Genetic algorithm with critical path improvement strategy for solving project scheduling problem with multiple modes (Englisch)
- Neue Suche nach: Okada, I.
- Neue Suche nach: Zhang, X.F.
- Neue Suche nach: Yang, H.Y.
- Neue Suche nach: Zhang, W.Q.
- Neue Suche nach: Fujimura, S.
- Neue Suche nach: Okada, I.
- Neue Suche nach: Zhang, X.F.
- Neue Suche nach: Yang, H.Y.
- Neue Suche nach: Zhang, W.Q.
- Neue Suche nach: Fujimura, S.
In:
Innovation in Product and Production, ICPR, International Conference on Production Research, 21
;
1-5
;
2011
-
ISBN:
- Aufsatz (Konferenz) / Datenträger
-
Titel:Genetic algorithm with critical path improvement strategy for solving project scheduling problem with multiple modes
-
Beteiligte:Okada, I. ( Autor:in ) / Zhang, X.F. ( Autor:in ) / Yang, H.Y. ( Autor:in ) / Zhang, W.Q. ( Autor:in ) / Fujimura, S. ( Autor:in )
-
Erschienen in:
-
Verlag:
- Neue Suche nach: Fraunhofer Verlag
-
Erscheinungsort:Stuttgart
-
Erscheinungsdatum:2011
-
Format / Umfang:5 Seiten, 7 Bilder, 3 Tabellen, 17 Quellen
-
Anmerkungen:(nicht paginiert)
-
ISBN:
-
Medientyp:Aufsatz (Konferenz)
-
Format:Datenträger
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis Konferenzband
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 1
-
A multi-objective approach based on genetic algorithm for multi-model line process planning considering difference in worker abilityWeng, Jiahua / Wu, Xianchao / Onari, Hisashi et al. | 2011
- 1
-
Measuring interaction using levels of automation over timeMattsson, S. / Fässberg, T. / Stahre, J. / Fasth, A. et al. | 2011
- 1
-
Effects of simple and correlated mutations on evolution strategies for static and dynamic facility layout problemsHirabayashi, N. / Morizawa, K. et al. | 2011
- 1
-
Evaluation of different interaction methods applied in participatory workspace designBraatz, D. / Lopes, D. / Camarotto, J.A. / Menegon, N.L. et al. | 2011
- 1
-
The order and volume fill rates in inventory control systemsLarsen, C. / Thorstenson, A. et al. | 2011
- 1
-
Green purchasing implementation: status and barriers of german manufacturingBernhard, Marian / Ying Yang et al. | 2011
- 1
-
Development of an assessment tool for industrial R&DSchubert, Michael / Finger, Judith / Kern, Manuel / Wagner, Frank et al. | 2011
- 1
-
Supply chain implications of e-commerce channels for additive manufacturingEyers, D.R. / Potter, A.T. / Wang, Y. et al. | 2011
- 1
-
Construction of a lego-brick type ERP systemShibuya, Masahiro / Jun, Gu / Iida, Kenichi / Mikami, Koki et al. | 2011
- 1
-
Complexity-induced production and inventory cost in consumer goods supply chainsDanne, C. / Dangelmaier, W. / Häusler, P. et al. | 2011
- 1
-
Online optimization in series productionBrodkorb, D. / Dangelmaier, W. et al. | 2011
- 1
-
Supply chain operational performance and its influential factors: cross national comparison between Japan and ChinaGong, Jingjing / Ogasawara, Tomohiro / Suzuki, Sadami et al. | 2011
- 1
-
CO2-Emission aware Pareto optimization for international transportation with time tablesXue, Yudong / Irohara, Takashi / Klöpper, Benjamin / Pater, Jan-Patrick et al. | 2011
- 1
-
A TOPSIS-based pre-selection method supporting mutiple products partner selection in a virtual enterpriseYu, C.X. / Wong, T.N. et al. | 2011
- 1
-
Application of optimal control theory to adjust the production rate of deteriorating inventory system (Case study: Dineh Iran Co.)Sajadi, S.M. / Shafiee, M. / Emamverdi, G. et al. | 2011
- 1
-
Towards new collaboration practices in the European tooling industrySchüle, Stephan / Sturm, Flavius et al. | 2011
- 1
-
The impact of sustainability drivers on a firms' strategic decisions regarding manufacturing technologies, new product development and supply chain initiativeSchrettle, S. / Hinz, A. / Scherrer-Rathje, M. / Friedli, T. et al. | 2011
- 1
-
Benchmarking methodology on lean manufacturing in the apparel industryGregorio, A.P. Juan / Eugenia, B.H. Victoria / Jimena, R.M. Maria et al. | 2011
- 1
-
Concept to optimize inbound logistics traffic by a transport oriented scheduling in the automotive industriesFlorian, M. / Kemper, J. / Sihn, W. et al. | 2011
- 1
-
Make-to-stock policies for a multistage serial system under make-to-order production environmentMorikawa, Katsumi / Takahashi, Katsuhiko / Hirotani, Daisuke et al. | 2011
- 1
-
Active learning based process monitoring - an application reportKaupp, M. / Neher, J. et al. | 2011
- 1
-
Conceptual and methodological issues for the application of game engines in designs of productive situationsBraatz, D. / Toledo, F.M. / Tonin, L.A. / Costa, M.A.B. da / Menegon, N.L. et al. | 2011
- 1
-
Management issues for the implementation of development-concurrent cost calculationFürst, A. / Bauer, U. / Zunk, B.M. et al. | 2011
- 1
-
Outsourcing decision-making during design and engineering: three case studies in EuropeShishank, Shishank / Dekkers, Rob et al. | 2011
- 1
-
A methodology to design modular platform for production equipment - case studySaboori, Behzad / Madsen, Ole / Nielsen, Kjeld et al. | 2011
- 1
-
Handling uncertainties in industrial production with flexibility measurementsRogalski, Sven et al. | 2011
- 1
-
Solving resource constrained project scheduling problems with improved genetic algorithmLi, B. / Yang, J. / Wu, S. et al. | 2011
- 1
-
Genetic algorithm with critical path improvement strategy for solving project scheduling problem with multiple modesOkada, I. / Zhang, X.F. / Yang, H.Y. / Zhang, W.Q. / Fujimura, S. et al. | 2011
- 1
-
The service life cycle: productivity in the context of service specific phasesKramer, Janine / Kicherer, Florian / Bienzeisler, Bernd et al. | 2011
- 1
-
Modelling and measurement techniques for wire straightening machinesKreiseler, Graziella / Siegert, Jörg / Westkämper, Engelbert et al. | 2011
- 1
-
Multivariate control charts for monitoring nonlinear batch processesMarcondes Filho, D. / Fogliatto, F.S. / Oliveira, L.P.L. de et al. | 2011
- 1
-
Stability analysis of a constrained inventory systemWang, Xun / Disney, Stephen M. et al. | 2011
- 1
-
Integrating process governance and sustainability: proposal of a model for sustainable governancePurcidonio, Paula Michelle / Infante, Carlos Eduardo D. de C. / Valle, Rogerio de A.B. do et al. | 2011
- 1
-
Multilevel control of energy consumptionSchlechtendahl, J. / Haag, H. / Eberspächer, P. / Friedrich, J. / Verl, A. / Westkämper, E. et al. | 2011
- 1
-
Quasi-optimal boundary limits for AS/RS systems with 3 class-based storage policyGamberi, Mauro / Accorsi, Riccardo / Bortolini, Marco / Manzini, Riccardo et al. | 2011
- 1
-
Enterprise modeling requirements for a sustainability multi level assessmentMedini, K. / Cunha, C. da / Bernard, A. et al. | 2011
- 1
-
Design of a system for energy-efficient production in SMEsLaufs, Uwe / Schneider, Patrick / Zibuschka, Jan et al. | 2011
- 1
-
Green product and production information management in the fractal manufacturing systemRyu, K. et al. | 2011
- 1
-
Exploring the integration profile of entrepreneurial intention: an empirical study in chinese high-tech industrial clustersMao, Guanfeng / Song, Hong / Liu, Rongzhi et al. | 2011
- 1
-
Technology and human resource management methodology in "Kaikaku" (Corporate Innovation) programShirai, Kumiko / Koshijima, Ichiro / Umeda, Tomio et al. | 2011
- 1
-
Relevant criteria for the evaluation of product ideasMesserle, M. / Binz, H. / Roth, D. et al. | 2011
- 1
-
Contribution to the evaluation of sustanaibility in the family agriculture production of castor beans in the Paraíba-BrazilMartins da Silva, Armistrong / Adissi, Paulo Jose et al. | 2011
- 1
-
Simulation-based IT-support for tactical distribution network planHegmanns, T. / Orlob, J. et al. | 2011
- 1
-
Development of the cascade reuse hybrid manufacturing/remanufacturing systemKainuma, Yasutaka / Ahsan, Kamrul / Tawara, Nobuhiko et al. | 2011
- 1
-
Reconfigurable strategies for manufacturing setups to confront mass customization challengesMinhas, S.H. / Lehmann, C. / Städter, J.P. / Berger, U. et al. | 2011
- 1
-
A supporting tool for software testing process with HAYST methodAkiba, Tomoaki / Ashino, Shuta / Saito, Kazuaki et al. | 2011
- 1
-
Key collaboration strategies for designing new value-added productsFatima Zahra Barrane / Karuranga, Egide / Poulin, Diane et al. | 2011
- 1
-
A systematic selection of production management methods for productivity improvement in engineeringHinckeldeyn, Johannes / Dekkers, Rob / Altfeld, Nils / Kreutzfeldt, Jochen et al. | 2011
- 1
-
Improving the output performance of design for environment toolsBirch, A. / Short, T. / Hon, K.K.B. et al. | 2011
- 1
-
Calculation model of emission intensities due to chip treatment for machine tool operationsNarita, Hirohisa et al. | 2011
- 1
-
Artificial vision for autonomous robot handle displacement controlSzejka, A.L. / Rudek, M. / Weihmann, L. / Canciglieri, O. jun. et al. | 2011
- 1
-
The time-averaged L4L solution - A condition for long-run stability applying MRP theoryGrubbström, Robert W. et al. | 2011
- 1
-
Re-entrant scheduling problem with rejectionMoghaddam, A. / Yalaoui, F. / Amodeo, L. et al. | 2011
- 1
-
Multi-criteria optimization-based dynamic scheduling for controlling FMSShnits, B. et al. | 2011
- 1
-
Optimal ordering policies in a multi-item inventory modelSakaguchi, M. / Kodama, M. et al. | 2011
- 1
-
Support for service process redesign: the attribute-goal matrixKarni, R. / Kaner, M. / Karni, L. et al. | 2011
- 1
-
Planning and optimization of energy consumption in factories considering the peripheral systemsHaag, Holger / Siegert, Jörg / Westkämper, Engelbert et al. | 2011
- 1
-
A multiobjective cross-training considering labor preference and salary structureQian Li / Jun Gong / Tang, Jiafu / Liu, Wenxin et al. | 2011
- 1
-
Decentralised resource allocation in paced assembly processesTracht, K. / Funke, L. / Joppien, T. et al. | 2011
- 1
-
Influence of task complexity on learning times of sensorimotor tasks in assembly systemsJeske, T. / Schlick, C.M. et al. | 2011
- 1
-
Development of IT educational tools for production manager by combination of three types of BOMsIshii, Kazuyoshi / Nakano, Makoto et al. | 2011
- 1
-
Trading between classification accuracy and information in productionWienreb, M. / Lerner, B. / Rabinowitz, G. et al. | 2011
- 1
-
A model for emergency resources location and allocation under uncertaintiesZhang, Ling / Fung, Richard Y.K. / Huang, Jun et al. | 2011
- 1
-
Assessment of quality service in the marketing of fruit and vegetables in retail formats in BrazilScalco, A.R. / Oliveira, S.C. / Fonseca, A.C. / Rodrigues, F.M. et al. | 2011
- 1
-
A control engineering approach to the assessment of supply chain resilienceMarques, V.L. / Naim, M.M. et al. | 2011
- 1
-
A supporting decision tool for reverse logisticsManzini, Riccardo / Bortolini, Marco / Ferrari, Emilio / Piergallini, Andrea et al. | 2011
- 1
-
An expert system as a tool for optimization of warehousing processPawlyszyn, I. / Mackowiak, N. / Stachowiak, A. / Janczak, T. et al. | 2011
- 1
-
A new algorithm for the design of a transportation fleetPena, R. / Moran, A. / Sepulveda, J. et al. | 2011
- 1
-
Sustainable design strategies for electronics products utilising Life Cycle Assessment (LCA)Coster, R.J. De / Bateman, R.J. / Plant, A.V.C. et al. | 2011
- 1
-
A study on the design and analysis of a reverse logistics system: a case of recycling used motor vehicle tiresSuzuki, Kuninori / Aiura, Nobunori et al. | 2011
- 1
-
Ship scheduling of the ICGCPS under considering CO2 emissionHiraki, S. / Ichimura, T. / Ishii, K. et al. | 2011
- 1
-
Using a process management approach to standardise VSMKuhlang, P. / Morawetz, C. / Sihn, W. et al. | 2011
- 1
-
Collaborative and partnering approaches in the automotive industrySpang, K. / Albrecht, J.C. / Baumann, T. et al. | 2011
- 1
-
Designing control limits of the range chart for skewed processKao, S.C. / Chang, C.W. et al. | 2011
- 1
-
Simulation modeling method for designing manufacturing system including worker operationHibino, Hironori / Saito, Shinya et al. | 2011
- 1
-
Effect of visualization and knowledge creation on corporate activitiesMiyashita, F. / Furuyama, S. / Izui, T. et al. | 2011
- 1
-
Strategic foresight in production networks - A structured approachHaag, H. / Tilebein, M. et al. | 2011
- 1
-
The differences between lean manufacturing, six sigma and lean six sigma as operation strategiesGarbuio, Paula A.R. / Gouvea da Costa, Sergio E. / Pinheiro de Lima, Edson et al. | 2011
- 1
-
Nested control loops for lean material planningSpath, D. / Gerlach, S. / Scholtz, O. / Hämmerle, M. / Krause, T. et al. | 2011
- 1
-
Conceptual geometric model for prothesis modeling in CAD system: a case study to skull repairing with asymmetric defectGreboge, Thiago / Rudek, Marceloo / Canciglieri, Osiris jun. et al. | 2011
- 1
-
Method of operating equipment by image analysis on motion of handMasato, Moriya / Usuki, Jun et al. | 2011
- 1
-
Dynamic reconfiguration of manufacturing systems using its control capabilitiesLegat, Christoph / Heinecke, Georg et al. | 2011
- 1
-
Process efficiency analysis: an approach applied in manufacturing industrySantos, A.A.P. / Santos, E.A.P. / Rego, D.C. / Rocha-Loures, E.F. / Busetti, M.A. et al. | 2011
- 1
-
An agent-based approach for decision-support in production scheduling - Mathematical programming model of production scheduling with uncertaintyTamaki, H. / Sugikawa, S. et al. | 2011
- 1
-
A study on direct-ABC for specifying the factor of aggregating production costNakayama, Kagehisa / Fujita, Horishi / Ryu, Seung-Jin / Katahono, Naomi / Onari, Hisashi et al. | 2011
- 1
-
A basic study on optimal selection method of aircraft service routeFujikawa, H. / Tomikawa, S. et al. | 2011
- 1
-
An empirical study towards a definition of production complexFässberg, T. / Harlin, U. / Garmer, K. / Gullander, P. / Fasth, A. / Mattsson, S. / Dencker, K. / Davidsson, A. / Stahre, J. et al. | 2011
- 1
-
Integrated mixed model assembly line balancing procedure in presence of multiple secondary feeder lines in an ATO environmentAzzi, A. / Battini, D. / Faccio, M. / Persona, A. et al. | 2011
- 1
-
Two special workers' optimal assignment in two kinds of workers under a limited-cycle problem with multiple periodsKong, Xianda / Sun, Jing / Yamamoto, Hisashi / Matsui, Masayuki et al. | 2011
- 1
-
Understanding todays' operations performance measurement systems usePinheiro de Lima, E. / Gouvea da Costa, S.E. / Angelis, J.J. / Munik, J. et al. | 2011
- 1
-
A methodological proposal for estimating the existence of archaeological sites at infrastructure worksCordova, F.M. / Canete, L.R. et al. | 2011
- 1
-
An oligopoly model to analyze the market and social welfare for green manufacturing industryHu, G. / Wang, L. / Chen, Y. / Bidanda, B. et al. | 2011
- 1
-
A contribution to organizational design for innovation in consolidated companiesMarx, R. / Mello, A.M. de et al. | 2011
- 1
-
Influence of innovation changes on workplace ergonomicsBures, M. / Kurkin, O. / Simon, M. et al. | 2011
- 1
-
A mathematical programming aproach to the multi-activity combined timetabling & crew scheduling problemBarrera, D. / Velasco, N. / Amaya, C.A. et al. | 2011
- 1
-
Potentials of automated event handling in supply chains using intelligent control methodsDöring, Andre / Dangemaier, Wilhelm / Laroque, Christoph et al. | 2011
- 1
-
The efficiency of a steel product supply chainLöwgren, Claes / Orpana, Veikko / Löwgren, Gunnar et al. | 2011
- 1
-
Logistic and industry-specific bottlenecks in a transportation corridorHannola, L. / Myller, E. et al. | 2011
- 1
-
Trader construction problem in supply chain of auto-industry for reuse rate improvementSun, Jing / Koshijima, Ichiro / Hashimoto, Yoshihiro / Lai, Hasu et al. | 2011
- 1
-
Supporting distribution network design by combining AHP and DEAKorpela, J. / Lehmusvaara, A. / Elfvengren, K. / Tuominen, M. et al. | 2011
- 1
-
Improving the performance of a zone-picking warehouse with an RFID-assisted routing strategyHo, Ying-Chin / Chen, Jia-Chyun / Chen, Tzu-Ying et al. | 2011
- 1
-
Information retrieval in collaborative logistics decision makingCeroni, Jose / Alfaro, Rodrigo / Cubillos, Claudio et al. | 2011
- 1
-
Creating innovations and growth through diversitySpitzley, A.K.E. / Ohlhausen, P. et al. | 2011
- 1
-
The value of enhanced customisation in the existence of consumer preferences heterogeneityWong, H. / Lesmono, D. et al. | 2011
- 1
-
Rolling forecast precision measurement - a method and its applicationsEricsson, Roland / Siljemyr, Levi / Menzel, Wolfgang et al. | 2011
- 1
-
An investigation on the relationship between the implementing method of SCM and its performanceTaniguchi, Shuichi / Furuhata, Tetsum / Kainuma, Yasutaka et al. | 2011
- 1
-
Construction of the global industrial teamwork dynamicsNowatari, Masahiro et al. | 2011
- 1
-
Maintainance management in Austrian manufacturing organizations - an empirical study and a knowledge-based management frameworkSchröder, Werner E. et al. | 2011
- 1
-
Design of a supply chain management and performance evaluation model based on operations research and control theoryGehlen de Leao, A. et al. | 2011
- 1
-
Controlling production networks by using time-continuous and discrete event simulationBoyaci, P. / Wenzel, S. et al. | 2011
- 1
-
Empirical study of manufacturing strategy in Colombian SME´sMican, C. / Rubiano, O. / Orejuela, J. / Mosquera, J. / Manyoma, P. et al. | 2011
- 1
-
A business model design for the strategic and operational knowledge management of a port communityCordova, F.M. / Duran, C. et al. | 2011
- 1
-
Production research on metabolic systemBeber, M.E. / Windt, K. / Hütt, M.T. et al. | 2011
- 1
-
Maintenance and cost modeling of production systems with Petri NetsBuck, A. / Nebel, S. / Bertsche, B. et al. | 2011
- 1
-
Hybrid bi-criterion evolutionary algorithm for permutation flow shop scheduling problemXin Wei / Cheng Xia Sun / Fujimura, Shigeru et al. | 2011
- 1
-
A proposal of optimised scheduling method with combinatorial auction for cell production systemKaihara, T. / Fujii, N. / Fujii, S. / Omori, T. / Kurahashi, M. et al. | 2011
- 1
-
The HUB-CI initiative for cultural, education and training, and healthcare networksSeok, Hyesung / Nof, Shimon Y. et al. | 2011
- 1
-
Service design and management in food service industryAsai, Toshiyuki / Nagashima, Wakana / Koshijima, Ichiro et al. | 2011
- 1
-
An analysis of the services and its relationship with the product development process in a manufacturing companyAlmeida, L.F. / Cauchick Miguel, P.A. et al. | 2011
- 1
-
Integration of transformable compact coating centers in assembly linesBöck, Jochen / Siegert, Jörg / Westkämper, Engelbert et al. | 2011
- 1
-
Constrained two stage general block algorithm for solving the constrained two-dimensional cutting problemSoegiharto, Stefanus / Prayogo, Dina Natalia / Irawan, Billy Steven et al. | 2011
- 1
-
Start-up of reconfigurable production machines with a service-oriented architectureAbel, M. / Klemm, P. / Silcher, S. / Minguez, J. et al. | 2011
- 1
-
The one-period inventory control for one-level assembly systems under uncertaintyHnaien, Faicel / Dolgui, Alexandre et al. | 2011
- 1
-
Simulation of an automotive supplier plant towards designing optimally flexible manufacturing systemsWeyrich, M. / Schnell, S. / Stratil, P. et al. | 2011
- 1
-
An exact solution algorithm for balancing simple U-type assemblyHazir, Öncü / Dolgui, Alexandre et al. | 2011
- 1
-
Load-oriented work organisation due to an ageing workforceGraichen, S. / Schmidt, D. / Zülch, G. et al. | 2011
- 1
-
Clustering approaches for managing similar items in the field of irregular and sporadic demand profiles: evidence from an empirical comparisonGamberini, R. / Lolli, F. / Rimini, B. et al. | 2011
- 1
-
Data envelopment analysis-based decision model for optimization of operator allocation in cellular manufacturing systemPark, J.H. / Cong, D.T. / Bae, H.R. / Ryu, K. / Lee, S. et al. | 2011
- 1
-
The integration of theory of constraints tools - case studyHadas, L. / Adamczak, M. / Cyplik, P. et al. | 2011
- 1
-
Using the fuzzy logic as tool to support the decision making of optimal moment to plan and operate the maintenance in production management engineeringMarcal, F.M. / Hatakeyama, K. et al. | 2011
- 1
-
A structural approach to develop measurement instrument for production environmental effortsSaghiri, S. et al. | 2011
- 1
-
The emerging role of EID in asia pacific in greening the economiesChiu, A.S.F. et al. | 2011
- 1
-
Revisiting the Lean Agile paradigm: an empirical study in the aerospace industryBrierley, Ian / Kim Hua Tan / Ming K Lim et al. | 2011
- 1
-
Enabling flexibility in supply chain management through the application of product design principles: a simulation studyAltfeld, N. / Abdelkafi, N. / Hinckeldeyn, J. / Kreutzfeldt, J. / Gust, P. et al. | 2011
- 1
-
A knowledge-based view of supply chain: absorptive capacity, cultural alignment and performanceYan, S. / Yang, B. et al. | 2011
- 1
-
Combining capacity Scaling and local branch approaches for the logistics network design problemKatayama, N. / Yurimoto, S. et al. | 2011
- 1
-
A decision support methodology to accommodate Eco Design and sustainable development into packaging design approachBuddeejeen, Jeeranuch / Kengpol, Athakorn / Tuominen, Markku et al. | 2011
- 1
-
Efficiency in automotive assembly lines due to minimal program induced adaptation (best practice)Sommer-Dittrich, T. / Ziegler, M. / Altemeier, S. et al. | 2011
- 1
-
Countertrade in supply chains: Refocusing strategic decision areas and business objectives by using AHPHofmann, Erik et al. | 2011
- 1
-
Helix of logisticsSpicher, Klaus / Fang, Dianjun et al. | 2011
- 1
-
Novel it solutions for increasing transparency in production and in supply chainsMonostori, L. / Ili-Zudor, E. / Kadar, B. / Karnok, D. / Pfeiffer, A. / Kemeny, Z. / Szathmari, M. et al. | 2011
- 1
-
Modeling risk in supply chain information flowMusa, S.N. / Wei, S. / Tang, O. et al. | 2011
- 1
-
Quality tools to support improvements in the textile industryVasconcelos, D.S. Cesar de / Fonseca Lima, M.B. da / Melo de Morais, T.C. / Silva, L.B. Da et al. | 2011
- 1
-
A new proposal for the description method of the relations between businessesSaito, Tetsu / Udagawa, Kingo / Mitsukuni, Koshichiro et al. | 2011
- 1
-
Comparative analysis of continuous improvement activities among small, medium and large companiesSoriano, F.R. / Oprime, P.C. / Lizarelli, F.L. / Braatz, D. et al. | 2011
- 1
-
Analysis of sales rhythm as a basis for human resource capacity planning in manual assembly systemsSpath, D. / Hämmerle, M. et al. | 2011
- 1
-
Process transparency: effects of a structured read point selectionHeinecke, G. / Lamparter, S. / Kunz, A. / Wegener, K. / Lepratti, R. et al. | 2011
- 1
-
Detection method for rubbing of sliding bearing in early stage by cepstrum analysisSako, Takashi / Yoshie, Osamu / Tokumo, Kotaro et al. | 2011
- 1
-
Flow-shop robotic scheduling with collaborative reinforcement learningStern, Helman / Arviv, Kfir / Edan, Yael et al. | 2011
- 1
-
Multiple quality criteria optimization of a wafer type solar cell diffusion processHou, Tung-Hsu et al. | 2011
- 1
-
Metamodel-based planning system for metal forming processesHitz, Raphael / Hora, Pavel et al. | 2011
- 1
-
An inventory control policy with tracking information for dual-channel supply chainsNagao, Hidehiro / Takahashi, Katsuhiko / Morikawa, Katsumi / Hirotani, Daisuke et al. | 2011
- 1
-
Shared learning for manufacturing excellence: a lean implementation case studySohal, A.S. / Page, K. et al. | 2011
- 1
-
A continuous representation and chaos theory based algorithm for solving facility layout problemOhmori, Shunichi / Yoshimoto, Kazuho / Ogawa, Kenshu et al. | 2011
- 1
-
Fuzzy-AHP approach for evaluation of green product designsWang, Xiaojun / Chan, Hing Kai et al. | 2011
- 1
-
Impact of unit load size on in-plant materials supply efficiencyHanson, R. / Finnsgard, C. et al. | 2011
- 1
-
Production workers' perception of standardisation - the relations between standardisation and stressClaesson, Torbjörn / Laring, Jonas / Nonas, Kathe et al. | 2011
- 1
-
A managerial decision support system for blood components forecasting in a brazilian regional blood centerSilva Filho, O.S. / Silva, R. / Cezarino, W. / Suguiy, T. et al. | 2011
- 1
-
One step away from the dead (33 mining of chile)Perez, R.F. et al. | 2011
- 1
-
A heuristic approach for nurse scheduling problemsMorizawa, K. / Kitada, M. / Hirabayashi, N. et al. | 2011
- 1
-
Tire facility location in latin american region by using monte carlo analytic hierarchy processSampayo, Ernesto / Torres, Fidel et al. | 2011
- 1
-
Measuring and enhancing the energy efficiency of material handling systemsHoppe, A. / Sommer, T. et al. | 2011
- 1
-
Scheduling for self-optimizing and adaptive manufacturing systemsKlöpper, Benjamin et al. | 2011
- 1
-
Integration between models of supply chain management with analysis BOCROliveira, T.K. / Rangel, D.A. / Leite, M.S.A. / Carmona, C.U.M. et al. | 2011
- 1
-
Multiple products dispatch planning with priority criteriaVargas, L.C. / Salazar, A.F. / Orejuela, J.P. / Bravo, J.J. et al. | 2011
- 1
-
A three-level RFID-based automation approach to enhance network competitivenessAggarwal, R. / Lim, M.K. / Tan, K. et al. | 2011
- 1
-
Reverse logistic supply chain of waste materials as a means of sustainable development - case study in a polish companyMalak, M. / Adamczak, M. / Pruska, Z. / Cyplik, P. et al. | 2011
- 1
-
Terminating simulation of inventory policy for medium-lifecycle products in a multi-stage supply chain systemHorng, H.C. / Chen, M.C. / Chen, S.C. et al. | 2011
- 1
-
Process innovation within industrial engineering with GraFEMGrienitz, V. / Schmidt, A.M. et al. | 2011
- 1
-
A new approach to biomimetics and problem solvingLe, Truong / Warschat, Joachim et al. | 2011
- 1
-
Operational comprehension of modern industrial engineeringStowasser, S. et al. | 2011
- 1
-
Optimizing the production and distribution system of bioenergy villagesUhlemair, Harald / Geldermann, Jutta et al. | 2011
- 1
-
Applications of statistical process control for controlling tension in substationsMelo de Morais, T.C. / Fonseca Lima, M.B. da / Vasconcelos, D.S. Cesar de / Silva, L.B. Da et al. | 2011
- 1
-
Economic (re)-balancing problem: A visualization of invisible hand and ellipse theory for multi-centerMatsui, Masayuki et al. | 2011
- 1
-
A tool for strategies in enactive managementGarcia de la Cerda, O. / Salazar Salazar, A. et al. | 2011
- 1
-
Proposal of reorder point satisfying allowable shortage rate under limited demand informationTakemoto, Yasuhiko / Arizono, Ikuo et al. | 2011
- 1
-
A framework for automatic multi-agents collaboration in target recognition tasksTkach, Itshak / Edan, Yael / Nof, Shimon Y. et al. | 2011
- 1
-
The integration of material requirements planning approaches with lean productionHicks, C. / Brolsma, J. / Klingenberg, W. et al. | 2011
- 1
-
Integrated manufacturing technology laboratoryBerman, S. / Fink, L. et al. | 2011
- 1
-
Intellectual property in new product developmentLabouriau, F.C. / Naveiro, R.M. et al. | 2011
- 1
-
Management process methodology integrated with product platform strategy and product architecture strategy in product lineupTamaki, K. / Suzuki, J. / Kuwayama, T. et al. | 2011
- 1
-
Development strategies of dairy products of companies of the state of Sao Paulo (Brazil)Silva, A.L. / Santini, G.A. / Queiroz, T.R. et al. | 2011
- 1
-
Palm virtual ten keys system using dynamic image processingYamakawa, Akira / Usuki, Jun et al. | 2011
- 1
-
ProductMap: a visual tool to aid product designFigueiredo, C.M. / Naveiro, R.M. et al. | 2011
- 1
-
Machine simulation for operational decision support using colored Petri NetsSantos, E.A.P. / Rocha-Loures, E.F. / Busetti, M.A. / Ferreira, L.R. / Pierezan, R. et al. | 2011
- 1
-
Real time item monitoring with PNRDTavares, J.J.Z.S. / Pereira, T.S. et al. | 2011
- 1
-
Automated visual inspection for thermal fuseLiu, Mei-Ling / Lin, Rong-Ho / Tien, Fang-Chih / Chen, Ling Hsiu / Lin, Yangkuei et al. | 2011
- 1
-
General optimization schemes for scheduling unrelated machines with rejectionShabtay, D. / Gaspar, N. / Kaspi, M. et al. | 2011
- 1
-
Product family modelling for manufacturing planningJoergensen, K.A. / Petersen, T.D. / Nielsen, K. / Habib, T. et al. | 2011
- 1
-
Service purchasing and value creation: Towards integrated purchasing practicesHallikas, J. / Immonen, M. / Pynnönen, M. / Mikkonen, K. et al. | 2011
- 1
-
A conflict detection and resolution algorithm for airport surface operationsChen, X.W. / Landry, S.J. / Nof, S.Y. et al. | 2011
- 1
-
Configuration and structure of the IFF learning factory advanced industrial engineeringRiffelmacher, Philipp / Dinkelmann, Max / Westkämper, Engelbert et al. | 2011
- 1
-
Comparison of CONWIP, TOC and CWIPL in job shop environmentNahavandi, Nasim et al. | 2011
- 1
-
A Lagrangean approach to dynamic lotsizingGrubbström, Robert W. et al. | 2011
- 1
-
Class content design and development of production planning and inventory management in virtual manufacturing businessKakehi, Munenori / Hashimoto, Naomi / Watanabe, Ichie / Sun, Jing / Ishi, Nobuaki / Tamaki, Kinya et al. | 2011
- 1
-
A route card modeling technique for complex assemblyCohen, Y. et al. | 2011
- 1
-
Realization of parallel kinematic wood machining centre with integrated workpiece handlingHoffmeister, H.W. / Loeis, K. / Gerdes, A. et al. | 2011
- 1
-
A new concept for ergonomic design of a transfer board on transfer assistance in nursingTakanokura, Masato / Endo, Makoto / Kawakami, Masaru et al. | 2011
- 1
-
Improving the process of bed management in a children hospitalBen-Arieh, D. / Wu, C.H. et al. | 2011
- 1
-
Towards a recommendation system for the use of web-based collaborative tools in factory planningClauß, M. / Müller, E. et al. | 2011
- 1
-
Risk management of CPM networks under randomness and fuzziness based on conditional value-at-riskHasuike, T. et al. | 2011
- 1
-
The management of innovation in fruit productionSilva, A.L. / Santini, G.A. / Queiroz, T.R. / Lourenzani, W.L. et al. | 2011
- 1
-
Impacts of minimum activity level and multi-sourcing on product family and supply chain designBaud-Lavigneyz, Bertrand / Agardz, Bruno / Penz, Bernard et al. | 2011
- 1
-
Time dependent traveling salesman problem with time windowsArigliano, A. / Ghiani, G. / Guerriero, E. et al. | 2011
- 1
-
Packaging design for logistics: a new integrated approachAzzi, A. / Battini, D. / Persona, A. / Sgarbossa, F. et al. | 2011
- 1
-
GS1 standards in the context of sustainable development - case studyCyplik, P. / Sokolowski, G. / Hadas, L. et al. | 2011
- 1
-
A proposal of logistic services innovation strategy for a mining company and its key suppliersCordova, F.M. / Duran, C. / Sepulveda, J. et al. | 2011
- 1
-
Production leveling in an adhesive compound manufacturer: an action researchAraujo, L.F. / Queiroz, A.A. et al. | 2011
- 1
-
Adjusting process planning activities to context-specific requirements in low-cost-countriesMundhenke, H.G. / Platts, K.W. et al. | 2011
- 1
-
Stewardship tools for production and operations managementHeidrich, O. / Hicks, C. et al. | 2011
- 1
-
Reconfigurable manufacturing services for web-based collaboration systemsLee, S. / Ryu, K. et al. | 2011
- 1
-
Guideline to select regression models in industrial processesSant'Anna, A.M.O. et al. | 2011
- 1
-
New product introduction by using Hoshin KanriVeza, I. / Gjeldum, N. / Mladineo, M. / Stefanic, N. et al. | 2011
- 1
-
Modeling and simulation of value added networks under consideration of individual target systems using software agentsLanza, G. / Book, J. et al. | 2011
- 1
-
New low-effort method for quickly determining the most economical assembly system structure for the dynamic design of transformable assembly systemsSpath, Dieter / Scholtz, Oliver et al. | 2011
- 1
-
Management of fuzzy front end: case studies in Brazilian medical device industryMendes, G.H.S. / Toledo, J.C. et al. | 2011
- 1
-
Structural and functional views of mechatronic productsNielsen, Kjeld / Petersen, Thomas D. / Jorgensen, Kaj A. et al. | 2011
- 1
-
Effect of addition of Hafnium (Hf) on the mechanical behavior and wear resistance of zinc-aluminum alloys, ZA5Zaid, A.I.O. / Mostafa, A.O.M. et al. | 2011
- 1
-
Optimal identification of multidimensional polynomials describing systematic errors in CNC machinesBelforte, G. / Bohez, E.L.J. / Effendy, N. et al. | 2011
- 1
-
A simulated annealing algorithm for scheduling the banknote printing plant at the central bank of ColombiaNino, K. / Mejia, G. et al. | 2011
- 1
-
Fast and effective evolutionary algorithm for multiobjective process planning and scheduling problemZhang, Wenqiang / Wei, Xin / Fujimura, Shigeru et al. | 2011
- 1
-
Development of an aggregate planning model with financial considerationsCastaneda, L.K. / Orejuela, J.P. / Manotas, D.F. et al. | 2011
- 1
-
The model of reconfiguration of production process offering a wide range of products - case studyDomanski, R. / Hadas, L. / Cyplik, P. / Miszon, B. et al. | 2011
- 1
-
Transferring industrial concepts to healthcare service network managementVilla, Agostino / Antonelli, Dario / Bellomo, Dario et al. | 2011
- 1
-
Methodology to estimate production capacity of mass manufacturing restaurantSalcedo, M.A. / Giraldo, L.E. / Orejuela, J.P. et al. | 2011
- 1
-
Modeling balanced scorecard using anp for electronic commerceTorres, D. / Quezada, L. / Soto, I. et al. | 2011
- 1
-
Smart devices for context-aware maintenance applicationsLucke, Dominik / Constantinescu, Carmen / Westkämper, Engelbert et al. | 2011
- 1
-
Cycle time and variability analysis under asic fabrication environmentKabak, K.E. / Heavey, C. et al. | 2011
- 1
-
Disk laser welding of Ti6Al4V alloyMastrocinque, E. / Corrado, G. / Caiazzo, F. / Pasquino, N. / Sergi, V. / Acerra, F. et al. | 2011
- 1
-
A cross-training policy for a U-shaped assembly line: a simulation studyJun Gong / Liu, Wenxin / Sen Zhang et al. | 2011
- 1
-
Adaptive cooperation and information management for efficient deployment in productionThiel, S. / Pfannstiel, J. / Bierkandt, J. et al. | 2011
- 1
-
Incorporating human factors into the AMT selection: a framework and processBorges, L.A. / Tan, K.H. et al. | 2011
- 1
-
Dynamic assessment of working time modelsZülch, G. / Stock, P. et al. | 2011
- 1
-
Choosing effective operational rules to reduce the cycle time in semiconductor manufacturing fabs: a queueing network approachAkhavan-Tabatabaei, Raha / Ruiz, Carlos Felipe et al. | 2011
- 1
-
The model of business and environment oriented assessment of processesHadas, Lukasz / Stachowiak, Agnieszka / Cyplik, Piotr / Fertsch, Marek et al. | 2011
- 1
-
Design and evaluation of the improvement of a motor wayMontt Veas, Cecilia / Quezada Llanca, Luis / Huenchunan Mancilla, Orlando et al. | 2011
- 1
-
The antecedents of supply strategyLintukangas, K. / Kähkönen, A-K. / Virolainen, V.M. et al. | 2011
- 1
-
Integrating planning and operations, technology and people in industrial engineeringRiedel, R. / Müller, E. et al. | 2011
- 1
-
The proposal for a method of lean manufacturing implementation to support the quality management system: application to an organization in the aeronautical industryOliveira Cunha, Luciane de / Murta Alves, Joao / Estevam de Souza, Joao Paulo et al. | 2011
- 1
-
Four level approach to design companywide production networksKlinkner, Raimund / Köhler, Albrecht / Becker, Roland / Winkler, Tanja / Dürksen, Dietrich et al. | 2011
- 1
-
A supply chain perspective on order penetration point positioningPires, Silvio R.I. / Scavarda, Luiz Felipe / Klingebiel, Katja et al. | 2011
- 1
-
Interdependency demand - supplyHanusch, S. / Neumann, C. / Schweiger, J. et al. | 2011
- 1
-
Modeling converging material flows in the supply chainBeck, S. / Schmidt, M. / Nyhuis, P. et al. | 2011
- 1
-
Decision-making in R&D projects, a framework based on fuzzy logicHassanzadeha, S. / Gourca, D. / Marmiera, F. / Bougaretb, S. et al. | 2011
- 1
-
Decentralized job-shop control for the maintenance of aircraft enginesRemenyi, C. / Staudacher, S. / Becker, H. / Dinc, S. / Manejev, R. / Fichtelmann, R. et al. | 2011
- 1
-
Comparison of fuzzy control charts and traditional control charts for attributesChud, V.I. / Osorio, J.C. / Martinez, N. et al. | 2011
- 1
-
Superposed closed-control loop for the polymer based laser sintering technologyEschey, C. / Westhaeuser, S. / Zaeh, M.F. et al. | 2011
- 1
-
Potential small-scale CHP-plant manufacturers and their business networks in bioenergyLehtovaara, M.J. / Kokkonen, K.O. / Rousku, P.J. / Kässi, T.S. et al. | 2011
- 1
-
Knowledge model to support feedback in engineeringEckstein, H. / Eichert, J. / Kuzinna, S. et al. | 2011
- 1
-
Elementary PNRD extended to assembly and disassembly linesTavares, J.J.P.Z.S. / e Silva, G.P. et al. | 2011
- 1
-
Production scheduling: an approach based on Petri Nets and graphs search. Study case: AGP-ColombiaCardona, Julian / Mejia, Gonzalo / Lozano, Alvaro et al. | 2011
- 1
-
Effect of titanium or titanium + boron addition on the formability of commercially pure aluminumZaid, A.I.O. / Al-Qawabah, S.M.A. / Nazzal, Mohammad A. et al. | 2011
- 1
-
Chaotic methods applied to the marriage in honey bees optimization metaheuristicPalominos, Pedro / Parada, Victor / Alfaro, Miguel / Ortega, Carla / Gatica, Gustavo et al. | 2011
- 1
-
Reactive manufacturing control using the Ant Colony approachStock, P. / Zülch, G. et al. | 2011
- 1
-
Optimal cost control policy for product recovery in closed-loop supply chainsNakashima, K. / Loomba, A.P.S. et al. | 2011
- 1
-
Modeling cost benefit analysis of inspection in a production lineTirkel, I. / Rabinowitz, G. et al. | 2011
- 1
-
Analysis of waiting time of demand requiring multiple items under a base stock policyMorita, N. / Nakade, K. et al. | 2011
- 1
-
Improvement of particle swarm optimization: proposal of R-best model and parameter adjustment with consideration to searching phase and stateChoi, Hanyong / Ohmori, Shunichi / Yoshimoto, Kazuho et al. | 2011
- 1
-
Sorting process location problem in disassembly system configurationOkudera, Y. / Yamada, T. / Masui, T. / Itsubo, N. et al. | 2011
- 1
-
Consequences of the demographic change for future production and technology processes using the example of the automobile indutstryKeil, M. / Spanner-Ulmer, B. et al. | 2011
- 1
-
Sustainable production virus analysis - case studyCyplik, P. / Hadas, L. / Wronski, B. et al. | 2011
- 1
-
Loading and scheduling problem in circular flow line with multi-resource stages under collision considerationsGrieco, A. / Nucci, F. et al. | 2011
- 1
-
A study for forecasting the quantity of household wasteMaruyama, Yukio / Yamamoto, Hisashi / Baba, Shota et al. | 2011
- 1
-
Environmental sustainability and life cycle assessment for small businessesHeidrich, O. et al. | 2011
- 1
-
Mobile assistance for energy-efficient production - a scenario approachSchlund, Sebastian / Gerlach, Stefan / Schweizer, Wolfgang et al. | 2011
- 1
-
Factors and influences by the workforce for sustainable management systemsHeidrich, O. / Harvey, J. et al. | 2011
- 1
-
A new method of diagnostic analysis for reducing innovation process timeSlama, A. et al. | 2011
- 1
-
Innovation trends in the brazilian foundry industry: a survey with small and medium size companiesLima, A.C.S. / Naveiro, R.M. et al. | 2011
- 1
-
Assessing the openness degree of knowledge supply chainsScozzi, B. / Bellantuono, N. / Pontrandolfo, P. et al. | 2011
- 1
-
Design of open innovative service developement system using cloud computingShin, KwangSup / Kwon, Baek-Chul / Kang, Suk-Ho et al. | 2011
- 1
-
A study about the performance of time series models for the analysis and forecasting of agricultural pricesOliveira, S.C. / Pereira, L.M.M. / Hanashiro, J.T.S. / Val, P.C. et al. | 2011
- 1
-
Revenue sharing contract in an N-stage supply chain considering reliabilitiesFeng, X.H. / Moon, I.K. / Ryu, K.Y. et al. | 2011
- 1
-
The level of integration of clusters in Wielkopolska regionGolinska, P. et al. | 2011
- 1
-
Lean procurement from low cost countries: an innovative frameworkCostantino, F. / Minicis, M. de / Gravio, G. di et al. | 2011
- 1
-
Modeling a dynamic process of identifying individual CompetenceSefiani, Naoufal / Boumane, Abderazak / Campagne, Jean-Pierre / Boumani, Driss et al. | 2011
- 1
-
Sensitivity analysis in fleet routing via approximate dynamic programmingDotti, Elmer / Milioni, Armando Zeferino et al. | 2011
- 1
-
Supporting global collaborative teams through innovative web 2.0 technologiesDempsey, M. / Gormley, P. / Riedel, R. et al. | 2011
- 1
-
Discussion of lot sizing approaches and their influence on economic productionNyhuis, P. / Muenzberger, B. / Schmidt, M. et al. | 2011
- 1
-
Logistic decoupling as a measure for increasing delivery performance of a multi-variant series productionNyhuis, P. / Windt, K. / Bertsch, S. / Beck, S. / Eilmann, J. et al. | 2011
- 1
-
Application of T2 control charts in autocorrelated processes of an automotive manufacturerRequeijo, J.G. / Cordeiro, J. et al. | 2011
- 1
-
Understanding the determinants of SME ISO 9000 success: towards a classification of work environmentMaatgi, M. / Denton, P.D. et al. | 2011
- 1
-
Faults detection of wound rotor induction motor with principal components analysis methodRamahaleomiarantsoa, J.F. / Heraud, N. / Sambatra, E.J.R. / Razafimahenina, J.M. et al. | 2011
- 1
-
Flexibility instruments in SME: an empirical studyGanß, M. / Baum, H. / Schütze, J. / Ivanova, R. et al. | 2011
- 1
-
Value Stream engineering. Four Paradigms for process design in industrial engineeringSchweizer, W. et al. | 2011
- 1
-
Analysis of optimal switching for limited-cycle problem with multiple periodsSun, Jing / Yamamoto, Hisashi / Matsui, Masayuki / Man, ZuoCai et al. | 2011
- 1
-
On the interface between engineering and manufacturing managementDekkers, R. / Chang, Carl M. / Kreutzfeldt, J. et al. | 2011
- 1
-
Cost estimation of jet engine parts using integration of hierarchical feature modeling and manufacturing knowledgeSormaz, Dusan / Judd, Robert / Masel, Dale et al. | 2011
- 1
-
System analysis and reengineering based on simultaneous optimization of multiple core manufacturing sub-systems: process, information, materials and cultureBacioiu, G.M. / Oleskow-Szlapka / Stachowiak, A. et al. | 2011
- 1
-
The prioritization of the unit loads in the semiconductor/LCD fabrication facilityChung, Jaewoo / Kim, Kwanghee / Son, Seolhui et al. | 2011
- 1
-
Simulation of capacity and cost for planning of future process chainsLange, J. / Bergs, F. / Weigert, G. / Wolter, K.J. et al. | 2011
- 1
-
Product line selection and pricing under uncertaintyLuo, X.G. / Kwong, C.K. / Tang, J.F. et al. | 2011
- 1
-
Advanced planning and scheduling (APS) survey on Brazilian industryGiacon, E. / Rego, J.R. / Mesquita, M.A. et al. | 2011
- 1
-
Cross-training and mobility of workers in service organizationsBukchin, Y. / Tzur, M. / Inbar, I. et al. | 2011
- 1
-
Cost-time profiles with holding costs and value-added metricsEnns, S.T. et al. | 2011
- 1
-
Applying a production follow-up model based on project buffer managementChauvigne, A. / Colin, J. / Kalev, A. et al. | 2011
- 1
-
Approach for load-adapted optimization of generative manufactured lattice structuresReinhart, G. / Teufelhart, S. et al. | 2011
- 1
-
Analysis of human reliability in manual assembly operationsKern, Christian / Refflinghaus, Robert et al. | 2011
- 1
-
Proposal of a procedure to redesign location of parts for assembly process of a product including predetermination of operation timeArakawa, Masahiro et al. | 2011
- 1
-
Methodology for a holistic view of assembly expendituresRusitschka, F. / Binz, F. / Bunte, J. et al. | 2011
- 1
-
Lean and psychosocial work environment in manufacturingEdwards, Kasper / Thye, Nina / Nielsen, Anders P. et al. | 2011
- 1
-
A new slack protection strategy in dynamic project schedulingSuway, Haruhiko / Moritaz, Daisuke / Sandoh, Hiroaki et al. | 2011
- 1
-
Activity recognition in plant: investigation on actions for preventing human errorZhang, Huiquan / Kim, Wonjung / Yoshie, Osamu et al. | 2011
- 1
-
Resource efficiency check of small and medium sized manufacturing companiesSteinhilper, Rolf / Boehner, Johannes / Slawik, Stefan et al. | 2011
- 1
-
Describing product-service systems with functional analysisBaureis, D. / Wagner, L. / Warschat, J. et al. | 2011
- 1
-
Identification of the main drivers of market success for products and services in business-to-businessMatt, D.T. / Farina, G. et al. | 2011
- 1
-
Productive efficiency by certification in the Brazilian´s cowhide chainRenofio, A. / Oliveira, J.A. / Alvarenga, R.P. / Queiroz, T.R. et al. | 2011
- 1
-
Supply chain didactic testing bench with automated planning toolTavares, J.J.P.Z.S. / Fonseca, J.P.S. et al. | 2011
- 1
-
A framework for adaptive data integration in digital productionMeisen, Tobias / Reinhard, Rudolf / Schilberg, Daniel / Jeschke, Sabina et al. | 2011
- 1
-
Product-related enablement of next generation supply chain managementLentes, J. / Eckstein, H. et al. | 2011
- 1
-
Efficiency estimation of lifo storage systems managed with Automated Guided Vehicles (AGVs)Ferrara, A. / Gebennini, E. / Grassi, A. / Rimini, B. et al. | 2011
- 1
-
A holistic approach to demand and capacity management in the automotive industryWagenitz, Axel / Liebler, Klaus M. / Schürrer, Sascha et al. | 2011
- 1
-
The integration of risk management into maintenance project approaches for manufacturing SMEsHajjaji, M. / Denton, P.D. et al. | 2011
- 1
-
A mathematical model of product design through integral architectureJiang, D. / Shinzato, T. / Kaku, I. / Yin, Y. et al. | 2011
- 1
-
Knowledge management in product design: the Baja projectNaveiro, Ricardo M. et al. | 2011
- 1
-
New PN model of FMS with sequential flexibility of resource allocationAziz, M.H. / Bohez, Erik L.J. / Pisuchpen, Roongrat / Parnichkun, Manukid / Dailey, Mathew N. / Saha, Chanchal et al. | 2011
- 1
-
New artifact for minimal worst case prediction systematic error identification in 5-AXIS CNC machine toolsChung, N.V. / Bohez, E.L.J. / Belforte, G. et al. | 2011
- 1
-
The design object model of mechanical parts for robotic assembly by using CAD dataNagai, Tatsuichiro / Aramaki, Shigeto / Akiyama, Hidehisa et al. | 2011
- 1
-
An iterated beam search solution to the combined car sequencing & level scheduling problemYavuz, M. / Byrd, Harry F. jun. et al. | 2011
- 1
-
Scheduling hoppers filling operations in the food industry concentratesTorne, L.M. / Oreuela, J.P. / Ramirez, G.S. et al. | 2011
- 1
-
The integration of available technology into successful business models for health promotion networksKicherer, Florian / Zähringer, Daniel / Meiren, Thomas et al. | 2011
- 1
-
Finite element simulation of a hybrid forming process: Deep drawing and superplastic formingNazzal, M.A. / Zaid, Adnan I.O. / Al-Qawabah, S.M.A. et al. | 2011
- 1
-
Development of an automated reconfigurable device for affordable fixturingJonsson, M. / Murray, T. / Kihlman, H. et al. | 2011
- 1
-
Increasing resource-efficiency in production with energy constraints by discrete-event simulation.Horn, S. / Ameling, M. / Weigert, G. / Winkler, M. et al. | 2011
- 1
-
Creation of the IMMA manikin with consideration of anthropometric diversityBertilsson, E. / Hanson, L. / Högberg, D. / Rhen, I.M. et al. | 2011
- 1
-
Structural equation modelling of human factors and their impact on productivity of cellular manufacturingHaraguchi, Harumi / Inoue, Ken / Dong, Yanwen et al. | 2011
- 1
-
Manufacturing challenges associated with the introduction of new powertrain vehiclesDiffner, B. / Björkman, M. / Johansen, K. et al. | 2011
- 1
-
Configuration of a digital factory for autonomous virtual manufacturingMatsuda, M. / Kasiwase, K. / Sudo, Y. et al. | 2011
- 1
-
Group decision support for locating an industrial factoryElfvengren, K. / Seppälä, P. / Korpela, J. / Tuominen, M. et al. | 2011
- 1
-
Cross-sectoral innovation networks for knowledge-intensive products and servicesLau, A. / Fischer, T. et al. | 2011
- 1
-
Integration of ergonomics-management in production systemsBierwirth, M. / Bruder, R. / Schaub, K. et al. | 2011
- 1
-
Selection of communication technologies in mining using the analytic network processMolina, S. / Quezada, L. / Soto, I. et al. | 2011
- 1
-
The study of chaotic behavior of demand information sharing supply chain inventory systemWang, Jing / Han, Weiwei et al. | 2011
- 1
-
Integrated models and tools for planning logistic networksManzini, Riccardo / Bortolini, Marco / Accorsi, Riccardo / Montecchi, Matteo et al. | 2011
- 1
-
Implementation of the SCOR model for improvement: hybrid (push-pull) strategy in roller bearing production (case study)Pawlewski, P. / Hadas, L. / Fertsch, M. / Pasek, Z.J. et al. | 2011
- 1
-
Structure dynamics control-based supply chain planning with multi-dimensional dynamic characteristicsIvanov, Dmitry / Sokolov, Boris et al. | 2011
- 1
-
Supply chain management in regenerative medicine manufacturingFoley, L.A. / Hicks, C. / O'Neill, P. et al. | 2011
- 1
-
Improvement of a garbage collection systemSilva Torreblanca, Gicela / Fuentes Flores, Ignacio / Montt Veas, Cecilia et al. | 2011
- 1
-
Decision-aided tool for sustainble inventory controlGhorbel, N. / Duta, L. / Addouche, S.A. / El Mhamedi, A. et al. | 2011
- 1
-
New gas-cyclone with coarse- and fine dust separation zoneBrunnmair, E. / Harler, K. / Dunst, F. et al. | 2011
- 1
-
The effect of backlog and sequence deviation on schedule reliabilityLödding, H. / Kuyumcu, A. et al. | 2011
- 1
-
Quantitative framework for industrial maintenance policy developmentFaccio, M. / Persona, A. / Sgarbossa, F. / Zanin, G. et al. | 2011
- 1
-
An empirical analysis on the role of communication in quality managementZeng, J. / Phan, C.A. / Matsui, Y. et al. | 2011
- 1
-
Investigation about quality in the Brazilian aerospace industrySouza, J.P.E. / Alves, J.M. / Silva, M.B. et al. | 2011
- 1
-
Improving emergency department operations through generating and evaluating simulation scenariosKaner, M. / Gadrich, T. / Dror, S. / Marmor, Y.N. et al. | 2011
- 1
-
Supporting the multi-domain plant engineering process using engineering knowledge from formalized model-based librariesLi, Fang / Gilz, Torsten / Steinhauer, Markus / Vogel-Heuser, Birgit / Eigner, Martin / Shea, Kristina et al. | 2011
- 1
-
Site selection strategies for small and medium sized manufacturing enterprises in a globalized worldWeyrich, M. / Grienitz, V. / Adlbrecht, G. et al. | 2011
- 1
-
Improving due date reliability of steel mills - identification of punctuality potentialsWindt, Katja / Nyhuis, Peter / Kolev, Ivelin / Gebhardt, Nicolas / Eilmann, Jörn / Fronia, Philip / Bertsch, Sebastian et al. | 2011
- 1
-
Classification of assembly parts for procurement processes and production logisticsKoch, Steffen / Spath, Dieter et al. | 2011
- 1
-
A study on scheduling and rescheduling problem of the FMC (flexible manufacturing cell) during transient disturbance period with pallet constraintsNa, Hongbum / Seo, Jinwu / Park, Jinwoo et al. | 2011
- 1
-
Practice of building hybrid planning and shop flow control systems - case studyHadas, L. / Cyplik, P. et al. | 2011
- 1
-
Models for 3D inkjet printing - Simulation and multimaterialKellner, I.N. / Zaeh, M.F. et al. | 2011
- 1
-
New hybrid Petri Net, lowest bound cut algorithm for job shop schedulingWongwiwat, Asawin / Bohez, Erik L.J. / Seeluangsawat, Roongrat et al. | 2011
- 1
-
Modeling and analyzing integrated autonomously controlled production and transport processesScholz-Reiter, B. / Görges, M. / Jagalski, T. et al. | 2011
- 1
-
Tool-coatings for temperature monitoring in turning processesBiermann, D. / Pantke, K. / Tillmann, W. / Herper, J. et al. | 2011
- 1
-
Design of flexible and ergonomic material handling systems for large and heavy goodsMatt, D.T. / Fraccaroli, D. / Franzellin, V.M. / Rauch, E. et al. | 2011
- 1
-
Integrated process planning and scheduling - Multi-agent system with ant algorithmWong, T.N. / Zhang, S.C. / Zhang, L.P. / Wan, S.Y. et al. | 2011
- 1
-
Production planning and scheduling for multistage composite processOkamoto, A. / Sugawara, M. et al. | 2011
- 1
-
An inference method of management operations using Bayesian networksKataoka, T. / Kanezashi, M. / Morikawa, K. / Takahashi, K. et al. | 2011
- 1
-
Dimensional analysis of process parameters in selective laser melting of Ti-6Al-4V alloyZaid, A.I.O. / Al-Qawabah, S.M.A. / Nazal, Mohammad A. et al. | 2011
- 1
-
Modularize mechatronic products for mass customizationHabib, Tufail / Nielsen, Kjeld / Joergensen, Kaj A. et al. | 2011
- 1
-
Design method for reconfigurable assembly processes and equipmentMüller, Rainer / Esser, Martin / Eilers, Jan et al. | 2011
- 1
-
The role of university continuing education in supporting continuous learning of individuals and renewal capability of organizationsHirvonen, Lea / Valkeapää, Sari / Orpana, Veikko et al. | 2011
- 1
-
Absenteeism as a major cause of bottlenecks in serial production processesCohen, Y. et al. | 2011
- 1
-
A reference model for factory engineeringConstantinescu, Carmen et al. | 2011
- 1
-
Approaches for planning and operation of adaptable factoriesAckermann, J. / Börner, F. / Hopf, H. / Horbach, S. / Müller, E. et al. | 2011
- 1
-
Allocation problem and storage assignment in a fast pick area of an order picking systemAccorsi, Riccardo / Manzini, Riccardo / Bortolini, Marco / Gamberi, Mauro / Pareschi, Arrigo et al. | 2011
- 1
-
Case study on production waste optimizationGolinska, Paulina / Majewski, Pawel et al. | 2011
- 1
-
Enhancing monitoring of enterprise processes by integrated online performance measurementKaradgi, S. / Metz, D. / Grauer, M. et al. | 2011
- 1
-
Robust optimization of a multi-period production planning problem under uncertaintyBen-Tal, A. / Golany, B. / Rozenblit, M. et al. | 2011
- 1
-
Design requirements for designing responsive modular manufacturing systemsJoergensen, Steffen Nordahl / Madsen, Ole / Nielsen, Kjeld / Joergensen, Kaj A. et al. | 2011
- 1
-
Classification for arrangements of small technology-based firms: preliminar analysis of a case study in brazilCosta, Helio Lemes jun. et al. | 2011
- 1
-
A model for measuring and sorting the innovation capability of manufacturing enterprises: an application in chileSepulveda, J. / Vega, C. / Gonzalez, J. et al. | 2011
- 1
-
Supply network planning for memory module industry by distributed parallel computingHuang, Chin-Yin / Chen, Wu-Lin / Yeh, Sz-Chang et al. | 2011
- 1
-
Coordinated planning and scheduling in supply chains with feedback mechanismVancza, J. / Egri, P. et al. | 2011
- 1
-
A dynamic transshipment policy in a lost sales inventory systemWei, S. / Tang, O. / Wang, D. et al. | 2011
- 1
-
Rebate and option contracts in a supply chainGomez Padilla, A. / Mishina, T. et al. | 2011
- 1
-
An efficient search algorithm for the dynamic collection plan with stochastic demandIshigaki, Aya / Hirakawa, Yasuhiro et al. | 2011
- 1
-
Strategic capabilities as enablers for innovation in production systemsJentsch, D. / Riedel, R. / Günther, L. / Müller, E. et al. | 2011
- 1
-
Product change projects in companies with multi-variant serial productionWinkler, H. / Slamanig, M. et al. | 2011
- 1
-
Impact of delivery profiles on the stability of delivery schedulesSchöneberg, T. / Suhl, L. / Koberstein, A. et al. | 2011
- 1
-
Standardization and optimization of maintenance processes in lean manufacturing systemsMatyas, Kurt / Sihn, Wilfried et al. | 2011
- 1
-
Design procedures for variable sampling inspection plans with screening indexed by Taguchi's quality loss under consideration of minimizing average total inspectionArizono, Ikuo / Takemoto, Yasuhiko et al. | 2011
- 1
-
Quantitative model for the design of a strategy mapQuezada, Luis E. / Quinteros, Diana et al. | 2011
- 1
-
Information management for production system design with a new portfolio approachBruch, J. / Bellgran, M. / Angelis, J. et al. | 2011
- 1
-
Challenges in integrating requirements management with PLMPapinniemi, J. / Hannola, L. / Maletz, M. et al. | 2011
- 1
-
Dynamic cubic neural network for demand forecastingChu, Bong-sung / Cao, De-bi et al. | 2011
- 1
-
Meta-heuristic optimization based on P-time Petri Nets model for deadlock avoidance in flexible manufacturing systemsAbdiche, F. / Mesghouni, K. / Sekhri, L. et al. | 2011
- 1
-
Path planning for electrostatic powder painting in the configuration spaceCheng, T.M. / Huang, S.K. et al. | 2011
- 1
-
Measurement of radial-axial ring rolling by using image processing methodsMeier, H. / Briselat, J. / Flick, H. / Kreimeier, D. et al. | 2011
- 1
-
Cross technology interoperability for CNC metal cutting machinesSafaieh, M. / Nassehi, A. / Newman, S.T. et al. | 2011
- 1
-
Obstacle recognition on handling route using investigation robotsTomonori, Shimizutani / Jun, Usuki et al. | 2011
- 1
-
Collaborative control theory for robotic systems with reconfigurable end effectorsBerman, S. / Nof, S.Y. et al. | 2011
- 1
-
Development methodology for production scheduling systems using business process modelingFujimura, S. et al. | 2011
- 1
-
Machine learning in predicting and explaining failure using class-imbalanced FAB dataBelyavin, H. / Lerner, B. et al. | 2011
- 1
-
A cutting stock problem variant in textiles industriesCaricato, P. / Gianfreda, D. / Grieco, A. et al. | 2011
- 1
-
Maintainable model based analysis of manufacturing systemsListon, Paul / Young, Paul / Heavey, Cathal et al. | 2011