Production pattern of machinery firms: viewpoints of technology and management (Englisch)
Nationallizenz
- Neue Suche nach: Kao, C.
- Neue Suche nach: Wang, T.-Y.
- Neue Suche nach: Kuo, S.
- Neue Suche nach: Chen, L.-H.
- Neue Suche nach: Horng, S.-D.
- Neue Suche nach: Kao, C.
- Neue Suche nach: Wang, T.-Y.
- Neue Suche nach: Kuo, S.
- Neue Suche nach: Chen, L.-H.
- Neue Suche nach: Horng, S.-D.
In:
International Journal of Production Research
;
33
, 11
;
3207-3215
;
1995
- Aufsatz (Zeitschrift) / Elektronische Ressource
-
Titel:Production pattern of machinery firms: viewpoints of technology and management
-
Beteiligte:Kao, C. ( Autor:in ) / Wang, T.-Y. ( Autor:in ) / Kuo, S. ( Autor:in ) / Chen, L.-H. ( Autor:in ) / Horng, S.-D. ( Autor:in )
-
Erschienen in:International Journal of Production Research ; 33, 11 ; 3207-3215
-
Verlag:
- Neue Suche nach: Taylor & Francis
-
Erscheinungsdatum:01.11.1995
-
Format / Umfang:9 pages
-
ISSN:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Elektronische Ressource
-
Sprache:Englisch
-
Datenquelle:
Inhaltsverzeichnis – Band 33, Ausgabe 11
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 2945
-
The impact of institutional factors on forecast accuracy: manufacturing executives perspectiveWacker, J. G. / Sprague, L. G. et al. | 1995
- 2959
-
An economic approach towards using individual measurements to control the mean of continuously monitored processesSheil, J. et al. | 1995
- 2973
-
Allocation of tasks to stations in small-batch assembly with learning: basic conceptsKarni, R. / Herer, Y. T. et al. | 1995
- 2999
-
Simulation, animation, and analysis of design disassembly for maintainability analysisVujosevic†, R. / Raskar, R. / Yetukuri, N. V. / Jothishankar, M. C. / Juang, S.-H. et al. | 1995
- 3023
-
Modelling battery constraints in discrete event automated guided vehicle simulationsMcHANEY, R. et al. | 1995
- 3041
-
An empirical investigation of critical TQM factors using exploratory factor analysisTamimi, N. et al. | 1995
- 3053
-
Impact of JIT on organizational performance of U.S. firmsChang, D. / Lee, S. M. et al. | 1995
- 3069
-
CAD-directed automatic assembly sequence planningGu, P. / Yan, X. et al. | 1995
- 3101
-
Multilayer perceptions for detecting cyclic data on control chartsHwarng, H. B. et al. | 1995
- 3101
-
Multilayer perceptrons for detecting cyclic data on control chartsHwarng, H.B. et al. | 1995
- 3119
-
Planning product disassembly for material recovery opportunitiesJohnson, M. R. / Wang, M H. et al. | 1995
- 3143
-
A simple lot-scheduling model for just-in-time manufacturingAl-Asseri, I. / HARlGA, M. et al. | 1995
- 3163
-
Analysing the natural resting aspects of a complex partNgoi, B. K. A. / Lim, L. E. N. / Lee, S. S. G. et al. | 1995
- 3173
-
Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup timesOvacik, I. M. / Uzsoy, R. et al. | 1995
- 3193
-
Integration of simulation and emulation with graphical design for the development of cell control programsWitzerman, J. P. / Nof, S. Y. et al. | 1995
- 3207
-
Production pattern of machinery firms: viewpoints of technology and managementKao, C. / Wang, T.-Y. / Kuo, S. / Chen, L.-H. / Horng, S.-D. et al. | 1995
- 3217
-
A learning-based methodology for dynamic scheduling in distributed manufacturing systemsChiu, C. / Yih, Y. et al. | 1995