Offshore
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
Table of contents
- 4
-
Deep water fields transform India's energy landscape| 2010
- 8
-
Comment| 2010
- 10
-
Challenges of a giant deepwater gas field| 2010
- 10
-
Data| 2010
- 11
-
Mega deepwater hydrocarbon development| 2010
- 12
-
Global E&P| 2010
- 13
-
Execution - Getting it right first time| 2010
- 16
-
Offshore Europe| 2010
- 18
-
Gulf of Mexico| 2010
- 20
-
Subsea Systems| 2010
- 22
-
Vessels, Rigs, & Surface Systems| 2010
- 24
-
Drilling & Production| 2010
- 25
-
KG-D6 Raising the bar| 2010
- 26
-
Geosciences| 2010
- 28
-
SPECIAL REPORT: CASPIAN SEA - Caspian Sea set for offshore resurgence - The Caspian offshore is one of the world's most important sources of oil and gas production growth. In 2010, offshore production is expected to top 1.5 MMboe/d, with plans in place to reach 3 MMboe/d by 2020.| 2010
- 28
-
Caspian Sea set for offshore resurgence| 2010
- 29
-
Community development - making a difference| 2010
- 32
-
Seismic vessel count down, but work is picking up| 2010
- 32
-
Transocean and reliance: Pioneering deepwater drilling| 2010
- 32
-
GEOLOGY & GEOPHYSICS - Seismic vessel count down, but work is picking up - The business side of offshore geology and geophysics in 2009 remained in tune with the generally weak year for the entire E&P industry. The survey which follows shows that the vessel count was 156, down by 17 from last year's report.| 2010
- 34
-
Integrated project teams achieve fast-track conclusion at KG-D6| 2010
- 34
-
Worldwide seismic vessel survey| 2010
- 40
-
Fast track deepwater field development under challenging conditions| 2010
- 40
-
Ultra high pressure risers for deepwater drilling| 2010
- 40
-
DRILLING & COMPLETION - Ultra high pressure risers for deepwater drilling - As the development of offshore hydrocarbon reserves extends into greater water and well depths, riser system design and supply becomes a critical industry challenge. One such example is the drilling of pre-salt wells in water depths approaching 3,000 m (10,000 ft).| 2010
- 42
-
Reliance employs baker Hughes products, Services fo KG-D6 development| 2010
- 43
-
Bechel off shores project management consultant services results in smooth, fast field development| 2010
- 44
-
Goehazrds and geosciences expertise| 2010
- 45
-
Technip meets the challenge of fast track deepwater development in India| 2010
- 46
-
Venkataramanan associates designs state-of-the-art operations centre| 2010
- 48
-
Installation of the world's deepest spar| 2010
- 48
-
ENGINEERING, CONSTRUCTION, & INSTALLATION - Installation of the world's deepest spar - Shell's Perdido development is a record-setting venture. The list of world firsts includes an integrated topsides installation that set a new record for lift weight in the US Gulf of Mexico (GoM) at 8,866 metric tons (9,773 tons).| 2010
- 52
-
Downhole monitoring, control using digital distributed sensing| 2010
- 52
-
PRODUCTION OPERATIONS - Downhole monitoring, control using digital distributed sensing - Real-time, accurate downhole monitoring data is crucial to understanding and controlling well-bore and reservoir performance while maximizing oil and gas extraction. An increasingly used method to get this data is permanently installed downhole monitoring sensors in production and injection wells.| 2010
- 54
-
Capitalizing on real-time drilling data in reservoir management - The industry is looking for fast, easy-to-use, powerful reservoir management solutions to improve performance and production, and reservoir modeling is moving into this crucial phase of drilling developments in well correlation, well planning, local model updates, and the ability to incorporate real-time drilling data into the model.| 2010
- 54
-
Capitalizing on real-time drilling data in reservoir management| 2010
- 56
-
Polymer seal tests reveal elastomer needs for future EOR programs| 2010
- 56
-
Polymer seal tests reveal elastomer needs for future EOR programs - With a 1% improvement in world oil production efficiency estimated to be worth an additional 20-30 Bbbl, the ability to extend the operational life of seals and other polymer-based components would provide significant financial benefits.| 2010
- 58
-
Subsea separation, boosting reach record depths| 2010
- 58
-
SUBSEA - Subsea separation, boosting reach record depths - Recent awards and start-ups indicate several new projects in the developmental stages plus new world records for installed systems. Subsea separation and boosting technology is now operational in 2,438 m (7,999 ft) water depth in Shell's Perdido field.| 2010
- 60
-
FLOWLINES & PIPELINES - Technip lowering threshold for flexible pipes, risers - Technip is shifting its subsea R&D focus increasingly towards the coming generation of ultra deepwater projects. Management outlined some of the solutions and associated investments at a recent presentation at the company's flexible risers/flowlines plant in Le Trait, northern France.| 2010
- 60
-
Technip lowering threshold for flexible pipes, risers| 2010
- 62
-
Challenges to manufacture of pipe for deepwater, corrosive hydrocarbons| 2010
- 62
-
Challenges to manufacture of pipe for deepwater, corrosive hydrocarbons - To meet the demand for gas transportation through more onerous environments, there are factors the pipe and plate makers need to consider to ensure the finished product meets the standards required especially for sour service and deepwater applications.| 2010
- 67
-
PORT FOURCHON - Yes, they have no bananas| 2010
- 74
-
New lock keeps bayou cargo flowing; LA 1 again seeks funding| 2010
- 76
-
Storms, deepwater combine to make inspections healthy business in Port Fourchon| 2010
- 77
-
HOS Centerline gives new meaning to multi-purpose vessel| 2010
- 78
-
Report shows enormity of GoM decommissioning market| 2010
- 81
-
SWEDEN - Glass-syntactic foam insulates IRM divers . H-shackles to connect Usan mooring chain| 2010
- 82
-
SKF helping Total to limit unplanned shutdownsGREEN, D. et al. | 2010
- 85
-
Business BriefsERDMANN, W. et al. | 2010
- 87
-
Advertisers' IndexSHAO, D. et al. | 2010
- 88
-
Beyond the HorizonDEO, B. B. et al. | 2010