93LM001 New Product Introduction: People + Process + Product = Profit (English)
- New search for: Greaves, J.
- New search for: ISATA
- New search for: ENEA; Agency: Italy
- New search for: Greaves, J.
- New search for: ISATA
- New search for: ENEA; Agency: Italy
In:
Lean manufacturing in the automotive industries
;
47-54
;
1993
-
ISBN:
- Conference paper / Print
-
Title:93LM001 New Product Introduction: People + Process + Product = Profit
-
Contributors:
-
Conference:26th International symposium, Lean manufacturing in the automotive industries ; 1993 ; Aachen; Germany
-
Published in:ISATA -PROCEEDINGS- ; 47-54
-
Publisher:
- New search for: Automotive Automation Ltd
-
Place of publication:Croydon
-
Publication date:1993-01-01
-
Size:8 pages
-
Remarks:In 10 vols. Also known as ISATA 26
-
ISBN:
-
Type of media:Conference paper
-
Type of material:Print
-
Language:English
-
Keywords:
-
Source:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Table of contents conference proceedings
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 7
-
The Contribution of Polymeric Materials to the Future of the Automotive IndustryGalli, P. / ISATA / ENEA; Agency: Italy et al. | 1993
- 15
-
Total Quality: A Tool for Corporate Re-inventionReins, R. E. / ISATA / ENEA; Agency: Italy et al. | 1993
- 19
-
The South African Motor Industry and Development OpportunitiesNewbury, J. / ISATA / ENEA; Agency: Italy et al. | 1993
- 29
-
Understanding and Exploiting the Japanese Manufacturing ParadigmHannam, R. G. / ISATA / ENEA; Agency: Italy et al. | 1993
- 35
-
93LM012 Advanced Materials in World Class ManufacturingKaounides, L. C. / ISATA / ENEA; Agency: Italy et al. | 1993
- 47
-
93LM001 New Product Introduction: People + Process + Product = ProfitGreaves, J. / ISATA / ENEA; Agency: Italy et al. | 1993
- 55
-
93LM008 A Manufacturing Strategy Design Scheme which makes Optimum Use of Marketing, Production and Financial CriteriaBaines, T. / Harrison, D. K. / Hamblin, D. J. / ISATA / ENEA; Agency: Italy et al. | 1993
- 67
-
93LM091 Executive Summary - Lean Enterprise Benchmarking ReportThayer, B. / ISATA / ENEA; Agency: Italy et al. | 1993
- 69
-
93LM028 Development of Body Auto Fitting SystemSakai, H. / Yasumatsu, S. / ISATA / ENEA; Agency: Italy et al. | 1993
- 71
-
93LM029 Development of Lean Automation Equipment for Automobile Final Assembly LineChiba, H. / Tobita, H. / Kawamura, T. / Kuzuhara, T. / ISATA / ENEA; Agency: Italy et al. | 1993
- 85
-
93LM058 Development of a Flexible Main Body Assembly LineMaruyama, K. / ISATA / ENEA; Agency: Italy et al. | 1993
- 85
-
Development of a flexible main body assembly lineMaruyama, K. et al. | 1993
- 93
-
93LM015 The Enhancement of the Intelligent Body Assembly SystemIizuka, K. / Nakao, H. / Honda, S. / ISATA / ENEA; Agency: Italy et al. | 1993
- 101
-
93LM016 Direct Process for Lean Production SystemKatsumata, T. / Nagamitsu, T. / Iiyama, K. / Tsujii, G. / ISATA / ENEA; Agency: Italy et al. | 1993
- 111
-
93LM089 Some Important Principles and Findings Concerning Long Cycle Time Assembly WorkEngstroem, T. / Medbo, L. / ISATA / ENEA; Agency: Italy et al. | 1993
- 119
-
93LM090 Principles of Perception and Structuring of Long Cycle Time Assembly WorkEngstroem, T. / Jonsson, D. / ISATA / ENEA; Agency: Italy et al. | 1993
- 127
-
93LM043 Plant and Production Segmentation - Entry into Lean ProductionSchumann, C.-A. / Wirth, S. / ISATA / ENEA; Agency: Italy et al. | 1993
- 135
-
Implementation of island structures as a starting point for setting up lean productionSchumann, R. et al. | 1993
- 135
-
93LM030 Implementation of Island Structures as a Starting Point for Setting Up Lean ProductionSchumann, R. / ISATA / ENEA; Agency: Italy et al. | 1993
- 143
-
93LM052 Applying Just-in-Time with your Today Processes Towards "Lean Manufacturing"Mille, Y. / ISATA / ENEA; Agency: Italy et al. | 1993
- 149
-
93LM004 Construction of Machining Cell based on Thought Model Suitable for Culture of ManufacturingIhara, T. / Shibata, S. / Ooishi, S. / Ito, Y. / ISATA / ENEA; Agency: Italy et al. | 1993
- 157
-
93LM027 Lean Production in the Automotive Industry: Motor Car Assembly and Components ManufacturingCaridi, A. / ISATA / ENEA; Agency: Italy et al. | 1993
- 165
-
93LM083 Development and Test of an Empirical Model for a Total Productivity Analysis of Efficiency in Passenger Car AssemblyCarlsson, M. / ISATA / ENEA; Agency: Italy et al. | 1993
- 165
-
Development and test of an empirical model for a total productivity analysis of efficiency in passenger car assemblyCarlsson, M. et al. | 1993
- 173
-
93LM011 Cost Model for AssemblyEversheim, W. / Hartmann, M. / ISATA / ENEA; Agency: Italy et al. | 1993
- 181
-
93LM002 System Dynamics and Lean Supply ChainsTowill, D. R. / Naim, M. M. / ISATA / ENEA; Agency: Italy et al. | 1993
- 189
-
93LM003 The Design of Lean Manufacturing Production SystemsBurbidge, J. / ISATA / ENEA; Agency: Italy et al. | 1993
- 197
-
93LM010 The Means of a Successful Transition to Lean Inbound LogisticsEloranta, E. / Holmstroem, J. / Aavikko, P. / ISATA / ENEA; Agency: Italy et al. | 1993
- 205
-
93LM012 Key Characteristics of a Decision Support Tool for Supply Chain ManagementHolmstroem, J. / Pankakoski, J. / Williams, D. / ISATA / ENEA; Agency: Italy et al. | 1993
- 213
-
93LM019 The Role of Information Systems in the Management of Supply ChainsBaxter, L. F. / ISATA / ENEA; Agency: Italy et al. | 1993
- 221
-
93LM076 Improved Inter-Company Materials Handling Techniques Based Upon the use of EDIKruse, C. / ISATA / ENEA; Agency: Italy et al. | 1993
- 229
-
93LM077 The Impact of Electronic Data Interchange on Lean Supply Chain Management in the European Motor IndustryFrischkorn, H.-G. / Klugherz, M. / Thurmann, F. / ISATA / ENEA; Agency: Italy et al. | 1993
- 237
-
93LM035 Leitstands for System Component Suppliers of the Automotive IndustryTopolweski, F. / ISATA / ENEA; Agency: Italy et al. | 1993
- 243
-
93LM032 The Design of Processes for Lean Product DevelopmentKrause, F.-L. / Schlingheider, J. / ISATA / ENEA; Agency: Italy et al. | 1993
- 251
-
93LM069 Lean Development at a European Automotive SupplierFlik, M. I. / Kampf, H. / Kern, J. / Thumm, A. / ISATA / ENEA; Agency: Italy et al. | 1993
- 259
-
93LM071 Essential Concept of Development for Toyota Motor CorporationMotonami, M. / Hattori, H. / ISATA / ENEA; Agency: Italy et al. | 1993
- 265
-
93LM085 The Impact of New CAD Technologies on Lean ManufacturingGardan, Y. / Jung, J.-P. / Minich, C. / ISATA / ENEA; Agency: Italy et al. | 1993
- 265
-
The impact of new CAD technologies on lean manufacturingGardan, Y. / Jung, J.P. / Minich, C. et al. | 1993
- 273
-
93LM087 Safety Margins and Margins of Profit in Automotive Design and ManufacturingPina da Silva, F. / Barros Rodrigues, J. / ISATA / ENEA; Agency: Italy et al. | 1993
- 279
-
93LM040 Concurrent Engineering for Lean Manufacturing: Implementation IssuesMils, J. J. / Reimann, M. D. / Priest, J. / ISATA / ENEA; Agency: Italy et al. | 1993
- 279
-
Concurrent engineering for lean manufacturingMills, J.J. / Reimann, M.D. / Priest, J. et al. | 1993
- 287
-
93LM041 Simulation of Team Work at Assembly Lines in the Automotive IndustrySeliger, G. / Feige, M. / ISATA / ENEA; Agency: Italy et al. | 1993
- 295
-
93LM053 Resource Planning in the SCOPES Project (Systematic and Concurrent Design of Products, Equipments and Control Systems)Falkenauer, E. / Delchambre, A. / ISATA / ENEA; Agency: Italy et al. | 1993
- 303
-
93LM020 Reduction of Manufacturing Lead Time Through Various Enterprise CyclesEhie, I. C. / Stough, S. / Brandtner, T. / ISATA / ENEA; Agency: Italy et al. | 1993
- 311
-
93LM072 Simultaneous Engineering Reduces Product Development Time - Example: ToolsStalmann, A. / ISATA / ENEA; Agency: Italy et al. | 1993
- 319
-
93LM073 Transfer of Technological Requirements in a CAD/CAM-SystemEngeli, M. / ISATA / ENEA; Agency: Italy et al. | 1993
- 335
-
93LM074 Economical and Ecological Electrical Discharge Machining (EDM) in Automotive Tool MakingSchadach, P. / ISATA / ENEA; Agency: Italy et al. | 1993
- 341
-
93LM078 Finishing of Dies and Moulds: An Approach to Quality Oriented AutomationSchmidt, J. / Schauer, U. / ISATA / ENEA; Agency: Italy et al. | 1993
- 341
-
Finishing of dies and moulds: an approach to quality oriented automationSchmidt, J. / Schauer, U. et al. | 1993
- 349
-
93LA061 Rapid Prototyping - Industrial Application and Approaches to Prototyping of Metallic PartsKoenig, W. / Celi, I. / Noeken, S. / ISATA / ENEA; Agency: Italy et al. | 1993
- 359
-
93LM064 Cutting Tool Selection for Process Planning Using Expert System TechniquesGuelesin, M. / Jones, R. M. / ISATA / ENEA; Agency: Italy et al. | 1993
- 367
-
93LM065 Expert System based Machine Tool Selection and Machining Parameters Calculation for Process PlanningGuelesin, M. / Jones, R. M. / ISATA / ENEA; Agency: Italy et al. | 1993
- 375
-
93LM006 Grouping and Decomposition Methodology for Machining Process to Assist the Design of Flexible Transfer LineSacaguti, A. / Ito, Y. / Slunno, H. / ISATA / ENEA; Agency: Italy et al. | 1993
- 383
-
Artificial neural networks: theory and applications in manufacturingOkafor, A.C. et al. | 1993
- 383
-
93LM033 Artificial Neural Networks Theory and Applications in ManufacturingOkafor, A. C. / ISATA / ENEA; Agency: Italy et al. | 1993
- 391
-
Intelligent machining monitoring and diagnostics for unmanned/lean manufacturing using neural networks and expert systemsOkafor, A.C. et al. | 1993
- 391
-
93LM034 Intelligent Machining Monitoring and Diagnostics for Unmanned/Lean Manufacturing using Neural Networks and Expert SystemsOkafor, A. C. / ISATA / ENEA; Agency: Italy et al. | 1993
- 401
-
93LM025 Lean Production Through Massively Parallel ComputingWilliamson, I. P. / ISATA / ENEA; Agency: Italy et al. | 1993
- 409
-
93LM067 A User-Friendly Variation Design Method for Free-Form Surfaces Using a Fundamental Polyhedral ShapeKitajima, K. / Tagashira, T. / Wada, Y. / ISATA / ENEA; Agency: Italy et al. | 1993
- 417
-
Sheet metal quality improvement via stamping and assembly plant communicationHageniers, O.L. et al. | 1993
- 417
-
93LM021 Sheet Metal Quality Improvement Via Stamping and Assembly Plant CommunicationHageniers, O. L. / ISATA / ENEA; Agency: Italy et al. | 1993
- 425
-
Selection of press tools for punching operationsSingh, U.P. / Urquhart, W. / Klingenberg, W. et al. | 1993
- 425
-
93LM055 Selection of Press Tools for Punching OperationsSingh, U. P. / Urquhart, W. / Klingenberg, W. / ISATA / ENEA; Agency: Italy et al. | 1993
- 443
-
93LM086 From Design through to Production. Powerful Modelling and High Performance A1 Tools will provide the Core of Support to Satisfy the Demanding "Lean Production" Operational and Machine Control RequirementsTaylor, A. / ISATA / ENEA; Agency: Italy et al. | 1993
- 451
-
93LM068 Knowledge-based Dynamic Scheduling System for the Manufacture of Stamping DiesNakashima, Y. / Takumori, T. / Wada, H. / Namiki, A. / ISATA / ENEA; Agency: Italy et al. | 1993
- 451
-
A reference model and knowledge based approach to the specification of shop floor control systems in lean manufacturing environmentsKochhar, A.K. / Thacker, S.M. et al. | 1993
- 459
-
Integrated shop floor control in automotive supplier industries: prerequisite for lean productionMendonca, J.M. / Schulte, J.W. et al. | 1993
- 459
-
93LM082 A Reference Model and Knowledge Based Approach to the Specification of Shop Floor Control Systems in Lean Manufacturing EnvironmentsKochlar, A. K. / Thacker, S. M. / ISATA / ENEA; Agency: Italy et al. | 1993
- 467
-
93LM081 Integrated Shop Floor Control in Automotive Supplier Industries: Prerequisites for Lean ProductionMendonca, J. M. / Schulte, J. W. / ISATA / ENEA; Agency: Italy et al. | 1993
- 467
-
93LM036 A Cooperative Assistant System for Factory Layout PlanningKloth, M. / ISATA / ENEA; Agency: Italy et al. | 1993
- 475
-
93LM037 Factory Control and Factory SimulationHarland, J. / ISATA / ENEA; Agency: Italy et al. | 1993
- 483
-
93LM039 AnySIM - 3-D-Graphic Simulation for Better and Faster Design of Manual Work SystemsLinner, S. / Kummetsteiner, G. / ISATA / ENEA; Agency: Italy et al. | 1993
- 491
-
93LM054 Development of Industrial Sheet Metal Forming Processes Using Computer SimulationHeath, A. N. / Pickett, A. K. / Ulrich, D. / Di Pasquale, E. / ISATA / ENEA; Agency: Italy et al. | 1993
- 499
-
93LM009 Open Programmable Controller SoftwareVan Bekku, J. C. / ISATA / ENEA; Agency: Italy et al. | 1993
- 505
-
93LM014 A Flexible Approach to Programming ECU'sBrook, A. R. / ISATA / ENEA; Agency: Italy et al. | 1993
- 511
-
Industrial robots for line-synchronized assemblyDirndorfer, A. et al. | 1993
- 511
-
93LM038 Industrial Robots for Line-Synchronized AssemblyDirndorfer, A. / ISATA / ENEA; Agency: Italy et al. | 1993
- 517
-
93LM084 General Purpose Scalable Motion/Vision ControllersCampbell, J. / Cencik, P. / ISATA / ENEA; Agency: Italy et al. | 1993
- 525
-
93LM031 The Shingo Prize for Excellence in Manufacturing: A Paradigm for Lean Quality and Productivity PerformanceRobson, R. E. / ISATA / ENEA; Agency: Italy et al. | 1993
- 533
-
93LM062 Implementation of the International Quality Standard ISO 9000 and BeyondDoran, E. / ISATA / ENEA; Agency: Italy et al. | 1993
- 541
-
93LM092 Developments, Products and Services of the Russian Technology Centre in Automobile-BuildingPodsoblyaev, S. V. / Gladkov, V. I. / Dobrinsky, E. S. / ISATA / ENEA; Agency: Italy et al. | 1993
- 549
-
Intelligence Vehicle Highway Systems (IVHS):- "To Be or Not To Be?"Czernik, D. E. / ISATA / ENEA; Agency: Italy et al. | 1993