Appropriate Work Design in Lean Production Systems (Englisch)
- Neue Suche nach: Dombrowski, Uwe
- Neue Suche nach: Hellmich, Eva-Maria
- Neue Suche nach: Mielke, Tim
- Neue Suche nach: Hernández, Cesáreo
- Neue Suche nach: López-Paredes, Adolfo
- Neue Suche nach: Pérez-Ríos, José M.
- Neue Suche nach: Dombrowski, Uwe
- Neue Suche nach: Hellmich, Eva-Maria
- Neue Suche nach: Mielke, Tim
In:
Managing Complexity
: Challenges for Industrial Engineering and Operations Management
;
Kapitel: 15
;
129-137
;
2014
- Aufsatz/Kapitel (Buch) / Elektronische Ressource
-
Titel:Appropriate Work Design in Lean Production Systems
-
Weitere Titelangaben:Lect. Notes in Managem., Industrial Engineering
-
Beteiligte:Hernández, Cesáreo ( Herausgeber:in ) / López-Paredes, Adolfo ( Herausgeber:in ) / Pérez-Ríos, José M. ( Herausgeber:in ) / Dombrowski, Uwe ( Autor:in ) / Hellmich, Eva-Maria ( Autor:in ) / Mielke, Tim ( Autor:in )
-
Erschienen in:Managing Complexity : Challenges for Industrial Engineering and Operations Management ; Kapitel: 15 ; 129-137
-
Verlag:
- Neue Suche nach: Springer International Publishing
-
Erscheinungsort:Cham
-
Erscheinungsdatum:26.07.2014
-
Format / Umfang:9 pages
-
ISBN:
-
ISSN:
-
DOI:
-
Medientyp:Aufsatz/Kapitel (Buch)
-
Format:Elektronische Ressource
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis E-Book
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
Looking at the Future of Industrial Engineering in EuropeMummolo, Giovanni et al. | 2014
- 2
-
A “Collaborative Me” Crossroad: Individual Beliefs and the Adoption of Corporate BlogsFernández-Cardador, Pedro / Hernández-García, Ángel / Iglesias-Pradas, Santiago et al. | 2014
- 3
-
Towards Strategic Project ManagementHermano, Víctor / Martín-Cruz, Natalia et al. | 2014
- 4
-
The Impact of Innovation Management Techniques on Radical Innovation: An Empirical StudyIgartua, Juan Ignacio / Errasti, Nekane / Ganzarain, Jaione et al. | 2014
- 5
-
The Logical Framework Approach and Worker CommitmentJaca, Carmen / Paipa-Galeano, Luis / Viles, Elisabeth / Mateo, Ricardo / Santos, Javier et al. | 2014
- 6
-
New Technologies and Entrepreneurial IntentionMartin-Cruz, Natalia / Rodriguez-Escudero, Ana Isabel et al. | 2014
- 7
-
Return of Equity Issues in the Spanish Stock Market from the Investor’s Perspective, During the 1997–2012 PeriodParreño, Javier / Ruiz, Felipe / Roux, Félix et al. | 2014
- 8
-
Sustainable Balanced Scorecard: Practical Application to a Services CompanyRedondo Castán, Alfonso / Pascual Ruano, José Antonio / Gento Municio, Angel Manuel / Muñoz Sanz, Javier et al. | 2014
- 9
-
Predisposition of Workers to Share Knowledge: An Empirical StudySáiz, Lourdes / Díez, José Ignacio / Manzanedo, Miguel Ángel / del Olmo, Ricardo et al. | 2014
- 10
-
The M.A.G. Factor. Management, Administration and Guidance. Where and How Much MAG Does Each Project Deserve and Need? A New, Original Assessment and Scoring SystemTaylor, Tom et al. | 2014
- 11
-
Information Capability in Basque Country Quality Award WinnersZárraga Rodríguez, Marta / Álvarez, M. Jesús et al. | 2014
- 12
-
A Model of Makespan Flow-Shop Scheduling Under Ergonomic RequirementsAsensio Cuesta, Sabina / Gómez Gasquet, Pedro / Andrés Romano, Carlos / Alemany Díaz, María del Mar Eva et al. | 2014
- 13
-
A MILP Event Based Formulation for a Real-world Multimode RCSP with Generalized Temporal ConstraintsBorreguero-Sanchidrián, Tamara / García-Sánchez, Álvaro / Ortega-Mier, Miguel et al. | 2014
- 14
-
NTIGen: A Software for Generating Nissan Based Instances for Time and Space Assembly Line BalancingChica Serrano, Manuel / Cordón García, Óscar / Damas Arroyo, Sergio / Bautista, Joaquín et al. | 2014
- 15
-
Appropriate Work Design in Lean Production SystemsDombrowski, Uwe / Hellmich, Eva-Maria / Mielke, Tim et al. | 2014
- 16
-
Two Simple Constructive algorithms for the Distributed Assembly Permutation Flowshop Scheduling ProblemHatami, Sara / Ruiz, Rubén / Andrés Romano, Carlos et al. | 2014
- 17
-
Applications of the Lagrangian Relaxation Method to Operations SchedulingLavios, Juan José / Arauzo, José Alberto / del Olmo, Ricardo / Manzanedo, Miguel Ángel et al. | 2014
- 18
-
Toward Various Exact Modeling the Job Shop Scheduling Problem for Minimizing Total Weighted TardinessNamakshenas, Mohammad / Sahraeian, Rashed et al. | 2014
- 19
-
Set-up Continuity in Tactical Planning of Semi-Continuous Industrial ProcessesPerales, David Pérez / Alemany Díaz, Maria del Mar Eva / Lario Esteban, Francisco-Cruz / Fuertes-Miquel, V. S. et al. | 2014
- 20
-
Estimating Costs in the EOQ FormulaVidal-Carreras, Pilar I. / Garcia-Sabater, Jose P. / Valero-Herrero, Maria / Santandreu-Mascarell, Cristina et al. | 2014
- 21
-
Order Promising Process for Supply Chains with Lack of Homogeneity in the ProductAlemany Díaz, Maria del Mar Eva / Boza, Andrés / Ortiz, Angel / Poler, Raúl et al. | 2014
- 22
-
Modeling the Master Plan for Supply Chains with Lack of Homogeneity in the ProductsAlemany Díaz, Maria del Mar Eva / Cuenca, Llanos / Ortiz, Angel / Pérez Perales, David et al. | 2014
- 23
-
Packaging Logistics. A Case Study in Dairy SectorGarcía Arca, Jesús / Prado Prado, J. Carlos / González-Portela Garrido, A. Trinidad et al. | 2014
- 24
-
Best Practices in Sustainable Supply Chain Management: A Literature ReviewMejías Sacaluga, Ana María / Pardo Froján, Juan E. et al. | 2014
- 25
-
Supplier Evaluation and Selection: A Review of the literature since 2007Moliné, Joan Ignasi / Coves, Ana María et al. | 2014
- 26
-
Logistic Management Employing Tabu Search and Neural Network Algorithms: A Case StudyGarcía-Pardo, Isidro Peña / García Márquez, Fausto Pedro et al. | 2014
- 27
-
Multiagent Model for Supply Chain ManagementPonte Blanco, Borja / Pino Díez, Raúl / Fernández Quesada, Isabel / García Fernández, Nazario et al. | 2014
- 28
-
Revisiting the SEC Classification Framework in Traditional and Electronic CommerceAgudo-Peregrina, Ángel F. / Chaparro-Peláez, Julián / Pascual-Miguel, Félix J. et al. | 2014
- 29
-
A Roadmap to Establish Collaboration Among SMEs Belonging to Non-Hierarchical NetworksAndres, Beatriz / Poler, Raul et al. | 2014
- 30
-
Incorporating the Work Pace Concept into the MMSP-WBautista, Joaquín / Alfaro, Rocío / Batalla, Cristina / Cano, Alberto et al. | 2014
- 31
-
Applying the LEGOstics concept in formal education at Technical University of CartagenaBajor, Peter / de la Fuente Aragón, María Victoria / Ros-McDonnell, Lorenzo et al. | 2014
- 32
-
Neural Network Application for Risk Factors Estimation in Manufacturing AccidentsCarrillo-Castrillo, Jesús Antonio / Guadix Martín, José / Grosso de la Vega, Rafael / Onieva, Luis et al. | 2014
- 33
-
A New Constructive Heuristic for the Fm|block|ΣTCompanys Pascual, Ramon / Ribas Vila, Imma et al. | 2014
- 34
-
Applying Cluster Analysis to Renewable Energy Emergent Sector at Local LevelLarruscain, Jaso / Río-Belver, Rosa / Cilleruelo, Ernesto / Garechana, Gaizka / Gavilanes-Trapote, Javier et al. | 2014
- 35
-
How Organizational Cybernetics can Help to Organize Debates on Complex IssuesPérez Ríos, José / Velasco Jiménez, Iván / Sánchez Mayoral, Pablo et al. | 2014
- 36
-
Agent-Based Modelling and Archaeological ComplexityPoza, David J. / del Olmo, Ricardo et al. | 2014
- 37
-
Complex Networks Applied to Communication Management in Emergency CrisisRuiz Martín, Cristina / Ramírez Ferrero, Mario / González Álvarez, José Luis / Poza, David J. et al. | 2014
- 38
-
Localization Based on Business Interactions Through a Simulated Annealing AlgorithmSánchez-Saiz, Rosa Mª / Galán, José Manuel / Santos, José Ignacio et al. | 2014
- 39
-
Methodology for the Strategic Capacity Planning in Universitiesde la Torre, Rocio / Lusa, Amaia / Mateo, Manuel et al. | 2014