Blast furnace best burden quality A first assessment based on simulation tests (English)
- New search for: Chaigneau, R.
- New search for: Husslage, W.
- New search for: Hughes, F.
- New search for: Jernkontoret
- New search for: Chaigneau, R.
- New search for: Husslage, W.
- New search for: Hughes, F.
- New search for: Jernkontoret
In:
European coke and ironmaking congress; ECIC 2005
5
;
Tu1:2
;
2005
-
ISBN:
- Conference paper / Print
-
Title:Blast furnace best burden quality A first assessment based on simulation tests
-
Contributors:
-
Conference:5th, European coke and ironmaking congress; ECIC 2005 ; 2005 ; Stockholm, Sweden
-
Published in:European coke and ironmaking congress; ECIC 2005 , 5 ; Tu1:2EUROPEAN COKE AND IRONMAKING CONGRESS ; 1, 5 ; Tu1:2
-
Publisher:
- New search for: Jernkontoret
-
Place of publication:Stockholm
-
Publication date:2005-01-01
-
Size:Tu1:2
-
ISBN:
-
Type of media:Conference paper
-
Type of material:Print
-
Language:English
-
Keywords:
-
Source:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Table of contents conference proceedings
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
-
Repairing of hot coke oven batteries - one way to maintain the production capacity - SSAB-Plant, SwedenVuorinen, H. / Hippe, W. / Reinke, M. / Jernkontoret et al. | 2005
-
Optimised casthouse operation at ThyssenKrupp Stahl - Realised improvements and future potentialsPeters, M. / Schmole, P. / Ruther, P. / Jernkontoret et al. | 2005
-
Coal blend optimisationPernot, P. / Vogt, D. / Jernkontoret et al. | 2005
-
Blast Furnace hearth lining technology for long-life campaignHille, V. / Heber, R. / Rockstroh, R. / Jernkontoret et al. | 2005
-
Process and economic optimization of by-product plant operation using a dynamic process modelLiszio, P. / Thielert, H. / Leuchtmann, K.-P. / Scheckreiter, D. / Jernkontoret et al. | 2005
-
Design and operational experience with the state-of-the-art control system of the new coking plant SchwelgernWemhoner, B. / Kurbjuhn, U. / Schubert, C. / Jernkontoret et al. | 2005
-
Oil addition to the coal blend at the Ruukki coking plantKerkkonen, O. / Jernkontoret et al. | 2005
-
Improved burden and gas distribution at Port Kembla number 5 blast furnaceDi Giorgio, N. / Austin, P. / Kaye, B. / Chew, S. / Dunning, J. / Sullivan, P. / Jernkontoret et al. | 2005
-
High productivity, low coke rate blast furnace operation at Corus Strip Products IjmuidenBakker, T. / Jernkontoret et al. | 2005
-
Influence of natural gas injection on the operation parameters of iron blast furnaceHalim, K. S.A. / Jernkontoret et al. | 2005
-
Influence of heating patterns on quality and micro structure of cokeSeung-oh, Y. / Kang-In.suk / Sae-yoon, K. / Jernkontoret et al. | 2005
- 1
-
Back to the future - ideas for new blast furnace concepts. The future of the blast furnace process - visions to reduce CO2-emissionsKorthas, Bernd / Peters, Michael / Schmöle, Peter et al. | 2005
-
Coke making technology from VAI Finland - Good for the environment, good for qualityPiirainen, I. / Ritamaki, O. / Jernkontoret et al. | 2005
-
New process of co-coking of waste plastics and blend coalLiao, H.-q. / Zhao, P. / He, Y.-b. / Yu, G.-w. / Cai, J.-j. / Li, B.-q. / Jernkontoret et al. | 2005
-
Continuous improvement of DRI technology in the mittal steel companyTsvik, G. / Farhadi, A. / Sandoval, I. / Braun, U. / Jernkontoret et al. | 2005
-
New hearth lining direction at Salzgitter Flachstahl blast furnace BPethke, J. / Stisovic, T. / Sylven, P. / Jernkontoret et al. | 2005
-
Evolution of sinter quality at Tata SteelYadav, U. S. / Ranjan, A. / Das, B. / Ghosh, S. / Jernkontoret et al. | 2005
-
Recycling of steel-making residues with the PRIMUS process at PRIMOREC S.AHansmann, T. / Jernkontoret et al. | 2005
-
Recent progress of practical BF operations in Japan and innovative trials for the futureNaito, M. / Jernkontoret et al. | 2005
-
Service and monitoring of the coke oven battery at HKM with an integrated Process-Management-System on IT basisKanty, C. / Nelles, L. / Beckmann, H.-B. / Pesy, W. / Jernkontoret et al. | 2005
-
The reduction degradation property of iron ore sinter at Raahe SteelworksKinnunen, K. / Heinanen, K. / Jernkontoret et al. | 2005
-
Modelling the changes in carcinogenic load on coke oven workers due to automation and changing work schedulesvan de Vijver, J. / Jernkontoret et al. | 2005
-
Investigation of chlorine and alkali impacts on the blast furnace operationLin, R. / Hartig, W. / Hochhaus, J. / Jernkontoret et al. | 2005
-
Investigation of factors influenced on coke cake pushing forceAizawa, S. / Uebo, K. / Yoshida, S. / Miyahara, M. / Jernkontoret et al. | 2005
-
Optimized use of BLT® and PCI with intelligent supervisor assistance (SACHEM®), a guarantee for top class BF efficiencyHelleisen, M. / Giroldini, F. / Carmichael, I. / Goffin, R. / Thirion, C. / Jernkontoret et al. | 2005
- 1
-
High productivity operation of Pohang No 4 BFLee, Sang-Hong / Lee, Jong-Bok / Nam, Sang-Jin et al. | 2005
-
Investigation of coke properties while descending through an experimental blast furnaceHilding, T. / Wikstrom, J.-O. / Jahnsen, U. / Kerkkonen, O. / Oyj, R. / Jernkontoret et al. | 2005
-
Blending of Canadian/Australian coals for making high-quality coke for blast furnace ironmakingTodoschuk, T. / Mahoney, M. / Leeder, R. / Giroux, L. / Gransden, J. / Price, J. / Canmet / Jernkontoret et al. | 2005
- 1
-
Coke plant machines automation in Seremange and DunkirkSibille, N. / Andre, J. et al. | 2005
-
Blast furnace thermal control, and aerodynamic monitoring using advanced signal processing methods, in Corus UKWarren, P. / Bell, T. / Jernkontoret et al. | 2005
-
The application of the coke plant age determination process at DofascoLincoln, N. / Carlin, R. / Todoschuk, T. / Leroy, J. M. / Gaillet, J. P. / Jernkontoret et al. | 2005
-
The use of a CFD model for understanding the internal conditions in a blast furnace hearthHuang, D. / Chaubal, P. / Yan, F. / Zhou, C. / Jernkontoret et al. | 2005
-
Extension of sinter pallet width for higher productionMoon, G.-S. / Jernkontoret et al. | 2005
-
Improvement of the environmental situation of blast furnace BF 4 at Rogesa, Dillingen-GermanyHartig, W. / Zewe, H. / Leyser, P. / Wurth, P. / Reufer, F. / Jernkontoret et al. | 2005
-
Advanced carbon refractory blocks for hearth wall lining: Properties and wear resistanceMittag, J. / Jernkontoret et al. | 2005
-
High temperature properties of iron and steelmaking by-product cold bonded pelletsRobinson, R. / Sundqvist-Okvist, L. / Jernkontoret et al. | 2005
-
Installation of a `State of the art' slag granulation plantEisen, P. / Witte, J. / Smith, M. / Harvey, R. / Schumacher, E. / Vuletic, B. / Jernkontoret et al. | 2005
-
Operational and maintenance practices for production with a battery with two heating systemsVuorinen, H. / Krutrok, M. / Rydstrom, K. / Berglund, G. / Jernkontoret et al. | 2005
-
Investigating blast furnace coke samples to improve operational efficiencyPoultney, R. / Bennington, R. / Jernkontoret et al. | 2005
- 1
-
Blast furnace hearth models, reline and cooling philosophiesBonte, Luc / Southern, Stuart M. / Zaimi, S.A. / Kuhl, T. / Giandomenico, F. / Manilla, P. / Inkala, P. / Lesoin, G. / Eisen, P. / Stisovic, T. et al. | 2005
-
The phoenix of non recovery cokemaking and its rapid flightValia, H. / Jernkontoret et al. | 2005
-
ULCOS - European steelmakers efforts to reduce green house gas emissionsBirat, J.-P. / Hanrot, F. / Jernkontoret et al. | 2005
- 1
-
Giprokoks experience in terms of creating the integrated process control system at coke oven batteries of JSC 'Severstal'Zingermann, Y. / Lavrov, K. / Gorenbukh, M. / Gabov, A. / Yershov, N. / Nikitin, N. et al. | 2005
-
Changes in quality of dense silica bricks after 20 years of operational exposure in a heating wall of coke oven batteryVasica, L. / Jernkontoret et al. | 2005
-
Use of selective granulation technology to enhance the performance of marra mamba type ore in the sintering processHaga, T. / Nakano, M. / Kasama, S. / Bergstrand, R. / Waters, A. / Jernkontoret et al. | 2005
-
Mineralogical investigations of sinter iron ores and sinterZirngast, J. / Zahn, M. / Mali, H. / Jernkontoret et al. | 2005
-
Blast furnace control technique at operation with high alkali inputHabermann, A. / Schuster, E. / Schuster, G. / Jernkontoret et al. | 2005
-
LKAB's experimental blast furnace - The learning curveHooey, L. / Oy, R. / Skold, B.-E. / Okvist, L. S. / Seppanen, M. / Zuo, G. / Jernkontoret et al. | 2005
- 1
-
Blast furnace pulverized coal injection rate control development linked to production rhythmAlves de Carvalho, Marcelo / Motta, Ricardo Sebastiao Nadur et al. | 2005
-
Coal optimisation in the voestalpine coking plantGahleitner, A. / Winter, A. / Pilz, K. / Springer, H. / Friedl, M. / Jernkontoret et al. | 2005
-
Optimized tap hole operation at BF 4 in DillingenVondruska, H. / Hartig, W. / Grisse, H. J. / Kreutz, O. / Boveding, C. / Jernkontoret et al. | 2005
-
Automation system of casthouse at Gwangyang BFSChoi, J.-S. / Kim, I.-H. / Cho, B.-R. / Choi, J.-Y. / Jernkontoret et al. | 2005
-
Improvement in blast furnace operating results by re-profiling the furnace stack by robotic shotcretingRorick, F. C. / Battle, D. E. / Hague, E. D. / Ricketts, J. A. / O Donnell, E. M. / Jernkontoret et al. | 2005
-
First operation experiences with the coke oven machines on the most modern coking plant of the world Schwelgern under the aspect environment protection, automation and technical improvementsTapken, R. / Hartl, J. / Jernkontoret et al. | 2005
-
Operation Experiences gained with ``PROven'' (Pressure Regulated Oven system) in the new ``Schwelgern'' coke oven plantSpitz, J. / Kochanski, U. / Leuchtmann, K.-P. / Krebber, F. / Jernkontoret et al. | 2005
- 1
-
Optimization of coke consumption in blast furnace process by use of second law of thermodynamicsCayir, Emrullah / Erol, M.Sevket et al. | 2005
-
Assessment of the blast furnace lower zone permeability based on casting parametersDesai, B. / Ramna, R. V. / Dey, A. / Jernkontoret et al. | 2005
-
Blast furnace best burden quality A first assessment based on simulation testsChaigneau, R. / Husslage, W. / Hughes, F. / Jernkontoret et al. | 2005
-
Construction of the coke production complex on the basis of combination of blend stamping and dry coolingGural, V. / Chub, V. / Rudyka, V. / Malyna, V. / Kovalov, E. / Jernkontoret et al. | 2005
-
Development of innovative cokemaking process (SCOPE21)Sugiyama, I. / Kato, K. / Fujikawa, H. / Nishioka, K. / Oshima, H. / Jernkontoret et al. | 2005
-
The ZAP model : a new method for the on-line determination of the blast furnace cohesive zoneLesoin, G. / Libralesso, J.-M. / Sert, D. / Jernkontoret et al. | 2005
-
Blast-furnace.net - a public web-based tool to be used in education and joint solving of problems for students, researchers and blast furnace craftsmenGyllenram, R. / Sundelin, B. / Andersson, M. / Jernkontoret et al. | 2005
-
Optimization of the design and operating parameters of shaft furnaces for DRI/HBI productionGordon, Y. / Shvidkiy, V. / Yaroshenko, Y. / Jernkontoret et al. | 2005
-
Recovery from high silicon operation at the Port Kembla blast furnacesNightingale, R. J. / Di Giorgio, N. / Mathieson, J. G. / Chew, S. J. / Wright, B. D. / Jernkontoret et al. | 2005
-
YSX process integrated environment protection at ThyssenKrupp Stahl AGStill, G. / Schulz-Klemp, V. / Jernkontoret et al. | 2005
-
Hearth wearing in Siderar blast furnace No. 2Lingiardi, O. / Eduardo, V. / Zubimendi, J. / Ametrano, R. / Giandomenico, F. / Gonzalez, N. / Jernkontoret et al. | 2005
- 1
-
Development of blast furnace operation at SSAB Oxelösund AB influenced by the changes in the coke marketSundelin, Bo / Antila, Olavi / Konradsson, Kerstin et al. | 2005
-
The availability of H~2 and CO in the lower part of the blast furnace by gas and oil injectionSlaby, S. / Andahazy, D. / Winter, F. / Feilmayr, C. / Burgler, T. / Jernkontoret et al. | 2005
-
Hearth management at Sidmar for an optimal hot metal and slag evacuationSergeant, R. / Bonte, L. / Huysse, K. / Jernkontoret et al. | 2005
-
Revolutionary new low cost pellet fines removal systemHendrickson, D. W. / Jernkontoret et al. | 2005
-
New technical possibilities for reduction of coke oven emissionsHein, M. / Huhn, F. / Rossa, F. / Opdenwinkel, H. / Strunk, J. / Jernkontoret et al. | 2005
-
Rebuild of blast furnace A at voestalpine Stahl Linz GmbHFerstl, A. / Brunnbauer, G. / Kastner, R. W. / Stastny, W. / Mayrhofer, H. / Schollhammer, H. / Nogratnig, H. / Jernkontoret et al. | 2005
-
The third campaign of the Whyalla No.2 blast furnaceTsalapatis, J. / Keil, R. / Jernkontoret et al. | 2005
-
New technology minimises NOx and SOx emissions at European coke making operationGraville, S. / Norman, J. / Winship, A. / Street, R. / Jernkontoret et al. | 2005
-
The present day and perspective development of ironmaking industry in UkraineShatokha, V. / Pliskanovs kky, S. / Kharakhulakh, V. / Jernkontoret et al. | 2005
-
Operational evolution of CSN's blast furnace 3 in the 3rd campaignFranklin, F. / da Silva, J. M.R. / Zanetti, C. H. / Noblat, S. J. / Carvalho, M. A. / Machado, F. L. / de Aguiar, F. N. / de Medeiros, F. T.P. / Reis, M. A.d. / Jernkontoret et al. | 2005
-
Coke properties and behaviours in blast furnacePufpaff, J. / Buhles, T. / Janz, J. / Jernkontoret et al. | 2005
-
Recent developments in North American ironmakingRorick, F. C. / Poveromo, J. J. / Jernkontoret et al. | 2005
-
Practices and design for extending the hearth life in the Mittal Steel Company blast furnacesSpaleck, K. / Schoeman, M. / Seegers, W. / Bobek, J. / Carter, W. / Chaubal, P. / Jernkontoret et al. | 2005
-
Data mining applied to identifying factors affecting blast furnace stave heat loadsZulli, P. / Stirling, D. / Jernkontoret et al. | 2005
-
TN treatment in BPPSeung-jae, L. / Jernkontoret et al. | 2005
-
Hot metal flow in the hearth of a blast furnace: Influence of dynamic changes in dead man porosity due to coke dissolution and coke size changesPost, J. R. / Tognarelli, D. / van der Stel, J. / Yang, Y. / Reuter, M. / Jernkontoret et al. | 2005
-
Compacting of coal for heat recovery ovensWright, R. / Kim, R. / Schucker, F.-J. / Jernkontoret et al. | 2005
-
Introduction of a new kind of door-plug-system at the coke plant Schwelgern and experiences after two years operationDogan, G. / Hombach, K. / Spitz, J. / Baaske, A. / Jernkontoret et al. | 2005
-
New technology for injection of products of coal gasification into the blast furnaceTovarovskiy, I. / Gordon, Y. / Jernkontoret et al. | 2005
-
Coke in the blast furnace - high temperature gasification behaviour in three dimensionsAndriopoulos, N. / Loo, C. E. / Jones, A. / Jernkontoret et al. | 2005
-
Development of waste plastics recycling process using coke ovensKato, K. / Nomura, S. / Fukuda, K. / Uematsu, H. / Jernkontoret et al. | 2005
-
Design and engineering features of the first Tecnored industrial plantNoldin, J. / Costa, P. / Contrucci, M. / Cox, I. / Cellissen, T. / Meijer, K. / Corus, D. / Jernkontoret et al. | 2005
- 1
-
Technical degradation index (TDI) - the tool for coke oven life prolongationSobolewski, Aleksandr / Kosyrczyk, Ludwik et al. | 2005
-
Evaluation of coke oven refractory damage with the Videofil® machineNivoix, F. / Gaillet, J.-P. / Jernkontoret et al. | 2005
-
Mechanism of coal grain swelling within plasticity rangeKarcz, A. / Strugala, A. / Mertas, B. / Sciazko, M. / Jernkontoret et al. | 2005
-
Control of oven wall pressure by blendingMahoney, M. / Keating, J. / Woodhouse, S. / McGuire, S. / Lingard, G. / Jenkins, D. / Jernkontoret et al. | 2005
-
Performance of energy saving and environmental control in sinter plant of China SteelLee, G.-C. / Liou, C.-H. / Jernkontoret et al. | 2005
- 1
-
Investigation of the alkali uptake and slags formation reactions in the LKAB experimental blast furnaceLindblom, Bo / Rutqvist, Elin / Pettersson, Mikael et al. | 2005
-
Characterisation of raceway and deadman of BF No. 3 in LuleaJansson, B. / Lundgren, M. / Okvist, L. S. / Jernkontoret et al. | 2005
- 1
-
Effective calorific value of gas used to heat coke oven batteries in modern integrated steel worksZymla, Victor / Radko, Tomasz / Honnart, Frederic et al. | 2005
-
Injection of pulverized coal at ThyssenKrupp StahlLangner, K. / Jernkontoret et al. | 2005
-
Quantification of liquid metal flow in Blast Furnace hearthDesai, B. S. / Ajmani, S. K. / Ramna, R. V. / Narsimha, M. / Jernkontoret et al. | 2005
-
Expert system controlled blast furnace operation - The next stepBettinger, D. / Schurz, B. / Stohl, K. / Ritamaki, O. / Piirainen, I. / Jernkontoret et al. | 2005
-
Tangible benefits from recycling of solid waste through sinterYadav, U. S. / Ranjan, A. / Das, B. / Ghosh, S. / Jernkontoret et al. | 2005
-
Reline of blast furnace No. 6 at Corus Ijmuiden, the Netherlandsvan Ikelen, J. / Molenaar, R. / Ijmuiden, C. / van Stein Callenfels, E. / Corus, D. / Jernkontoret et al. | 2005
-
Development of coating granulation sintering process for improving productivity and reducibilityOyama, N. / Sato, H. / Takeda, K. / Ariyama, T. / Jernkontoret et al. | 2005
-
Coke making under challenging conditionsStirling, C. / Brant, S. / Poole, J. / Mookhoek, M. / Dolfing, J. / Jernkontoret et al. | 2005
-
Development of a mobile chamber wall temperature measurement deviceBahe, J. / Karst, J.-L. / Hergalant, Y. / Gaillet, J.-P. / Jernkontoret et al. | 2005
-
High oil injection rate and high productivity at Raahe blast furnaces of Ruukki ProductionVetoniemi, M. / Hurme, R. / Oyj, R. / Jernkontoret et al. | 2005
-
Coke plant machines automation in Seremange and DunkerqueSibille, N. / Andre, J. / Jernkontoret et al. | 2005
-
Effective calorific value of gas used to heat coke oven batteries in modern integrated steel workZymla, V. / Radko, T. / Honnart, F. / Jernkontoret et al. | 2005
-
New developments in the field of fine ore based iron and steelmaking: Circored®, Circofer®, Hlsmelt®Nuber, D. / Orth, A. / Eichberger, H. / Jernkontoret et al. | 2005
-
Air quality standards in Europe and their potential impact on cokemaking operations Paper not receivedFisher, R. / Francis, D. / Hein, M. / Kat, W. / Stiskala, V. / Jernkontoret et al. | 2005
-
Reduction of pulverized coal injection system stopsFranklin, F. / Reinaldo, J. M. / Zanetti, C. H. / Motta, R. S.N. / de Lucena Silva, A. J. / Jernkontoret et al. | 2005
-
Technology Progress of Blast Furnace Ironmaking in China Paper not receivedWei, G. / Jernkontoret et al. | 2005
-
Optimization of coke consumption in blast furnace process by use of second saw of thermodynamicsCayir, E. / Erol, M. S. / Jernkontoret et al. | 2005
-
Blast furnace hearth models, reline and cooling philosophies - Joint EBFC PaperBonte, L. / Southern, S. / Zaimi, S. A. / Kuhl, T. / Giandomenico, F. / Manilla, P. / Inkala, P. / Lesoin, G. / Eisen, P. / Stisovic, T. et al. | 2005
-
Technical Degradation Index (TDI) - tool for coke oven life prolongationSobolewski, A. / Kosyrczyk, L. / Jernkontoret et al. | 2005
-
Giprokoks experience in terms of creating the integrated process control system at coke oven batteries of JSC <>Zingerman, Y. / Lavrov, K. / Gorenbukh, M. / Gabov, A. / Ershov, N. / Nikitin, N. / Jernkontoret et al. | 2005
-
Development of blast furnace operation at SSAB Oxelosund AB influenced by the changes in the coke marketSundelin, B. / Antila, O. / Konradsson, K. / Jernkontoret et al. | 2005
-
In-plant recycling of dust and sludge from blast furnaces and steel-making convertersvon Scheele, J. / Marklund, S. / Jernkontoret et al. | 2005
-
Blast furnaces pulverized coal injection rate control development linked to production rhythmde Carvalho, M. A. / Motta, R. S.N. / Jernkontoret et al. | 2005
-
The new OxyCup shaft furnace plant of ThyssenKrupp Stahl: Start-up and first resultsPeters, M. / Schmole, P. / Kesseler, K. / Jernkontoret et al. | 2005
-
Back to the future - Ideas for new blast furnace conceptsKorthas, B. / Peters, M. / Schmoele, P. / Jernkontoret et al. | 2005
-
High productivity operation at Pohang No. 4 blast furnaceLee, S.-H. / Lee, J.-B. / Nam, S.-J. / Jernkontoret et al. | 2005
-
Coke production and demand today and tomorrow - Face up to the reality?Cleary, P. / Isler, D. / Lungen, H. B. / Rudack, W. / Reinke, M. / Jernkontoret et al. | 2005
-
Investigation of the alkali uptake and slag formation reactions in the LKAB Experimental Blast FurnaceLindblom, B. / Rutqvist, E. / Pettersson, M. / Jernkontoret et al. | 2005