Towards a risk register for natural capital (Englisch)
- Neue Suche nach: Mace, Georgina M.
- Neue Suche nach: Hails, Rosemary S.
- Neue Suche nach: Cryle, Philip
- Neue Suche nach: Harlow, Julian
- Neue Suche nach: Clarke, Stewart J.
- Neue Suche nach: Mace, Georgina M.
- Neue Suche nach: Hails, Rosemary S.
- Neue Suche nach: Cryle, Philip
- Neue Suche nach: Harlow, Julian
- Neue Suche nach: Clarke, Stewart J.
- Neue Suche nach: Manning, Peter
In:
Journal of Applied Ecology
;
52
, 3
;
641-653
;
2015
- Aufsatz (Zeitschrift) / Elektronische Ressource
-
Titel:Towards a risk register for natural capital
-
Beteiligte:Mace, Georgina M. ( Autor:in ) / Hails, Rosemary S. ( Autor:in ) / Cryle, Philip ( Autor:in ) / Harlow, Julian ( Autor:in ) / Clarke, Stewart J. ( Autor:in ) / Manning, Peter ( Herausgeber:in )
-
Erschienen in:Journal of Applied Ecology ; 52, 3 ; 641-653
-
Verlag:
-
Erscheinungsdatum:01.06.2015
-
Format / Umfang:13 pages
-
ISSN:
-
DOI:
-
Medientyp:Aufsatz (Zeitschrift)
-
Format:Elektronische Ressource
-
Sprache:Englisch
-
Schlagwörter:
-
Datenquelle:
Inhaltsverzeichnis – Band 52, Ausgabe 3
Zeige alle Jahrgänge und Ausgaben
Die Inhaltsverzeichnisse werden automatisch erzeugt und basieren auf den im Index des TIB-Portals verfügbaren Einzelnachweisen der enthaltenen Beiträge. Die Anzeige der Inhaltsverzeichnisse kann daher unvollständig oder lückenhaft sein.
- 539
-
On formally integrating science and policy: walking the walkNichols, James D. / Johnson, Fred A. / Williams, Byron K. / Boomer, G. Scott et al. | 2015
- 544
-
Developing fencing policies for dryland ecosystemsDurant, Sarah M. / Becker, Matthew S. / Creel, Scott / Bashir, Sultana / Dickman, Amy J. / Beudels‐Jamar, Roseline C. / Lichtenfeld, Laly / Hilborn, Ray / Wall, Jake / Wittemyer, George et al. | 2015
- 552
-
Comparing impacts of alien plants and animals in Europe using a standard scoring systemKumschick, Sabrina / Bacher, Sven / Evans, Thomas / Marková, Zuzana / Pergl, Jan / Pyšek, Petr / Vaes‐Petignat, Sibylle / van der Veer, Gabriel / Vilà, Montserrat / Nentwig, Wolfgang et al. | 2015
- 562
-
An examination of the accuracy of a sequential PCR and sequencing test used to detect the incursion of an invasive species: the case of the red fox in TasmaniaRamsey, David S. L. / MacDonald, Anna J. / Quasim, Sumaiya / Barclay, Candida / Sarre, Stephen D. et al. | 2015
- 571
-
Eradicating down the food chain: optimal multispecies eradication schedules for a commonly encountered invaded island ecosystemBode, Michael / Baker, Christopher M. / Plein, Michaela et al. | 2015
- 580
-
Extinction debt of a common shrub in a fragmented landscapeGonzález‐Varo, Juan P. / Albaladejo, Rafael G. / Aizen, Marcelo A. / Arroyo, Juan / Aparicio, Abelardo et al. | 2015
- 590
-
A landscape triage approach: combining spatial and temporal dynamics to prioritize restoration and conservationRappaport, Danielle I. / Tambosi, Leandro R. / Metzger, Jean P. et al. | 2015
- 602
-
EDITOR'S CHOICE: Small‐scale restoration in intensive agricultural landscapes supports more specialized and less mobile pollinator speciesKremen, Claire / M'Gonigle, Leithen K. et al. | 2015
- 602
-
Small-scale restoration in intensive agricultural landscapes supports more specialized and less mobile pollinator speciesClaire Kremen et al. | 2015
- 611
-
Chronic anthropogenic disturbance drives the biological impoverishment of the Brazilian Caatinga vegetationRibeiro, Elâine M. S. / Arroyo‐Rodríguez, Víctor / Santos, Bráulio A. / Tabarelli, Marcelo / Leal, Inara R. et al. | 2015
- 621
-
The importance of spinner dolphin (Stenella longirostris) resting habitat: implications for managementTyne, Julian A. / Johnston, David W. / Rankin, Robert / Loneragan, Neil R. / Bejder, Lars et al. | 2015
- 631
-
Sound exposure in harbour seals during the installation of an offshore wind farm: predictions of auditory damageHastie, Gordon D. / Russell, Deborah J.F. / McConnell, Bernie / Moss, Simon / Thompson, Dave / Janik, Vincent M. et al. | 2015
- 631
-
ound exposure in harbour seals during the installation of an offshore wind farm: predictions of auditory damageGordon D Hastie et al. | 2015
- 641
-
Towards a risk register for natural capitalMace, Georgina M. / Hails, Rosemary S. / Cryle, Philip / Harlow, Julian / Clarke, Stewart J. et al. | 2015
- 641
-
REVIEW: Towards a risk register for natural capitalMace, G. M. / Hails, R. S. / Cryle, P. / Harlow, J. / Clarke, S. J. et al. | 2015
- 654
-
Developing state and transition models of floodplain vegetation dynamics as a tool for conservation decision‐making: a case study of the Macquarie Marshes Ramsar wetlandBino, Gilad / Sisson, Scott A. / Kingsford, Richard T. / Thomas, Rachael F. / Bowen, Sharon et al. | 2015
- 665
-
Evaluating conservation and fisheries management strategies by linking spatial prioritization software and ecosystem and fisheries modelling toolsMetcalfe, Kristian / Vaz, Sandrine / Engelhard, Georg H. / Villanueva, Maria Ching / Smith, Robert J. / Mackinson, Steven et al. | 2015
- 675
-
Wildlife camera trapping: a review and recommendations for linking surveys to ecological processesBurton, A. Cole / Neilson, Eric / Moreira, Dario / Ladle, Andrew / Steenweg, Robin / Fisher, Jason T. / Bayne, Erin / Boutin, Stan et al. | 2015
- 675
-
REVIEW: Wildlife camera trapping: a review and recommendations for linking surveys to ecological processesBurton, A. C. / Neilson, E. / Moreira, D. / Ladle, A. / Steenweg, R. / Fisher, J. T. / Bayne, E. / Boutin, S. et al. | 2015
- 686
-
Developing and enhancing biodiversity monitoring programmes: a collaborative assessment of prioritiesPocock, Michael J. O. / Newson, Stuart E. / Henderson, Ian G. / Peyton, Jodey / Sutherland, William J. / Noble, David G. / Ball, Stuart G. / Beckmann, Björn C. / Biggs, Jeremy / Brereton, Tom et al. | 2015
- 696
-
Social and ecological drivers of success in agri‐environment schemes: the roles of farmers and environmental contextMcCracken, Morag E. / Woodcock, Ben A. / Lobley, Matt / Pywell, Richard F. / Saratsi, Eirini / Swetnam, Ruth D. / Mortimer, Simon R. / Harris, Stephanie J. / Winter, Michael / Hinsley, Shelley et al. | 2015
- 706
-
Contrasting patterns in species and functional‐trait diversity of bees in an agricultural landscapeForrest, Jessica R. K. / Thorp, Robbin W. / Kremen, Claire / Williams, Neal M. et al. | 2015
- 716
-
Habitat context influences nitrogen removal by restored oyster reefsSmyth, Ashley R. / Piehler, Michael F. / Grabowski, Jonathan H. et al. | 2015
- 726
-
Green roof plant species diversity improves ecosystem multifunctionalityLundholm, Jeremy T. et al. | 2015
- 735
-
Avian species identity drives predation success in tropical cacao agroforestryMaas, Bea / Tscharntke, Teja / Saleh, Shahabuddin / Dwi Putra, Dadang / Clough, Yann et al. | 2015
- 744
-
Agricultural intensification and the functional capacity of soil microbes on smallholder African farmsWood, Stephen A. / Bradford, Mark A. / Gilbert, Jack A. / McGuire, Krista L. / Palm, Cheryl A. / Tully, Katherine L. / Zhou, Jizhong / Naeem, Shahid et al. | 2015
- 753
-
Forest management and regional tree composition drive the host preference of saproxylic beetle communitiesMüller, Jörg / Wende, Beate / Strobl, Carolin / Eugster, Manuel / Gallenberger, Iris / Floren, Andreas / Steffan‐Dewenter, Ingolf / Linsenmair, Karl Eduard / Weisser, Wolfgang W. / Gossner, Martin M. et al. | 2015
- 763
-
Microbial communities and nutrient dynamics in experimental microcosms are altered after the application of a high dose of BtiDuguma, Dagne / Hall, Michael W. / Rugman‐Jones, Paul / Stouthamer, Richard / Neufeld, Josh D. / Walton, William E. et al. | 2015
- 774
-
Rapid collapse of a sub‐Antarctic alpine ecosystem: the role of climate and pathogensBergstrom, Dana M. / Bricher, Phillippa K. / Raymond, Ben / Terauds, Aleks / Doley, David / McGeoch, Melodie A. / Whinam, Jennie / Glen, Morag / Yuan, Ziqing / Kiefer, Kate et al. | 2015
- 784
-
Assessing the distribution of disease‐bearing rodents in human‐modified tropical landscapesMorand, Serge / Bordes, Frédéric / Blasdell, Kim / Pilosof, Shai / Cornu, Jean‐François / Chaisiri, Kittipong / Chaval, Yannick / Cosson, Jean‐François / Claude, Julien / Feyfant, Tristan et al. | 2015
- 795
-
Sugar provisioning maximizes the biocontrol service of parasitoidsTena, Alejandro / Pekas, Apostolos / Cano, Dalmert / Wäckers, Felix L. / Urbaneja, Alberto et al. | 2015