; 153-156
;
2003
-
ISSN:
- Aufsatz (Zeitschrift) / Print
-
Titel:Characterization of Vacuum Pumps and Engneering Analysis of Vacuum Units for Automated Pumping Plants
-
Beteiligte:
-
Erschienen in:Power Technology and Engineering ; 37, 3 ; 153-156
-
Verlag:
- Neue Suche nach: Kluwer Academic Publishers-Plenum Publishers
- Neue Suche nach: Kluwer Academic
-
Erscheinungsort:New York, NY
-
Erscheinungsdatum:2003
-
ISSN:
-
ZDBID:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Print
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis – Band 37, Ausgabe 3
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 135
-
Actual Stresses in Concrete Dams Determined by a Local Stress Relief MethodZateev, V. B. et al. | 2003
- 143
-
A Method for Processing Stress-Strain State Data from Aged String Strain-GaugesShaidurov, G. Ya. / Myakotin, G. S. / Kulikov, A. V. / Bulatov, V. A. / Voloshin, A. M. / Potekhin, A. M. et al. | 2003
- 148
-
Experimental Studies of Wave Hydraulic Power UnitsDrobakhin, V. P. / Nolirovskaya, N. D. / Osadchuk, V. A. / Savchenko, A. V. et al. | 2003
- 153
-
Characterization of Vacuum Pumps and Engneering Analysis of Vacuum Units for Automated Pumping PlantsNazarov, N. T. / Nazarov, S. N. / Filipovich, Yu. Yu. et al. | 2003
- 157
-
Service Life and Its Expenditure Rate in Hydraulic Units of a Hydroelectric Power Plant under Different Operational RegimesGrigor'ev, V. I. et al. | 2003
- 161
-
A Mathematical Model for Monitoring the Rock-Earthen Dam of the Hoa Binh Hydraulic Power SystemVladimirov, V. B. / Zaretskii, Yu. K. / Orekhov, V. B. et al. | 2003
- 167
-
Three-Stage Combustion of Solid Fuel: Practical Experience of Boiler UpdatingShul'man, V. L. / Parshukov, V. S. / Glazkov, V. K. et al. | 2003
- 171
-
Reconditioning of TGME-206 Boiler Damaged by Through Cracks and Estimation of Its ServiceabilityGrin', E. A. / Anokhin, A. E. et al. | 2003
- 175
-
Diagnostics of the Condition of the Flow-Through Part of High-Pressure and Intermediate-Pressure Cylinders by Running Measurements of Steam Pressure and Temperature in a TurbinePerminov, I. A. / Orlik, V. G. et al. | 2003
- 179
-
Updating of Feed Pumps for 150 – 1200-MW Power Units at the Kaluga Turbine PlantKiryukhin, V. I. / Tsimmerman, S. D. / Semenov, Yu. M. / Ankudinov, A. A. / Vasin, V. A. et al. | 2003
- 184
-
A Method for Automatic Suppression of AsynchronismAkopyan, A. S. / Akopyan, S. G. et al. | 2003
- 191
-
Use of Static Compensators for Voltage Control at 330- and 500-kV SubstationsDement'ev, Yu. A. / Kochkin, V. I. / Idiatullov, R. M. / Papafanasopulo, S. G. / Smirnov, A. A. / Smirnov, S. G. et al. | 2003
- 196
-
Calculation of Maximum Permissible Load Currents under Cyclic Loading Conditions for Cables Laid in the Ground and in Pipes in the GroundKholodnyi, S. D. / Krichko, V. A. / Kamenskii, M. K. et al. | 2003