Production and operations management : the flagship research journal of the Production and Operations Management Society
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
Table of contents
- 1
-
Introduction to the Special Issue on Capacity Constrained Planning and SchedulingSelcuk Erenguc, S. / Tirupati, D. / Woodruff, D. et al. | 1997
- 3
-
An Exposition of Multiple Constraint Scheduling as Implemented in the Goal System (Formerly Disaster[TM])Simons, J. V. / Simpson, W. P. et al. | 1997
- 23
-
Comments on an Exposition of Multiple Constraint SchedulingConway, R. et al. | 1997
- 25
-
Commentary on "An Exposition of Multiple Constraint Scheduling as Implemented in the Goal System"Pinedo, M. et al. | 1997
- 28
-
On the Theory of Constraints and the Goal SystemSpearman, M. L. et al. | 1997
- 34
-
Response to CommentariesSimons, J. V. / Simpson, W. P. et al. | 1997
- 37
-
Production Flow Control for a Manufacturing System with Flexible RoutingsKraemer, F.-J. / El Hafsi, M. / Bai, S. X. et al. | 1997
- 57
-
Minimizing Total Weighted Completion Time on a Single Batch Processing MachineUzsoy, R. / Yang, Y. et al. | 1997
- 74
-
O(m^2) Algorithms for the Two and Three Sublot Lot Streaming ProblemWilliams, E. F. / Tuefekci, S. / Akansel, M. et al. | 1997