Robotics and computer-integrated manufacturing : an international journal
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
Table of contents
- 169
-
Flexible automation and intelligent manufacturing 2001Ahmad, M.Munir et al. | 2002
- 171
-
Establishing and improving manufacturing performance measuresAhmad, M.Munir et al. | 2002
- 177
-
Performance analysis and optimisation of shape recognition and classification using ANNNabhani, Farhad et al. | 2002
- 187
-
Simulation of an optical sensing system for automatic object trackingGolnabi, Hossein et al. | 2002
- 197
-
Impact of human error on lumber yield in rough millsBuehlmann, Urs et al. | 2002
- 205
-
Rules for integrating fast changeover capabilities into new equipment designVan Goubergen, Dirk et al. | 2002
- 215
-
The series-parallel replacement problemHartman, J.C. et al. | 2002
- 223
-
Unrelated parallel machine scheduling with setup times using simulated annealingKim, Dong-Won et al. | 2002
- 233
-
Diagnosis of multi-operational machining processes through variation propagation analysisHuang, Qiang et al. | 2002
- 241
-
Development of a placement time estimator function for a turret style surface mount placement machineEllis, Kimberly P. et al. | 2002
- 255
-
Equipment replacement decisions and lean manufacturingSullivan, William G. et al. | 2002
- 267
-
A rule based expert system for rapid prototyping system selectionMasood, S.H. et al. | 2002
- 275
-
A feature-based database evolution approach in the design processda Cunha, Raimundo R.M. et al. | 2002
- 283
-
Electrochemical machining: new possibilities for micromachiningBhattacharyya, B. et al. | 2002
- 291
-
Increasing CNC machine tool productivity by using tool-part touch controlNenov, G.V. et al. | 2002
- 297
-
A task based 'design for all' support toolMarshall, R. et al. | 2002
- 305
-
A web-based expert system to assess the complexity of manufacturing organizationsEfstathiou, Janet et al. | 2002
- 313
-
A system architecture for holonic manufacturing planning and control (EtoPlan)Wullink, G. et al. | 2002
- 319
-
The impact of different levels of detail in manufacturing systems simulation modelsPersson, J.Fredrik et al. | 2002
- 327
-
The impact of sequence changes on product lead timeDupon, A. et al. | 2002