Process optimization of SnCuNi soldering material using artificial parametric design (Englisch)
- Neue Suche nach: Huang, Chien-Yi
- Neue Suche nach: Huang, Hui-Hua
- Neue Suche nach: Huang, Chien-Yi
- Neue Suche nach: Huang, Hui-Hua
In:
Journal of Intelligent Manufacturing
;
25
, 4
; 813-823
;
2012
-
ISSN:
- Aufsatz (Zeitschrift) / Print
-
Titel:Process optimization of SnCuNi soldering material using artificial parametric design
-
Beteiligte:Huang, Chien-Yi ( Autor:in ) / Huang, Hui-Hua ( Autor:in )
-
Erschienen in:Journal of Intelligent Manufacturing ; 25, 4 ; 813-823
-
Verlag:
- Neue Suche nach: Springer US
- Neue Suche nach: Springer Science + Business Media
-
Erscheinungsort:Norwell, Mass.
-
Erscheinungsdatum:2012
-
ISSN:
-
ZDBID:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Print
-
Sprache:Englisch
- Neue Suche nach: 275/1935
- Neue Suche nach: 52.72
- Weitere Informationen zu Basisklassifikation
-
Schlagwörter:
-
Klassifikation:
-
Datenquelle:
Inhaltsverzeichnis – Band 25, Ausgabe 4
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 629
-
An adaptive pull strategy for remanufacturing systemsTakahashi, Katsuhiko / Doi, Yasuhiro / Hirotani, Daisuke / Morikawa, Katsumi et al. | 2012
- 647
-
Solving large scale disassembly line balancing problem with uncertainty using reinforcement learningTuncel, Emre / Zeid, Abe / Kamarthi, Sagar et al. | 2012
- 661
-
Complex componential approach for redundancy allocation problem solved by simulation-optimization frameworkMariano, Carlos Henrique / Kuri-Morales, Angel Fernando et al. | 2012
- 681
-
Multi-commodity flow dynamic resource assignment and matrix-based job dispatching for multi-relay transfer in complex material handling systems (MHS)Joe, Yen Yen / Gan, Oon Peen / Lewis, Frank L. et al. | 2012
- 699
-
A polar-based guided multi-objective evolutionary algorithm to search for optimal solutions interested by decision-makers in a logistics network design problemRajabalipour Cheshmehgaz, Hossein / Islam, Md. Nazrul / Desa, Mohammad Ishak et al. | 2012
- 727
-
A condition-based maintenance policy for a production system under excessive environmental degradationChouikhi, H. / Khatab, A. / Rezg, N. et al. | 2012
- 739
-
Differential evolution variants to schedule flexible assembly linesVincent, Lui Wen Han / Ponnambalam, S. G. / Kanagaraj, G. et al. | 2012
- 755
-
Hub network design problem in the presence of disruptionsParvaresh, F. / Husseini, S.M. Moattar / Golpayegany, S.A. Hashemi / Karimi, B. et al. | 2012
- 775
-
Vector optimization of laser solid freeform fabrication system using a hierarchical mutable smart bee-fuzzy inference system and hybrid NSGA-II/self-organizing mapFathi, Alireza / Mozaffari, Ahmad et al. | 2012
- 797
-
CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlappingGrèze, Lucas / Pellerin, Robert / Leclaire, Patrice / Perrier, Nathalie et al. | 2012
- 813
-
Process optimization of SnCuNi soldering material using artificial parametric designHuang, Chien-Yi / Huang, Hui-Hua et al. | 2012
- 825
-
Mining SOTs and dispatching rules from RFID-enabled real-time shopfloor production dataZhong, Ray Y. / Huang, George Q. / Dai, Q. Y. / Zhang, T. et al. | 2012