'Quasi Honing' of Polygon Surface (English)
- New search for: Szabo, O.
- New search for: Szabo, O.
- New search for: Dar-el, E. M.
- New search for: Karni, R.
- New search for: Herer, Y. T.
In:
Production research
;
286-290
;
1995
-
ISBN:
- Conference paper / Print
-
Title:'Quasi Honing' of Polygon Surface
-
Contributors:
-
Conference:13th International conference, Production research ; 1995 ; Jerusalem
-
Published in:Production research ; 286-290
-
Publisher:
- New search for: Fruend Publishing House
-
Publication date:1995-01-01
-
Size:5 pages
-
Remarks:Theme title: Global frontiers in manufacturing. Also known as ICPR
-
ISBN:
-
Type of media:Conference paper
-
Type of material:Print
-
Language:English
-
Keywords:
-
Source:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Table of contents conference proceedings
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 3
-
Strength and Power Multiplication Factors in Peace TimeNaveh, B.-Z. et al. | 1995
- 13
-
Business Reengineering - Report on Industrial Practices and ExperiencesBullinger, H.-J. / Wiedmann, G. et al. | 1995
- 16
-
Genetic-Neuro Scheduling WorkshopDagli, C. H. / Siong, B. et al. | 1995
- 19
-
ICPR95 Workshop: Methodological Issues in the Design of Work-Breakdown Structure (WBS) for a ProjectGloberson, S. et al. | 1995
- 21
-
A Workshop on Data Envelopment Analysis: General Principles and Application AreasGolany, B. et al. | 1995
- 24
-
Computer Aided Process Planning by Nature Inspired Machine IntelligenceLeung, H. C. / Hines, E. L. / Raja, V. H. et al. | 1995
- 29
-
A Model of Intelligent CAD-CAP-CAM Interface in CIMBalic, J. / Brezocnik, M. et al. | 1995
- 32
-
Computer Aided Manufacturing of Rotors for Centrifugal Compressors on a Four Axis Milling MachineBohez, E. L. J. et al. | 1995
- 35
-
Design of a Modular Networked Manufacturing PlantCantamessa, M. / Villa, A. et al. | 1995
- 38
-
Application of Empirical Based Manufacturing Research ParadigmChung, W. W. C. / Li, K. C. / Chik, S. K. O. et al. | 1995
- 41
-
Development of Knowledge Based Systems in Object-Oriented EnvironmentCosic, I. / Govedarica, M. / Zivkovic, B. et al. | 1995
- 44
-
Manufacturing Knowledge Acquisition and Utilization by Means of Expert SystemsFourie, C. J. / Van Niekerk, T. I. et al. | 1995
- 47
-
Developing Procedure for Modeling Rotationaly Mechanical Parts with Unrotationalying Retreat of the FormGecevska, V. / Pavlovski, V. et al. | 1995
- 50
-
Development of a Low Cost CIM System for Electronic ManufactureHillery, M. T. / Kehoe, A. J. et al. | 1995
- 53
-
The Elements and Functions of Hierarchical Scheduling SystemIchimura, T. et al. | 1995
- 56
-
Technology Transfer: The Transition ZoneIunius, R. F. et al. | 1995
- 59
-
A Concept for Decentralized and Collaborative Production ManagementKuhlmann, T. / Massow, C. et al. | 1995
- 62
-
Approach to the Computer Integrated Toyota Production SystemKuroiwa, S. et al. | 1995
- 65
-
Datalog - A Production Planning and Control SystemLevy, U. et al. | 1995
- 68
-
Constructing Generalization Trees for Manufacturing Knowledge AcquisitionLoksh, S. / Karni, R. et al. | 1995
- 71
-
Impact of Communications Infrastructure on Production SitesMoore, J. M. / Larson, K. et al. | 1995
- 74
-
Solving Machine Loading Problem of FMS by Conjoint MeasurementMukhopadhyay, S. K. / Tiwari, M. K. et al. | 1995
- 77
-
Parallel and Distributed Models of Integration in Production SystemsNof, S. Y. et al. | 1995
- 80
-
Design of a Simulation Library for CIMPollatschek, M. A. et al. | 1995
- 83
-
Performance Measurement in an Enterprise ModelPrytz, K. et al. | 1995
- 86
-
An Enterprise Response Model for Computer Integrated Manufacturing SystemsSheahan, C. / Hillery, M. T. / Williams, P. et al. | 1995
- 89
-
High Reliability Design of Computer Integrated Multi-Stage Machining SystemsShimoda, Y. / Sakurai, F. et al. | 1995
- 92
-
Calibration Strategies and Tools for Off-Line Programming of Robotic WorkcellsSimon, G. / Parker, G. et al. | 1995
- 95
-
Analysis and Design of Information Systems for a Computer Controlled Manufacturing EnvironmentSless, A. / Arzi, Y. / Sipper, D. et al. | 1995
- 98
-
Computer Aided Edge Wearing PredictionZebala, W. et al. | 1995
- 103
-
Predicting the BottlenecksBedwell, M. et al. | 1995
- 106
-
Teaching Operations Management: Experimental Learning, Games and WorkshopsGilgeous, V. et al. | 1995
- 109
-
Problem Based Learning in Engineering Education for Better Systems ThinkingGranath, J. A. et al. | 1995
- 112
-
Teaching Engineering Mathematics through Computer TechnologyMaull, W. / Berry, J. / Stockel, C. et al. | 1995
- 117
-
A Design Assurance Model to Support a Multi-Plant, World Class Manufacturing OrganizationAl-Shaghana, K. / Mcgrath, J. et al. | 1995
- 120
-
Quality Strategies in International Enterprises - A Case StudyBlaafield, H. / Hautanen, M. / Mulari, J. / Takala, J. et al. | 1995
- 123
-
Performance Measurement to Justify and Evaluate Implementation of Just in TimeBredrup, H. et al. | 1995
- 126
-
Characteristics of the Production Planning and Control Process Influencing PerformanceBredrup, R. et al. | 1995
- 129
-
Global Manufacturing - A Matter for Small to Medium Sized Enterprises (SME's)?Bruun, P. et al. | 1995
- 132
-
A Planning Model for Multi-Site Production: An Object-Oriented ApproachBullinger, H.-J. / Fahnrich, K.-P. / Laubscher, H.-P. et al. | 1995
- 135
-
The Impact of Task and Work Structure on the Effectiveness of Implementing Concurrent Engineering in American IndustriesDuffy, V. G. / Salvendy, G. et al. | 1995
- 138
-
Human Aspects of Implementing Advanced Manufacturing Systems in Polish IndustryFertsch, M. et al. | 1995
- 141
-
JIT Manufacturing: Opportunities and Problems in a Developing Country IndustryGomez, M. C. / Mejia, C. A. / Pati�o, G. et al. | 1995
- 144
-
The Role of Manufacturing Strategy Within a Business Process Re-Engineering Change ProgrammeGreswell, T. J. / Maull, R. S. / Childe, S. J. / Bennett, J. et al. | 1995
- 147
-
Developing Manufacturing Strategy Based on Market InputsImam, S. A. / Prabhaker, P. R. / Hassan, M. Z. et al. | 1995
- 150
-
Adaptation of Japanese Manufacturing Management Practices: A Case Study of an Indian OrganizationIyer, K. / Mohanty, R. P. et al. | 1995
- 153
-
Implementation Issues of Computer Integrated Manufacturing (CIM) in Indian ScenarioJain, K. / Avinash, S. et al. | 1995
- 157
-
Concurrent Engineering Design Using Interval MethodsKarni, R. / Belikoff, S. et al. | 1995
- 160
-
TQM and Lean Production - Different Approach But Same Toolbox for ImprovementsKoether, R. et al. | 1995
- 163
-
JIT Implementation in a Norwegian Furniture CompanyLungaard-Soug, G. et al. | 1995
- 166
-
Creative Problem Solving in Engineering DesignMaimon, O. / Horowitz, R. et al. | 1995
- 169
-
Development of the Technological Competitiveness of SME's in ExportsMaunuksela, A. / Takala, J. et al. | 1995
- 172
-
The Lean Production System: Different Implementation Approaches and EvolutionMuffatto, M. et al. | 1995
- 175
-
Quality by Requirement Orientated Re-Use of Similar PartsMueller, D. H. / Bottcher, T. / Tietjen, T. et al. | 1995
- 178
-
The Comparison of the Concept of Digital Factory and Kanban System from the View of Information Flow and Cultural EnvironmentNeves, L. M. P. A. / Ota, M. et al. | 1995
- 181
-
Achieving Stability of the System of an Enterprise Within Emerging EconomyNikeshin, S. / Nimchin, A. et al. | 1995
- 184
-
Standard Industrial Classification: What Standard?Roberts, L. / Jones, C. et al. | 1995
- 187
-
Partial Implementation of JIT in a Make to Order EnterpriseSkjelstad, L. / Bredrup, H. et al. | 1995
- 190
-
The Need for Strategic Evolution Management in Manufacturing EnterprisesSmeds, R. et al. | 1995
- 193
-
Rationality and Foresight in the Inventory Investment Decision: The Evidence from Macroeconomic DataStern, A. / Halpern, N. et al. | 1995
- 195
-
Effects of Recycling on the Flowability of ThermoplasticsSy, D. E. / Wong, A. C.-Y. / Cheung, H. K. et al. | 1995
- 198
-
Buffer Allocation in JIT Ordering SystemsTakahashi, K. / Nakamura, N. et al. | 1995
- 201
-
Coordination and Management of Production in Extended Enterprises-Results of a European Research StudyThaler, K. et al. | 1995
- 204
-
Decision-Making of Business StrategyWatada, J. et al. | 1995
- 207
-
Driving Forces, Obstacles and the Consequences for Measures Taken in Lead-Time Reduction WorkWedel, J. E. / Lumsden, K. R. et al. | 1995
- 210
-
Strategies for Lead-Time Changes and Their Influence on the Change ProcessWedel, J. E. / Lumsden, K. R. et al. | 1995
- 213
-
The Division of Large Complex Production Systems, into Independent, Autonomous UnitsZelenovic, D. M. / Burbidge, J. L. / Cosic, I. P. / Maksimovic, R. M. et al. | 1995
- 216
-
Evaluating a Products End-of-Life Value for RecyclingZussman, E. / Pnueli, Y. et al. | 1995
- 221
-
Design and Analysis of a Special Milling Cutter for Metallic Honeycomb Machining ApplicationsAppukuttan, K. K. / Patil, J. / Nair, P. S. et al. | 1995
- 225
-
Application of a No Contact Capacitive Sensor to Mechanical Working ControlCaiazzo, F. / Palazzo, G. S. / Pasquino, R. et al. | 1995
- 228
-
Fine Blanking of Steel PlatesCaloska, J. / Lazarev, J. et al. | 1995
- 231
-
Design & Testing of Piezoelectric Actuator-Controlled Boring Bar to Compensate for Cutting Force-Induced Errors in Variable Depth-of-Cut ConditionsChiu, W. M. / Chan, K. W. et al. | 1995
- 234
-
A Study of Normal Force Change Under the Difference of Specific Cutting Resistance in Lathe Chatter (Part II)Iwata, Y. et al. | 1995
- 237
-
An Analysis for Justification of Applying Welding Technology at Spiral Drills ProductionJecmenica, R. M. / Droibnjak, V. / Milosevic, M. V. et al. | 1995
- 241
-
A Study on the Optimal Ultraprecision Cutting Condition by Nose Radius of Single Crystal Diamond ToolKim, J.-D. et al. | 1995
- 244
-
Finite Element Analysis of the Stress-Strain Condition in the Process of Fine BlankingKocov, A. / Lazarev, J. / Strezov, V. et al. | 1995
- 247
-
Mass Production-Process Planning with Regard to the Product PriceKopac, J. / Dolinsek, S. / Sokovic, M. et al. | 1995
- 250
-
Investigation of Chip Formation During MillingKovac, P. / Sidjanin, L. et al. | 1995
- 253
-
Mechanism of Material Removal in the Magnetic Abrasive Process and the Accuracy of MachiningKremen, G. Z. / Elsayed, E. A. / Rafalovich, V. I. et al. | 1995
- 256
-
Role and Significance of Setting and Measuring on the Cutting Tool in Flexible Manufacturing SystemsKuzinovski, M. / Cichosz, P. / Pavlovski, V. / Zebrowski, H. et al. | 1995
- 259
-
A New Concept in Wire Cut EDM Process and Machine Tool Design for Special ProfilesLiu, J. / Xia, Z. et al. | 1995
- 262
-
Optimal Control of a Tool-Wear ProcessMakis, V. et al. | 1995
- 265
-
Injection Moulding Process with Automated Visual FeedbackMarsh, R. / Stamp, R. J. et al. | 1995
- 268
-
Concept of the System for Automated Machine Tools Main Drive Gearbox DesignNavalusic, S. / Gatalo, R. / Konjovic, Z. et al. | 1995
- 271
-
Influence of Dressing Parameters on Grinding Performance of CBN/Seeded Gel Hybrid Wheels in Cylindrical GrindingPrusak, Z. / Webster, J. A. / Marinescu, I. D. et al. | 1995
- 274
-
The Effect of Tribological Processes on Reliability of Rolling BearingsRakic, R. et al. | 1995
- 277
-
Optimal Tool Replacement Based on Tool Life Distributions in Multi-Stage Machining SystemsSakurai, F. / Shimoda, Y. et al. | 1995
- 280
-
Prognosis of the Mean and External Time Value of Failure of the Cutting Tools Based on Its ReliabilitySekulic, S. et al. | 1995
- 283
-
Development of Drill Geometry for Drilling of Human BoneShuaib, I. / Hillery, M. T. et al. | 1995
- 286
-
'Quasi Honing' of Polygon SurfaceSzabo, O. et al. | 1995
- 291
-
Optimal Policies for an Integrated Production-Distribution SystemAkoka, J. et al. | 1995
- 294
-
Sensitive Analysis of a Production Systems Designed Through Group Technology Opposite Variations of the Master Schedule Application to a Job ShopAndres, C. / Poler, R. / Ortiz, A. / Ros, L. et al. | 1995
- 297
-
An Analysis of the Performances of Order Overplanning for Managing Lumpy DemandBartezzaghi, E. / Verganti, R. et al. | 1995
- 300
-
Proposition of an Information System with Multiple Points of View for an Assembly Operation Generation Using the Acquired ExperienceBergeonneau-Nervi, M.-L. / Brun-Picard, D. / Kieffer, J.-P. et al. | 1995
- 303
-
The New Generation of Two-Dimensional Bar Code SymbologiesBidanda, B. / Billo, R. E. / Cohen, Y. et al. | 1995
- 306
-
Self-Scheduling for Flexible Manufacturing Systems: A Product-Oriented ApproachBrun-Picard, D. / Baboli, H.-A. et al. | 1995
- 309
-
Hierarchical Design of Team Oriented Assembly SystemsBukchin, J. / Dar-El, E. M. / Rubinovitz, J. et al. | 1995
- 312
-
Real-Time Operational Control of FMSs with Flexible Operation Sequencing and Failure-Prone MachinesByrne, M. D. / Chutima, P. et al. | 1995
- 315
-
Integrated Process Planning & Scheduling Based on EnvironmentCarvalho, J. D. A. / Gindy, N. N. Z. et al. | 1995
- 318
-
Some Results from Applying a Flexible Concept of Assembly Systems and Designing Assessment of the Simulation EffectsCosic, I. / Anisic, Z. / Radlovacki, V. et al. | 1995
- 321
-
Modelling the Successful Mechanism of Military Base Transition with Human Measures and the Implications for ManufacturingDuffy, V. G. / Sparrow, F. T. / Koubek, R. J. et al. | 1995
- 324
-
Sensor Selection Procedures and Economy PrinciplesEdan, Y. / Nof, S. Y. et al. | 1995
- 327
-
A Method for Evaluation of Production Concepts for Small-Volume Batch Production of High Technology Products in the Electronics IndustryFagerlind, G. et al. | 1995
- 330
-
Revised Heuristic Algorithm for Loading Problems in Dedicated Manufacturing SystemsGencyilmaz, G. / Esnaf, S. et al. | 1995
- 334
-
The Optimization of the Residual Tool Life in Flexible Manufacturing SystemGiardini, C. / Ceretti, E. / Maccarini, G. et al. | 1995
- 337
-
Research Into the Correlation Between an Increase in Working Time and Productive Flow in Manufacturing IndustryGuerra, F. / Braga, G. et al. | 1995
- 340
-
Job Sequencing and Component Setup on a Surface Mount Placement MachineGuenther, H. O. / Gronalt, M. / Zeller, R. et al. | 1995
- 343
-
Designing and Managing Closed Tree-Structured Assembly SystemsHazra, J. / Seidmann, A. et al. | 1995
- 346
-
An Integrative Approach to the Inventory Routing ProblemHerer, Y. T. / Levy, R. et al. | 1995
- 349
-
Analysis on Logistics of an European Company in Process IndustriesImppola, J. J. / Takala, J. et al. | 1995
- 352
-
Materials Flow Effectiveness in Press OperationsJohansson, M. I. / Medbo, P. et al. | 1995
- 355
-
An Optimal Control Scheduling Method for Setup LocalizationKogan, K. / Khmelnitsky, E. / Shtub, A. / Maimon, O. et al. | 1995
- 358
-
Development of Strategic Competitive Advantage within the Industrial Sector Through the Systematic SupplierKoivisto, E. / Takala, J. et al. | 1995
- 361
-
Strategic Adoption of a Flexible Manufacturing System: A Case Study of an Indian Electronic EnterpriseMohanty, R. P. / De, R. / Banwet, D. K. / Deshmukh, S. G. et al. | 1995
- 364
-
Lead Time Analysis- The First Step Against Shorter Lead TimesMolinder, A. et al. | 1995
- 367
-
Application of Goal Programming for Optimum Product Mix in a Textile MillNakajima, M. / Suresh, M. N. / Matsuo, T. et al. | 1995
- 370
-
Human-Computer Cooperative Work in Multi-Agent Manufacturing SystemNakamura, N. / Takahara, J. / Kamigaki, T. et al. | 1995
- 373
-
Working with FMS: The Experience of Indian UsersNarain, R. / Yadav, R. C. et al. | 1995
- 376
-
Acceptance of Working Aids Used in an Assembly ProcessNilsson, S. / Ingelgard, A. et al. | 1995
- 379
-
Design and Evaluation of Assembly Systems - A Study of Ten Swedish Manufacturing CompaniesOhrstrom, P. / Bellgran, M. et al. | 1995
- 382
-
The Integrated Production, Distribution, and Marketing Planning Models Concerned with Customer SatisfactionOta, M. et al. | 1995
- 385
-
Investigation of the Production/Assembly Line Phenomenon in the Industrial OrganizationsPolenakovik, R. / Kralev, T. et al. | 1995
- 388
-
Development of Methodology Manufacturing Systems DesignRos, L. / Vicens, E. / Chalmeta, R. / Gasco, J. et al. | 1995
- 391
-
Assembly Line Balancing for Tasks Requiring Special Tooling and Controlled EnvironmentsRubinovitz, J. / Finkelbrand, I. et al. | 1995
- 393
-
Analysis of Multilevel Production - Inventory System in MRPSadiwala, C. M. et al. | 1995
- 396
-
Schedule Optimisation for a Computer Integrated Manufacturing SystemsSheahan, C. / Hillery, M. T. et al. | 1995
- 399
-
Low Volume Flexible Assembly by Self Correcting SoftwareStamp, R. J. et al. | 1995
- 402
-
Learning in Setups: Analysis, Minimal Forecast Horizons and AlgorithmsTzur, M. et al. | 1995
- 405
-
Problems of a Continuous Change- A Follow-Up Study (1988-1994) in a FMS FactoryVartiainen, M. et al. | 1995
- 408
-
Extending Existing Lot Streaming TechniquesWeeda, P. J. et al. | 1995
- 411
-
Analytical Determination of Job Division in Manual Assembly SystemsZuelch, G. / Braun, W. J. / Schiller, E. F. et al. | 1995
- 417
-
Multi-Product Capacity Planning ModelAskar, M. / Imam, S. A. / Hassan, M. Z. et al. | 1995
- 420
-
Flexible Layout Configuration for Coping with Changes in Product DesignBarad, M. / Moodie, C. L. et al. | 1995
- 423
-
Innovation Paths in Product Development: An Empirical ResearchBoschi, D. / Buzzacchi, L. / Calderini, M. / Cantamessa, M. et al. | 1995
- 426
-
Rapid Prototyping - A Method for the Development of Innovative ProductsBullinger, H.-J. / Fischer, D. / Woerner, K. et al. | 1995
- 429
-
Redesign of Electric Components for the Flexible Automated AssemblyCramer, R. et al. | 1995
- 432
-
An Empirical Evaluation of the Effect of Some Factors on the Design of Computer Simulation StudiesCrawford, J. W. / Gallwey, T. J. et al. | 1995
- 435
-
Organizing Goods Flow Control: An Integrated Design MethodologyDe Vries, J. et al. | 1995
- 438
-
Architecture of a Distributed Simulation System for Virtual ManufacturingFujii, S. / Kidani, Y. / Ogita, A. / Tsunoda, H. et al. | 1995
- 441
-
Economic Criteria of Buffer Utilization with an Unreliable MachineGilboa, I. / Herer, Y. T. / Kaspi, H. et al. | 1995
- 444
-
Multi-Disciplinary Collective Design Methods for Strategic Design of Production SystemsGranath, J. A. / Lindahl, G. A. / Rehal, S. et al. | 1995
- 447
-
Designing an Automated Production Line with Unreliable Multi-Functional Parallel Machines to Maximise ProfitKalir, A. / Arzi, Y. et al. | 1995
- 450
-
On-Line Simulation on Ongoing System for Real-Time AGV ControlKamigaki, T. / Takahara, J. / Nakamura, N. et al. | 1995
- 453
-
Jigs and Fixture Design Expert System on PCKang, J.-S. / Feng, Y.-J. / Zhang, X.-F. / Ma, P.-L. et al. | 1995
- 456
-
Design Validation: Using Virtual Prototypes for Product Design and Product EvaluationKern, P. / Riedel, O. et al. | 1995
- 459
-
A New Concept of Technology StrategyKeskinen, S. / Takala, J. et al. | 1995
- 462
-
Design of Cell-Line Systems for Job Shop ManufacturingKuroda, M. / Aoki, K. / Simoyashiro, S. / Maeda, K. et al. | 1995
- 465
-
Design Service into the Product: A New Challenge in ManufacturingMathe, H. et al. | 1995
- 468
-
Multi-Objective Optimization Approach to Product DesignMyint, S. / Tabucanon, M. T. et al. | 1995
- 471
-
Methods for Appraising the Output of Design and Benchmarking Design PerformanceO'Brien, C. / Smith, S. J. E. et al. | 1995
- 474
-
Integrated Approach to Decision Support for Choosing Between Process and Cellular Layouts Under Different Production Control SystemsO'Brien, C. / Chiadamrong, N. et al. | 1995
- 477
-
Production Planning Problems in Cellular ManufactureRiezebos, J. et al. | 1995
- 480
-
Criticality of a LayoutSarin, S. C. / Mishra, P. et al. | 1995
- 482
-
Automatic Synthesis of Optimum Design Layout by an Algorithmic ApproachShetty, D. et al. | 1995
- 485
-
Layout of Beacons for Triangulation of AGV's in Industrial EnvironmentsShoval, S. / Zeitoun, I. / Lenz, E. et al. | 1995
- 488
-
Designing of the Segmented Flow Topology (SFT) for Discrete Material Flow SystemsSinriech, D. / Tanchoco, J. M. A. et al. | 1995
- 491
-
Criterions for Classification of Mechanical Parts According to the Convenience for Their Machining on Machining CentersTrajkovski, S. et al. | 1995
- 494
-
The Role of Process Characteristics in (Re)Designing Supply Chain RelationshipsVan der Vaart, T. et al. | 1995
- 497
-
An Approach to Defining Machine Cells Using Cluster AlgorithmVeza, I. et al. | 1995
- 500
-
The Application of Simulation in Designing an Automated Storage and Retrieval SystemWorrall, B. M. / Jaishankar, S. et al. | 1995
- 503
-
Application of Scanning Technology in Product Design and ManufactureZhang, P. / Qiao, Z. et al. | 1995
- 509
-
Performance Analysis of Cellular, Job Shop and Hybrid Manufacturing Systems: A Simulation StudyAlbino, V. / Garavelli, A. C. et al. | 1995
- 512
-
Real Time Production Control of an Unmanned CMS Operated in Produce-to-Order EnvironmentArzi, Y. / Sipper, D. et al. | 1995
- 515
-
Flexibility Measures from the Perspective of Quality and CollaborationBarad, M. / Nof, S. Y. et al. | 1995
- 518
-
Measures of Flexibility in Queueing SystemsBrill, P. / Mandelbaum, M. et al. | 1995
- 521
-
The Rate of Equipment Utilization - An Indicator of Production Organization BonityBuble, M. / Pavic, I. et al. | 1995
- 524
-
Tensile Strength of Polyethylene MeltCheung, H. K. / Wong, A. C.-Y. / Sy, D. E. et al. | 1995
- 527
-
Production Budgets and Costing Standards Using Mathematical Simulation from Financial DataColville, E. J. et al. | 1995
- 530
-
Towards a Theoretical Base for Material Requirements PlanningGrubbstrom, R. W. et al. | 1995
- 533
-
A Reliable Method of Measuring the Machinability of Alloyed Austempered Ductile Iron (ADI)Seah, K. H. W. / Sharma, S. C. et al. | 1995
- 536
-
A Systems Approach to Flexibility Measurement and AnalysisShewchuk, J. P. / Moodie, C. L. et al. | 1995
- 541
-
Corporate Learning with Project ManagementAyas, K. et al. | 1995
- 544
-
Project Control Model with Variable Speeds and Inspection PointsGolenko-Ginzburg, D. / Gonik, A. et al. | 1995
- 547
-
Decomposing and Coordinating the Work in Large Scale Engineer-to-Order ProjectsHanssen, R. W. et al. | 1995
- 550
-
Advanced Project Management in One-of-a-Kind ProductionKuhlmann, T. et al. | 1995
- 553
-
Tackling Risks in Project ManagementPalo, J. T. / Similae, J. K. / Kess, P. A. / Maupetit, C. D. et al. | 1995
- 556
-
Portfolio of Multi-Locational Projects: The Differential Perspective for ControlTeltumbde, A. et al. | 1995
- 559
-
Do the Discrete Performance Standards Really Serve the Project Control?Teltumbde, A. et al. | 1995
- 565
-
A Case Based Process Planning System for Prismatic PartsBen Arieh, D. / Chopra, M. et al. | 1995
- 568
-
On the Use of Simulated Annealing in Flowshop Scheduling Problems with Minimization of MakespanBraglia, M. / Gentili, E. et al. | 1995
- 571
-
A Predictive Neural Network Modelling System for Process PlantsCavalieri, S. / Garetti, M. / Taisch, M. et al. | 1995
- 574
-
A Study of Neural Network Control Charts for Various Production ProcessesChang, S. I. / Buddhavarapu, M. S. et al. | 1995
- 577
-
Pattern Classification and Recognition System for the Automatic Guidance of Load-Haul-Dump Vehicles in Underground MiningCordova, F. / Quezada, L. / Salinas, R. / Perez, E. et al. | 1995
- 580
-
A Worker-Randomness Model of Task Completion TimeDoerr, K. / Arreola-Risa, A. et al. | 1995
- 584
-
Cost Reduction Strategies for Automatic Warehousing SystemsEben-Chaime, M. / Pliskin, N. et al. | 1995
- 587
-
A Study on Production Lines with Discrete Batch Wip Inventory TransferErel, E. et al. | 1995
- 590
-
A Generalized Control Model for Man-Machine Production Systems with DisturbancesGolenko-Ginzburg, D. / Kats, V. et al. | 1995
- 593
-
Lateral Stock Transshipments in a Two-Location Inventory SystemHerer, Y. T. / Rashit, A. et al. | 1995
- 596
-
Scheduling with Learning CapabilitiesKarni, R. / Fournier, F. et al. | 1995
- 599
-
Optimal (s'S)-Control of Job Acceptance and Rejection in a Manufacturing SystemKoechel, P. et al. | 1995
- 602
-
A Parallel Genetic-Neuro Scheduler for Job-Shop SchedulingLee, H. C. / Dagli, C. H. et al. | 1995
- 605
-
A Travel Sequencing Algorithm for Robotic Arc WeldingLevitin, G. / Rubinovitz, J. et al. | 1995
- 609
-
A Simple Heuristic for Scheduling on Single Machine to Minimize Total TardinessLiu, J. et al. | 1995
- 612
-
An Adaptive Optimization Model for Scheduling in Dynamic EnvironmentsLiu, J. et al. | 1995
- 615
-
A Fuzzy Job Oriented Method for Dynamic Scheduling in Multiple Objective Production EnvironmentLo Nigro, G. / Perrone, G. / Noto La Diega, S. et al. | 1995
- 618
-
Multiresolution Analysis of Flexible Manufacturing SystemsMaimon, O. / Shmilovici, A. et al. | 1995
- 621
-
Comparative Analysis of Production Control Systems for Batch Production EnvironmentsMasin, M. / Dar-El, E. M. / Herer, Y. T. et al. | 1995
- 624
-
Perishable Inventory Control Subject to the Warehouse CapacityNose, T. / Adachi, Y. / Kuriyama, S. / Ishii, H. et al. | 1995
- 627
-
Automated Decision Support for Rescheduling and Optimization Tasks within a Simulation-Based Production ControlReinhart, G. / Martin, C. / Heitmann, K. et al. | 1995
- 630
-
Due-Date Dispatching and Markovian Analytical ModelsRossini, C. / Zavanella, L. et al. | 1995
- 633
-
A General Methodology for Planning and Scheduling Operations in Manufacturing and ServicesSalazar, E. H. et al. | 1995
- 637
-
Modelling Business Processes in Production Systems by a Multiple Dynamic Network ApproachSchjaer-Jacobsen, H. et al. | 1995
- 640
-
A Production Management Expert System Developed in TirsToal, D. / Coffey, T. / Smith, P. / Skehill, A. et al. | 1995
- 643
-
Selecting the Best Multi-Dimensional Sizes to Make and Stock with Downward SubstitutionTripathy, A. / Gerchak, Y. et al. | 1995
- 649
-
TQM Saves LifeAmid, M. / Bar-Lev, D. et al. | 1995
- 652
-
Design of a Decision Support System for Printed Wiring Board AssemblyBard, J. F. / Feo, T. A. / Holland, S. D. et al. | 1995
- 655
-
Re-Engineering Process Plans for Manufacturing Cell Design: A Case StudyBillo, R. E. / Bidanda, B. / Kharbanda, P. et al. | 1995
- 658
-
Organizing for Quality and Innovation in Manufacturing: An Empirical Study on the Impact of Configurations of Quality Assurance Systems on Innovation in Industrial FirmsBodewes, W. E. J. et al. | 1995
- 661
-
A Knowledge Based Expert System for Quality ControlGencyilmaz, G. / Zayim, S. et al. | 1995
- 664
-
Total Quality Management System Based on the Fusion ConceptIshii, K. et al. | 1995
- 667
-
Classifying Benchmarking - A New Approach to Improve the Quality of the Benchmarking ProcessKempf, S. / Siebert, G. et al. | 1995
- 670
-
A Knowledge Base for the Re-Engineering of Manufacturing SystemsKochhar, A. K. / Munoz San Ildefonso, M. I. et al. | 1995
- 673
-
Managing Operations Development ProjectsKosonen, K. / Holmstroem, J. et al. | 1995
- 676
-
An Empirical Study for TQM ImplementationLakhe, R. R. / Mohanty, R. P. et al. | 1995
- 679
-
Relationship Between Quality Cost and Total Quality Management Effort for Indian IndustryMathew, T. / Madrecha, K. M. et al. | 1995
- 682
-
A Model of the Order Flow Process for Implementing Business Process Re-EngineeringMaull, R. S. / Weaver, A. M. / Childe, S. J. / Smart, P. A. et al. | 1995
- 685
-
R&D Quality & Productivity: Measurement and Improvement ProcessMeyersdorf, D. / Bonen, Z. / Dar-El, E. M. et al. | 1995
- 688
-
Victor - Implementing Continuous ImprovementsNaeger, G. / Reithofer, W. et al. | 1995
- 692
-
On-Line Estimation of Process Deterioration from Product Quality MeasurementsPickett, E. E. / Hsu, E. et al. | 1995
- 695
-
Quality Management for Packaging in the Food IndustryRimini, B. / Melloni, R. et al. | 1995
- 698
-
Analyzing the Needs and Directing the Efforts for the Development of Customer Satisfaction in Technically Oriented Finnish Industries - A Case StudySaarinen, J. / Takala, J. et al. | 1995
- 701
-
Optimiization of Surface Roughness Analyzer Using Robust DesignShetty, D. / Roosa, V. D. et al. | 1995
- 704
-
Some Applications of a New Two-Moment Distributional Fitting ProcedureShore, H. et al. | 1995
- 707
-
Business Process Re-Engineering of Customer Driven ManufacturingStrandhagen, J. O. et al. | 1995
- 710
-
Re-Design Manufacturing Process Through Re-EngineeringYung, W. K. C. / Shek, J. et al. | 1995
- 715
-
Speed Tests as a Means for Organizational Learning During Start-Up in New Production SystemsAlmgren, H. et al. | 1995
- 718
-
A Macro Ergonomic Approach to Total Quality ManagementAxelsson, J. R. C. et al. | 1995
- 721
-
The Use of Some Ergonomic Methods as Tools in Quality ImprovementAxelsson, J. R. C. / Odenrick, P. et al. | 1995
- 724
-
Impact of Technological Productivity on ManufacturingBilich, F. et al. | 1995
- 727
-
Top Management and Human Factors in Manufacturing IndustryBolwijn, P. T. / Kumpe, T. et al. | 1995
- 730
-
A New Generation of Work Measurement Systems for Manufacturing & Industrial ApplicationsCohen, Y. / Bidanda, B. / Billo, R. E. / Zandin, K. B. et al. | 1995
- 733
-
Automatic Vs Manual Manufacturing in the Diamond IndustryGilad, I. et al. | 1995
- 736
-
Manpower Assessment and Planning Strategies in a Process Industry: An Important Step Towards TQMGuin, K. K. / Ray, P. K. et al. | 1995
- 739
-
Work Load Dose and Materials Handling Efficiency - A Method to Evaluate the Design of Materials Flow SystemsJohansson, M. I. / Karlsson, H. / Mathisson, B. / Oertengren, R. et al. | 1995
- 742
-
Productivity Measurements in Civil Engineering Using Best PracticeJonsson, J. / Albriktsen, R. O. / Foersund, F. R. et al. | 1995
- 745
-
Improving Productivity Via Technology and ManagementKao, C. et al. | 1995
- 748
-
Senior Citizen Labor in Advanced Manufacturing SystemKume, Y. / Sato, N. et al. | 1995
- 751
-
Ergonomic Evaluation of Bicycle Riding PosturesLi, M. / Zhou, Y. / Su, S. et al. | 1995
- 754
-
Human Factors in Lean Production and Social Technical Systems: A Case Study of the Assembly Shop in the Automotive IndustryMolleman, E. / Niepce, W. et al. | 1995
- 757
-
Ergonomic Design of Production Systems in a Computerized EnvironmentNilsson, G. / Oertengren, R. et al. | 1995
- 760
-
A Comparison of Two Different Production Designs for Manual Assembly of Electronic Equipment in Respect to Muscle LoadOdenrick, P. / Fostvedt, F. / Johansson, E. / Vigre, C. et al. | 1995
- 763
-
Effect of Anthropometric Dimensions on Worker Performance in a Combined Manual and Decision TaskOgawa, I. / Raouf, A. et al. | 1995
- 766
-
An Exploration of the Linkage Between Organisational Culture Employee Personality and Productivity: Evidence from Three Diverse OrganisationsOswick, C. et al. | 1995
- 769
-
Ergonomics in Assembly PlanningRally, P. J. / Schipfer, J. et al. | 1995
- 772
-
Throughput Maximization in Production Lines with High Influence of LearningTabucanon, M. T. / Paul, H. / Puspasari, S. S. et al. | 1995
- 775
-
Manpower, Ques and Customer Satisfaction: Making the Connection in the Banking IndustryWangenheim, M. / Tal, Y. / Gast, R. et al. | 1995
- 777
-
Relative Total Factor Productivity in China's Iron and Steel Enterprises: An Application of Data Envelopment Analysis MethodZhou, Y. / Wong, A. C.-Y. / Frankenstein, J. et al. | 1995