Worst-Case Performance of Two Critical Path Type Algorithms (English)
- New search for: Singh, G.
- New search for: Zinder, Y.
- New search for: Singh, G.
- New search for: Zinder, Y.
In:
ASIA PACIFIC JOURNAL OF OPERATIONAL RESEARCH
;
17
;
101-122
;
2000
-
ISSN:
- Article (Journal) / Print
-
Title:Worst-Case Performance of Two Critical Path Type Algorithms
-
Contributors:Singh, G. ( author ) / Zinder, Y. ( author )
-
Published in:ASIA PACIFIC JOURNAL OF OPERATIONAL RESEARCH ; 17 ; 101-122
-
Publisher:
- New search for: NATIONAL UNIVERSITY OF SINGAPORE
-
Publication date:2000-01-01
-
Size:22 pages
-
ISSN:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:English
- New search for: 330 / 510
- Further information on Dewey Decimal Classification
-
Classification:
-
Source:
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Table of contents – Volume 17
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1
-
Algorithms for Solving Lagrangian Multistage Decision ProblemsIrvine, S.S et al. | 2000
- 17
-
Periodic Preventive Maintenance Policies Following the Expiration of WarrantyJung, G.M. et al. | 2000
- 27
-
An Efficient Algorithm for Multiobjective Transportation ProblemsKasana, H.S. et al. | 2000
- 41
-
Inventory of Damagable Items with Variable Replenishment and Stock-dependent DemandMandal, M. et al. | 2000
- 55
-
Superlinear Convergence of Factorized Structured Quasi-Newton Methods for Nonlinear OptimizationOgasawara, H. et al. | 2000
- 81
-
LPABO : a Program for Interior Point Methods for Linear ProgrammingPark, S. et al. | 2000
- 101
-
Worst-Case Performance of Two Critical Path Type AlgorithmsSingh, G. et al. | 2000
- 123
-
Overload Analysis of the PH/PH/1/K Queue and the Queue of the M/G/1/K Type with Very Large KAlfa, A. S. et al. | 2000
- 137
-
Dual-Based Optimization of Cyclic Three-Day Workweek SchedulingAlfares, H. K. et al. | 2000
- 149
-
Duality Theorems in Parametric Associative Optimal Path ProblemsMaruyama, Y. et al. | 2000
- 169
-
An Algorithm for Buffer Allocation with Linear Resource Constraints in a Continuous-Flow Unreliable Production LineSeong, D. et al. | 2000
- 181
-
Multiple Objective Cost-Bottleneck Time Transportation Problem with Additional Impurity ConstraintsSingh, P. et al. | 2000
- 199
-
A Classification of Bicriterion. Shortest Path (BSP) AlgorithmsSkriver, A. J. V. et al. | 2000
- 213
-
A Primal-Dual Interior Point Algorithm for Solving Bilevel Programming ProblemWeng, W. T. et al. | 2000