Study and analysis of problems and disturbances caused by oversize boulders in a mine production system: A case study (English)
- New search for: Kumar, A.
- New search for: Kumar, A.
- New search for: Singhal, R. K.
In:
Mine planning and equipment selection
;
121-126
;
1995
-
ISBN:
- Conference paper / Print
-
Title:Study and analysis of problems and disturbances caused by oversize boulders in a mine production system: A case study
-
Contributors:Kumar, A. ( author ) / Singhal, R. K.
-
Conference:International symposium; 4th, Mine planning and equipment selection ; 1995 ; Calgary; Canada
-
Published in:Mine planning and equipment selection ; 121-126
-
Publisher:
- New search for: A A Balkema
-
Publication date:1995-01-01
-
Size:6 pages
-
ISBN:
-
Type of media:Conference paper
-
Type of material:Print
-
Language:English
-
Keywords:
-
Source:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Table of contents conference proceedings
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 3
-
Pit optimization of Sapan Dalam multi-seam coal deposit of IndonesiaBaafi, E. Y. / Milawarma, E. / Cusack, C. et al. | 1995
- 9
-
A dragline simulation model for complex multi-seam operationsBaafi, E. Y. / Mirabediny, H. / Whitchurch, K. et al. | 1995
- 15
-
Planning of ore recovery parameters based on economical and mathematical modelling of ore drawingBolkisev, V. S. / Shashkin, V. N. / Amiralin, K. A. et al. | 1995
- 19
-
A rational approach to the design of underground marble quarriesBosu, M. / Ciccu, R. / Manca, P. P. et al. | 1995
- 29
-
`INFRA' - Computer-aided planning of mine transportation systemsBuhrow, C. et al. | 1995
- 39
-
Managerial aspects of mining projects in remote sitesChaves, A. P. et al. | 1995
- 45
-
Optimum open pit limit of Hekimhan-Deveci iron mine: Determination by the moving cone optimising techniqueDag, A. / Oezer, U. et al. | 1995
- 49
-
Planning for safety: The use of risk assessmentFoster, P. J. / Edwards, J. S. et al. | 1995
- 57
-
Development of a short term planning tool at the Compagnie Miniere des Guemassa, ONA, MoroccoGoetz, D. / Masurel, P. / Ait Rahou, S. M. / Sellami, M. et al. | 1995
- 65
-
Numeric methods and their user-friendly applicationsGoekay, M. K. et al. | 1995
- 71
-
Prediction of gas-geomechanic situation of coal-gas deposit during underground mining in panelGritsko, G. I. / Vlasenko, B. V. / Fedorin, V. A. et al. | 1995
- 77
-
Top coal caving technology in dip thick coal seamsYu, H. / Wu, F. / Li, C. / Zhang, Y. et al. | 1995
- 81
-
Meaningful rates of return for project evaluationHajdasinski, M. M. et al. | 1995
- 89
-
Precision drilling extends the range of long hole blastingHamrin, H. et al. | 1995
- 97
-
Peculiarities of recultivation by placer deposit miningHnykin, V. F. et al. | 1995
- 103
-
Short-term production scheduling for open pit mines by PERT network with resource constraintsHu, Q. / Wei, W. / Fang, S. et al. | 1995
- 109
-
The study of rational bench height of deep open pit mines based on haulage costWang, J. / Liu, Q. et al. | 1995
- 113
-
The forecasting report of the moment of the mine retirement from the coal area mine fundKondratova, I. G. / Bulychev, N. S. et al. | 1995
- 117
-
Three dimensional modeling in planning ornamental stone quarriesKoppe, J. C. / Zingano, A. C. / Costa, J. F. C. L. et al. | 1995
- 121
-
Study and analysis of problems and disturbances caused by oversize boulders in a mine production system: A case studyKumar, A. et al. | 1995
- 127
-
An intelligent system of optimizing the mine production planning of underground mineLi, Y. / Chen, X. / Tong, G. et al. | 1995
- 131
-
Intellectual supporting system of VACS operator based on the fuzzy diagnostic modelLockshina, I. V. et al. | 1995
- 137
-
Computerized mine planning at Brunswick Mining & SmeltingMacPherson, G. E. / Stothart, P. G. / Torrance, J. G. et al. | 1995
- 143
-
Hydrotransport system simulation modeling for Syncrude's North MineMcTurk, J. / Batty, P. / Ellis, D. W. et al. | 1995
- 151
-
Hard dimension stone production by splitting and cutting methods in Italian quarriesMancini, R. / Cardu, M. / Fornaro, M. et al. | 1995
- 157
-
Layout and equipment of a modern high productive mine operation at great depths: The Ensdorf MineMeyer, A. / Gessner, D. et al. | 1995
- 163
-
UBC mining method selectionMiller-Tait, L. / Pakalnis, R. / Poulin, R. et al. | 1995
- 169
-
An expert system controlling ore flow in large scale orepass systemsMogi, G. / Yamatoni, J. / Adachi, T. et al. | 1995
- 177
-
Block modelling and long range mine planning using SURPACNachmias, J. / Pavlov, Y. et al. | 1995
- 183
-
Technogenic potash seams and their mining prospectsNesterov, M. P. / Marakov, V. Y. et al. | 1995
- 189
-
Safety during filling of underground cavern gas storageOtahal, A. / Hajek, L. et al. | 1995
- 193
-
Underground hard-rock mining strategy developmentPareja, L. D. / Pelley, C. W. et al. | 1995
- 199
-
Re-examination of a century old mining area: Boleo, Baja California, MexicoParkes, D. M. et al. | 1995
- 205
-
Exploitation planning in slate quarries by merging the recovery and quality indicesPereira, H. G. / Sousa, A. J. / Albuquerque, T. / Ribeiro, J. et al. | 1995
- 209
-
Coal mine pollution flows monitoringPuchkov, L. A. / Ayurov, V. D. / Kaledina, N. O. et al. | 1995
- 215
-
The mathematical model of interaction of mining and transport equipment at the quarry's working zoneRakishev, B. / Djarlkaganov, U. / Marat, J. et al. | 1995
- 221
-
Turning mining enterprises in Russia into private and joint-stock companiesRevazov, M. / Likhterman, S. et al. | 1995
- 227
-
Short term mining operation sequencing and control: The B2 approach as a case studySchleifer, J. / Ismail, M. / Caumartin, E. et al. | 1995
- 231
-
Application of deposit simulation model in mine designShu, H. / Yang, P. / Tong, G. et al. | 1995
- 235
-
Discussion on the mechanism of cut pulling in underground minesSingh, S. P. et al. | 1995
- 243
-
A field study of sources of hole alignment deviationsSinkala, T. et al. | 1995
- 249
-
On the issues of the solution of dynamics simulation of coal production within the coal mining process in coal facesSnapka, P. et al. | 1995
- 255
-
\Fundamental considerations on a mining technology beyond continuous and longwall miningSpies, K. et al. | 1995
- 261
-
Contribution to ventilation of shafts during their closingStrakos, V. / Kebo, B. et al. | 1995
- 265
-
Long term open pit schedulerTolwinski, B. / Golosinski, T. S. et al. | 1995
- 271
-
Simulation for design, planning and control in the automated mineVagenas, N. / Scoble, M. / Baiden, G. et al. | 1995
- 277
-
An integrated approach to the extraction of the Rio Grande silver/lead/zinc orebodies at Mount IsaVillaescusa, E. / Karunatillake, G. / Li, T. et al. | 1995
- 285
-
An interactive multiple criteria decision support system for production sequencing in an underground long wall hard coal mineWilke, F. L. / Winkler, B. M. et al. | 1995
- 291
-
Mine planning, pit design and production scheduling for Eshidiya phosphate minesWoreikat, J. / Hayek, F. et al. | 1995
- 297
-
BEGS - A simulation model for assessing risks in mineral resources estimationWright, E. A. et al. | 1995
- 303
-
Mining's new frontier: The Fording Coal g.p.s. experienceWusaty, E. / Paulhus, L. et al. | 1995
- 313
-
Self-adaptive control of productional operations for surface miningYun, Q. X. / Huang, G. Q. et al. | 1995
- 319
-
Analysis of stability of gate entries in retreating longwall miningZhang, M. / Bhattacharyya, A. K. et al. | 1995
- 327
-
Oil content estimation in sedimentary rock assisted by geostatisticsZingano, A. C. / Costa, J. F. C. L. / Koppe, J. C. et al. | 1995
- 339
-
A detailed classification of rotating excavatorsAdler, L. / Thompson, S. D. et al. | 1995
- 343
-
Determination of equipment downtime/breakdown and availability coefficients for continuous surface mining systemsAgioutantis, Z. G. / Kavouridis, C. et al. | 1995
- 351
-
The economics and logistics of moving car bunker systems applied to modern underground coal minesBarlow, P. M. et al. | 1995
- 357
-
Equipment selection in the Iranian marble quarries (dimension-stone industry): Procedures and problemsBassir, S. H. et al. | 1995
- 363
-
Conversion from bucketwheel to truck-shovel operation of Suncor, Oil Sands GroupBlazo, A. et al. | 1995
- 369
-
A systematic decision making model for optimum surface mining equipment selectionCebesoy, T. / Goezen, M. / Yahsi, S. et al. | 1995
- 379
-
Equipment selection for small scale miningChanda, M. W. et al. | 1995
- 385
-
Estimation of the air quality index in the case of operation of numerous diesel-powered units in Greek underground bauxite minesEconomopoulos, J. N. / Kontothanassis, P. T. et al. | 1995
- 391
-
Intelligent dispatch system for technological monitoringFedunec, N. I. / Fomicheva, O. E. / Lasht, D. G. et al. | 1995
- 395
-
Research on the interval between equipment examinationsLiu, F. / Gao, H. / Ma, Y. / Hu, M. et al. | 1995
- 399
-
Diagnosis of machines running at unstable speeds of revolutionGeropp, B. / Kessler, H.-W. / Burgwinkel, P. et al. | 1995
- 403
-
Application of high angle conveyor at Majdanpek open pit copper mineGrujic, M. / Stanisic, Z. et al. | 1995
- 409
-
Selection of opencast mine equipment using knowledge base and genetic algorithmHaidar, A. / Naoum, S. et al. | 1995
- 415
-
Selection of drill rigs for development drifting in underground minesHamrin, H. / Gustafsson, L. et al. | 1995
- 419
-
Conveyor belt selection criteriaHardygora, M. et al. | 1995
- 423
-
Current collectors for trolley mine locomotivesIvanov, A. B. et al. | 1995
- 427
-
Determination of the distribution function of conveyor belt operating time based on the belt modelJurdziak, L. / Hardygora, M. et al. | 1995
- 431
-
On-line fault diagnosis of a bucket wheel gear box in a German open cast coal mineKessler, H.-W. / Van den Heuvel, B. / Bauer, B. / Geropp, B. et al. | 1995
- 437
-
Double roll crusher - Tooth base and bimetallic cap developmentsKhan, A. / Reid, D. / Obaia, K. / Adamic, D. et al. | 1995
- 445
-
Modern mine maintenance: Toolbox, blackbox, or tribo-technology?Kincaid, R. L. et al. | 1995
- 457
-
The pipeline transportation of grinded copper ore at Cerovo mine - From concept to implementationKnezevic, D. / Markovic, Z. / Stupar, S. / Dragic, D. et al. | 1995
- 463
-
Planning and keeping in operation of coal-cavingsKovacs, T. / Nemeth, L. et al. | 1995
- 469
-
On the property of hydraulic couplingLi Guang Bu et al. | 1995
- 475
-
Design of an economic mobile slasher for underground coal extractionMaity, S. N. / Chaulya, S. K. / Dhar, B. B. et al. | 1995
- 481
-
BEdisp - A computer-based truck dispatching system for small-medium scale mining operationsPanagiotou, G. N. / Michalakopoulos, T. N. et al. | 1995
- 487
-
Magnetic defectoscopy of steel ropesPistora, J. / Lesnak, M. / Ciprian, D. / Madr, V. et al. | 1995
- 493
-
The problems of control of power consumption in the mining enterprisesPivnyak, G. et al. | 1995
- 497
-
The development of welded structures for mining equipmentPowers, B. et al. | 1995
- 505
-
Maintenance characteristics of mobile mine equipment at Falconbridge Strathcona mineRunciman, N. / Vagenas, N. / Howes, R. A. et al. | 1995
- 511
-
Simple and exact mining using surface minersSchimm, B. et al. | 1995
- 517
-
Measurement and analysis of dragline operating parameters for block excavationSharrock, G. B. / Aspinall, T. O. / Scott, A. et al. | 1995
- 523
-
Estimation of applicability of a drilling machine in Japanese open pit limestone quarryShimada, H. / Matsui, K. et al. | 1995
- 529
-
An introduction of a continuous mining system in hard rock open pit mines using a modified surface minerSpachtholz, F. X. / Wilke, F. L. et al. | 1995
- 535
-
The use of-the-road tyres in a Turkish opencast lignite mine and its importance in mine economicsSunu, M. Z. / Yilmaz, A. O. et al. | 1995
- 541
-
Appropriate technology for the cleaner mining of coal by smaller operatorsWade, L. / Woodyatt, T. T. H. et al. | 1995
- 547
-
Performance analysis of PDC pin and hybrid core bits in rock drillingWaller, M. D. / Ersoy, A. et al. | 1995
- 553
-
Automatic selection of aggregate images from a moving conveyor beltWang, W. et al. | 1995
- 559
-
Availability control and equipment monitoring on large hydraulic shovels with the aid of on-board computersWulfert, U. et al. | 1995
- 565
-
Experimental study on estimation of leakage discharge through concrete crackYanagi, H. / Matuoka, S. / Fukuhara, T. et al. | 1995
- 571
-
Semi-continuous coal haulage system in Chinese surface minesZhang, Y. D. / Zhang, D. X. / Li, X. C. / Yang, S. C. et al. | 1995
- 579
-
Research on the global optimization theory for mining engineering systemsChai, J. / Xie, X. / Tong, G. et al. | 1995
- 585
-
Fully automated laser system for surveying a stockpile from a tripper carClifford, B. et al. | 1995
- 591
-
Integrating communications and applications in the automated underground mineHackwood, J. / Poole, R. et al. | 1995
- 597
-
Intelligence decision-making system for selecting tunnelling equipmentGao, H. / Zhang, Y. / Liu, F. / Ma, Y. et al. | 1995
- 601
-
The system design principles of mining machines with the combined main partsKlimov, Y. I. et al. | 1995
- 605
-
Applications of a flexible and robotics in mining: Database for designersKonyukh, V. et al. | 1995
- 611
-
TMS[TM] - Total Mining Systems: An intelligent management, production control and planning facilityPeck, J. / Hendricks, C. et al. | 1995
- 619
-
Power-and resources saving technology of rockmass destructionRashkin, A. V. / Kuzin, V. F. / Myazin, V. P. et al. | 1995
- 623
-
Integrated computer system for planning and controlling miningStepanov, P. / Piven, G. et al. | 1995
- 627
-
Simulation and animation of surface mines in the Western United StatesSturgul, J. R. / Tiedemann, J. / Ritter, C. / Fliess, T. et al. | 1995
- 635
-
Apparatus and programme providing microprocessory means of mining automationTkachov, V. V. / Pivniak, G. G. et al. | 1995
- 639
-
Methods and results of the field measuring of geotechnical rock properties on spoil banks of brown-coal minesAldorf, J. et al. | 1995
- 645
-
Ethics, surface mining and the environmentCragg, W. / Pearson, D. / Cooney, J. et al. | 1995
- 651
-
Monitoring systems in mining environmental management and controlDe Salles Leal Filho, L. / Hennies, W. T. / Owen, D. / Durucan, S. et al. | 1995
- 657
-
Integrated reclamation planning of disconfigured landscape after surface mining operations at Ghana Consolidated Diamonds limited (GCD), Akwatia, GhanaFenteng, J. A. F. / Asabere, R. K. / Solomon, G. B. et al. | 1995
- 667
-
Ferric phosphate coating to prevent pyrrhotite oxidationGeorgopoulou, Z. / Fytas, K. / Soto, H. / Evangelou, B. et al. | 1995
- 675
-
Surface coal mining in the South Wales environmentHaigh, M. J. et al. | 1995
- 683
-
Opencast mine planning creates the prerequisite for environmental compatibilityHartung, M. et al. | 1995
- 691
-
Underground limestone mining in Brazil as an economic environmental issueHennies, W. T. / Stellin, A. / Ghizzi, L. C. et al. | 1995
- 699
-
The social and environmental effects of surface coal miningHeycock, S. et al. | 1995
- 705
-
Mine rehabilitation close to urban areas: The case of Itaquera Quarry, Sao Paulo, BrazilIbrahim, M. M. / Eston, S. M. / Sanchez, L. E. et al. | 1995
- 709
-
Study on biochemical treatment of Acid Mine Drainage (AMD) and comprehensive utilization of its sludgeZhu, J. et al. | 1995
- 715
-
Environmental approach and the future of mining in the Urals region of RussiaKhokhryakov, A. V. / Dementyev, I. V. / Albrecht, V. G. et al. | 1995
- 717
-
Modelling rainfall/runoff on reclaimed landKilmartin, M. P. et al. | 1995
- 723
-
Classification of waste rock at Island Copper Mine for acid rock drainage potentialLister, D. / Poling, G. W. et al. | 1995
- 729
-
Geotechnical stability of slope of the opencast mine of Czechoslovak army at the foot of the Ore MountainsLost'ak, O. et al. | 1995
- 733
-
Tracking of heavy metals in drainage from abandoned mines, Big Cottonwood Creek, UtahMcNearny, R. L. et al. | 1995
- 737
-
Principles and practices of sustainable development - With TransAlta examplesMikalson, D. A. et al. | 1995
- 747
-
The identification, location and assessment of abandoned mine hazards - The first step toward rehabilitationMitchell, A. / Mackasey, W. O. et al. | 1995
- 759
-
Particulate emissions from some sources in surface miningMohamed, M. A.-K. et al. | 1995
- 765
-
Lithological and mineralogical influences on pyrite oxidation during the generation of acidic drainageMountjoy, K. J. / Poling, G. W. et al. | 1995
- 773
-
Environmental problems associated with blasting operations and their remediesNavalkar, C. B. et al. | 1995
- 779
-
Saline gold mine wastes in arid Western Australia: Revegetation establishment in the absence of topsoilOsborne, J. M. et al. | 1995
- 787
-
Self-sustainable reclamation: Shrub and tree establishment on saline mine wastesOsborne, J. M. et al. | 1995
- 793
-
Environmental issues of energy use in minesPivniak, G. G. / Ivanov, A. B. et al. | 1995
- 797
-
Risk management for mine waste and tailingsPoulin, R. et al. | 1995
- 803
-
Environmental problems associated with mining of bentonite clay deposits at Boa, Vista, Paraiba, BrazilSilva, C. M. M. / Eston, S. M. / Damasceno, E. C. et al. | 1995
- 807
-
Surface mining and the responsibility for environmental: New situations and challenges for the Czech coal industrySvoboda, I. / Vrbova, M. et al. | 1995
- 811
-
Areal dubbing of mining activity in the largest mining company in the Czech Republic: Most Coal Joint Stock Company (JSC MUS)Triska, J. et al. | 1995
- 819
-
Parameter optimization and control in blasting works for ore and coal minesArad, V. / Arad, S. et al. | 1995
- 825
-
The stability and reliability analysis of development openings in the Valea JiuluiArad, V. / Arad, S. et al. | 1995
- 829
-
The feasibility study of waterproof and water-protection technologies on the basis of Ukrainian mining regions geotechnical systemsBondarenko, V. I. / Sadovenko, I. A. et al. | 1995
- 833
-
Buffer action in the carboniferous clays rocks located on hard coal heapsBzowski, Z. et al. | 1995
- 839
-
A general stochastic methodology for rock work designCotza, R. / Grosso, B. et al. | 1995
- 845
-
Static collapse of mine waste fillsDawson, R. F. / Morgenstern, N. R. et al. | 1995
- 853
-
The objective laws of itself of landslides in the open pit minesDemine, A. M. / Graur, I. A. et al. | 1995
- 857
-
Backfill in potash mines: Transportation and geotechnical issuesDe Souza, E. et al. | 1995
- 865
-
Seismicity at El Teniente mineDunlop, R. / Gaete, S. et al. | 1995
- 871
-
Performance tests on short length cable bolts in an underground room and pillar mineEconomopoulos, J. N. / Kotinis, D. H. / Koronakis, N. J. / Sofianos, A. I. et al. | 1995
- 875
-
Stability of coal pillars in inclined coal seamsForoughi, M. H. et al. | 1995
- 881
-
Variable stress meter for monitoring rock mass structuresFujimura, F. / Hennies, W. T. / Fernandes, A. C. et al. | 1995
- 887
-
Blastability of rocks - Studied casesFujimura, F. / Soares, L. / Hennies, W. T. / Resende, M. A. et al. | 1995
- 893
-
Modelling of the underground water filtration in the drainage shaft region of Kremikovtsi open-pit mineGabeva, D. A. et al. | 1995
- 899
-
Rock mass as a dissipative thermodynamic system - New conception in open pit slope stability modellingHalatchev, R. A. et al. | 1995
- 907
-
Selection of ground control in instrumentation for potash, coal and hardrockHerget, G. H. et al. | 1995
- 913
-
Resistivity manifestations of slope deformations and subsidence basinsHofrichterova, L. / Muellerova, J. / Muerller, K. et al. | 1995
- 921
-
Dumping patterns of coal wastes in Chinese underground minesHu, Z. / Gu, H. et al. | 1995
- 927
-
Research of general entropy in miningSong, H. / Sun, B. / Yu, B. / Liu, I. et al. | 1995
- 933
-
The prediction of rock quality parameters by using neural network modelsHuang, Y. / Lindqvist, P.-A. et al. | 1995
- 939
-
Truck road slope design by using coefficient of equivalent haulage distance in the Yongping copper mineHua, J. / Zhou, P. / Cai, S. et al. | 1995
- 945
-
Model of fines generation in coal blastingKabongo, K. K. et al. | 1995
- 953
-
Continuum and discontinuum modelling of mine pillars in jointed rockKapenis, A. P. / Tsoutrelis, C. E. T. et al. | 1995
- 961
-
Geomechanical model of rock salt for stress and stability analysis of underground disposal cavernKleczek, Z. / Flisiak, D. et al. | 1995
- 967
-
A computer modelling system for three-dimensional stability assessment of slopesKumsar, H. / Denby, B. et al. | 1995
- 973
-
Codisposal of fine tails and overburden utilizing pipelining techniquesLord, E. R. F. / Maciejewski, W. et al. | 1995
- 981
-
Dam construction and utility corridor relocation in-pit at Syncrude Canada LtdMacNeil, J. / Piciacchia, L. / Cameron, R. / Ashton, C. et al. | 1995
- 989
-
Instrumentation of an advancing mine slope in the Athabasca Oil SandsMcKenna, G. T. / Shelbourn, M. A. B. et al. | 1995
- 999
-
Large scale underground stoping of rock for aggregate production and subsequent use for storage or waste disposalNielsen, K. / Myrvang, A. et al. | 1995
- 1005
-
A computer program for kinematic analysis of rock slopesOecal, A. / Oezgenoglu, A. et al. | 1995
- 1011
-
A revegetation option for saline tailings in Western AustraliaOsborne, J. M. / Brearley, D. R. et al. | 1995
- 1017
-
Performance monitoring on the excavability of dragline - A case studyOezdogan, M. / Pasamehmetoglu, A. G. / Karpuz, C. / Hindistan, M. A. et al. | 1995
- 1023
-
Stress-deformed state of laminated anisotropic environment with cavity or inclusionPankratova, N. D. / Vasilenko, A. T. et al. | 1995
- 1029
-
Developing a mechanical hard rock splitterParaszczak, J. / Dupont, P. / Hadjigeorgiou, J. / Savard, M. et al. | 1995
- 1037
-
Application of geotextiles for stabilizing underground spacesPipiska, V. / Sedlaty, V. / Durove, J. / Maras, M. et al. | 1995
- 1041
-
The application of the concept of brittle-ductile transition to slope behaviourPoulsom, A. J. et al. | 1995
- 1047
-
The effect of cutting pattern geometry on the performance of pick arrays in machine miningRoxborough, F. F. / Liu, Z. C. / Chen, L. et al. | 1995
- 1055
-
Design of up-building the tailing pond in the Copper Mine MajdanpekSalatic, P. / Deusic, S. / Salatic, V. / Grbovic, M. et al. | 1995
- 1061
-
Geotechnical concerns with the design and application of spoil-side dragline operations at the Vesta Mine, East-Central AlbertaSimpson, C. / Horsfield, D. W. et al. | 1995
- 1069
-
Bolted voussoir rock roof beds with large deflectionsSofianos, A. I. / Kapenis, A. P. et al. | 1995
- 1075
-
The influence of horizontal stresses on the stability of surface coal mine footwall slopesStead, D. / Eberhardt, E. / Benko, B. et al. | 1995
- 1081
-
Sequential blasting: Problems faced by Chettinad CementsSundar, K. S. et al. | 1995
- 1091
-
Integrated mine water management planning for environmental protection and mine profitabilitySawatsky, L. F. / Beckstead, G. / Long, D. et al. | 1995
- 1095
-
A simple method to obtain size distribution of a rock heap using its segregation characteristicsUjihira, M. / Takagai, N. / Ogawa, K. / Mizushima, S. et al. | 1995
- 1101
-
Reduction of environmental pollution caused by transport vehicles in quarriesUshakov, V. V. et al. | 1995
- 1103
-
Industrial design and test of a backfill mining system under complex geological conditions in ChinaYang, G. / Zhang, J. et al. | 1995
- 1109
-
The system of geomechanical monitoring for block-layered massif of salt rockZhuravkov, M. A. / Andreyko, S. S. / Martunenko, M. D. et al. | 1995