A comparison of alternative conceptualizing tools for automated storage and retrieval systems (English)
- New search for: Eldemir, F.
- New search for: Graves, R.J.
- New search for: Malmborg, C.J.
- New search for: Eldemir, F.
- New search for: Graves, R.J.
- New search for: Malmborg, C.J.
In:
International Journal of Production Research
;
41
, 18
;
4517-4539
;
2003
-
ISSN:
- Article (Journal) / Print
-
Title:A comparison of alternative conceptualizing tools for automated storage and retrieval systems
-
Contributors:
-
Published in:International Journal of Production Research ; 41, 18 ; 4517-4539
-
Publisher:
-
Publication date:2003
-
Size:23 Seiten, 9 Quellen
-
ISSN:
-
Coden:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 41, Issue 18
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 4257
-
Rapid one-of-a-kind product development via the Internet: a literature review of the state-of-the-art and a proposed platformXie, S.Q. et al. | 2003
- 4299
-
Board sequencing and component loading problem for a single machine in PCB assembly planningVan Hop, Nguyen et al. | 2003
- 4317
-
Comparing reactive Kanban systemsTakahashi, Katsuhiko et al. | 2003
- 4339
-
Automatic set-up planning for metal cutting: an integrated methodologyHuang, S.H. et al. | 2003
- 4357
-
Modelling and performance of distributed algorithm for scheduling dissimilar machines with set-upHong, J. et al. | 2003
- 4383
-
Interference-free tool path generation in five-axis machining of a marine propellerYoun, Jae-Woong et al. | 2003
- 4403
-
Intermittent process hybrid measurement system on the machining centreShiou, Fang-Jung et al. | 2003
- 4429
-
Relative importance of contingency variables for advanced manufacturing technologyDas, A. et al. | 2003
- 4453
-
Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costsThiagarajan, S. et al. | 2003
- 4487
-
Facilities layout planning based on Fuzzy multiple criteria decision-making methodologyDeb, S.K. et al. | 2003
- 4505
-
Optimization of GMA welding process using the dual response approachKim, Dongcheol et al. | 2003
- 4517
-
A comparison of alternative conceptualizing tools for automated storage and retrieval systemsEldemir, Fahrettin et al. | 2003
- 4541
-
Book review of Integrated Models in Production Planning, Inventory, Quality and Maintenance. Edited by M. A. R ahim and M. B en -D aya (Kluwer Academic, USA, 2001), xix + 444 pp., hardcover, ISBN 0-7923-7347-2.Rahimifard, Shahin et al. | 2003
- 4543
-
Announcement| 2003