Successful Practices of Environmental LG Vegetable Gum in Horizontal Directional Drilling (English)
- New search for: Cai, Jihua
- New search for: Wu, Xiaoming
- New search for: Gu, Sui
- New search for: Cai, Jihua
- New search for: Wu, Xiaoming
- New search for: Gu, Sui
In:
ICPTT 2011
: Sustainable Solutions For Water, Sewer, Gas, And Oil Pipelines
;
2088-2098
;
2011
-
ISBN:
- Conference paper / Electronic Resource
-
Title:Successful Practices of Environmental LG Vegetable Gum in Horizontal Directional Drilling
-
Contributors:
-
Conference:International Conference on Pipelines and Trenchless Technology 2011 ; 2011 ; Beijing, China
-
Published in:ICPTT 2011 : Sustainable Solutions For Water, Sewer, Gas, And Oil Pipelines ; 2088-2098
-
Publisher:
- New search for: American Society of Civil Engineers
-
Place of publication:Reston, VA
-
Publication date:2011-10-07
-
ISBN:
-
DOI:
-
Type of media:Conference paper
-
Type of material:Electronic Resource
-
Language:English
-
Keywords:
-
Source:
Table of contents conference proceedings
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1
-
Sewer System Performance Analysis Based on Monitoring and Modeling Technology in Plain Areas of the South of ChinaDong, Luyan / Zhao, Dongquan / Tang, Langui / Xing, Wei / Mao, Nan et al. | 2011
- 10
-
Treatment on Big Fold Angle of Towing Pipes on the Directly Buried Heating PipeWang, Fei / Wang, Guowei / Du, Baocun et al. | 2011
- 18
-
Study of Fault Propagation Model of the Hydraulic Conditions for City Gas Distribution Pipeline NetworkLiang, Guangchuan / Zhu, Xuexi et al. | 2011
- 26
-
A Directly Disjoint Algorithm for Pipeline Network s-t Reliability EvaluationHou, Benwei / Wang, Wei / Peng, Lingyun et al. | 2011
- 38
-
Energy Consumption Analysis and Assessment for Northeastern Crude Oil Pipeline Network in ChinaLiu, Jianjun / Miao, Qing / Hu, Sen / Zhi, Shujie / Jiang, Baoliang et al. | 2011
- 47
-
Analysis of Lifecycle Model for Water Distribution SystemsHe, Zhonghua / Yuan, Yixing / Zhao, Hongbin et al. | 2011
- 54
-
Security Analysis for Buried Pipeline under Unsupported StateLin, Pengzhen / You, Xin et al. | 2011
- 63
-
A Study on New Edition Assessment Criteria for the Remaining Strength of Corroded PipelineMa, Bin / Shuai, Jian / Xu, Xuerui et al. | 2011
- 73
-
Study on the Anticorrosion Technology of Buried Oil PipelinesLiu, Chunyu / Li, Na / Jing, Jiaqiang / Lu, Ping / Zhang, Xiaoyan et al. | 2011
- 81
-
Fit for Purpose Analysis on Bimetallic Lined Pipe in Yaha Gas Condensate FieldLi, Fagen / Wei, Bin / Bai, Zhenquan / Shao, Xiaodong / Cai, Rui et al. | 2011
- 90
-
Prediction of Gathering Pipeline Internal Corrosion Rate Based on Improved Wavelet Neural Network ModelZheng, Yunping / Shu, Jie / Ren, Chengqiang / Zhang, Feng et al. | 2011
- 100
-
Corrosion Investigation on Tubular Goods for Pipeline Monitoring and DesignRen, Chengqiang / Zheng, Yunping / Cao, Ranwei / Liu, Li et al. | 2011
- 109
-
The Influence of Pipelines on the Water Quality of Distribution SystemsZhao, Zhiling / Duan, Chunyi / Lin, Ying / Liu, Shupo et al. | 2011
- 117
-
Factor Analysis about Soil Corrosion of Buried Metal PipeZhou, Lizhen / Liu, Yourong / Zhang, Tao et al. | 2011
- 123
-
Effectiveness of Cathodic Protection under AC Interference and Determination of the Optimum Protection PotentialYang, Yan / Li, Zili / Ding, Qingmiao et al. | 2011
- 132
-
Bearing Capacity Finite Element Model and Solution of High-Pressure Gas Nonmetal Glass Steel PipelineZhang, Huaixin / Liu, Ying / Liao, Kexi et al. | 2011
- 139
-
Safe Evaluation of AC Interference on an Oil Products PipelineChen, Xinhua / Chen, Hongyuan / Liu, Lingli / Xue, Zhiyuan / Wang, Weibin / He, Fei et al. | 2011
- 149
-
Research on Soil SCC Sensitivity of Shan-jing PipelineWang, Lianwei / Dong, Shaohua / Yu, Guizhang et al. | 2011
- 160
-
Analysis of Casing Failure Associated with Bedded Salt Cavern Gas StorageWang, Tongtao / Yan, Xiangzhen / Peng, Hanxiu / Luan, Zhiyong et al. | 2011
- 169
-
Load Distribution Analysis of Premium Threaded Casing ConnectionXu, Zhiqian / Yan, Xiangzhen / Yang, Xiujuan / Li, Gensheng et al. | 2011
- 179
-
Applicable Material Selection for Oil Country Tubular Goods (OCTG) in Sour Conditions and Software DevelopmentShao, Bing / Yan, Xiangzhen / Yang, Xiujuan / Wang, Tongtao / Li, Gensheng et al. | 2011
- 188
-
Numerical Simulation Research on the Reliability of Oil/Gas Pipelines Based on Semi-Analytical MethodFeng, Yaorong / Wang, Tongtao / Yan, Xiangzhen / Yang, Xiujuan et al. | 2011
- 200
-
Study on Residual Collapse Pressure of Casing in Bend Part of Medium/Short Radius Horizontal WellsTian, Zhonglan / Yan, Xiangzhen / Luan, Zhiyong / Peng, Hanxiu / Li, Gensheng et al. | 2011
- 208
-
Reliability Analysis of Completion Casing in Salt Cavern Gas StorageYang, Henglin / Wang, Tongtao / Yan, Xiangzhen / Yang, Xiujuan / Li, Gensheng et al. | 2011
- 218
-
Adaptation and Optimization of Oil Pipeline Nets in Chengdao OilfieldLiu, Jinkun / Zhang, Lisong / Yan, Xiangzhen / Xu, Chuanjing et al. | 2011
- 229
-
Study on the Safety Technology of the Submarine Pipeline Impending Segment in Chengdao OilfieldZhang, Yantao / Yan, Xiangzhen / Yu, Benfu et al. | 2011
- 237
-
Research on Directional Drilling Crossing Technology for Complex and Ultra-Long StratumZhao, Haipei / Xu, Zhiqian / Yan, Xiangzhen / Yang, Shangyu et al. | 2011
- 243
-
Frictional Force Analysis on Drilling String in Horizontal Branch SectionYan, Tie / Yuan, Peng / Sun, Xiaofeng / Ma, Hongbin et al. | 2011
- 250
-
Study on Plastic Limit Load of X80 Steel Pipe Elbow with Non-Uniform Wall ThicknessJiang, Tingting / Yang, Xiujuan / Yan, Xiangzhen / Zhang, Lisong et al. | 2011
- 259
-
Study on the Impacts of Cuttings on Well Deviation in Gas DrillingFeng, Shuishan / Yan, Tie / Sun, Xiaofeng / Sun, Shihui et al. | 2011
- 267
-
Application and Qualification of Reinforced Thermoplastic Pipes in Chinese OilfieldsQi, Dongtao / Ding, Nan / Cai, Xuehua / Li, Houbu / Shuhui, Zhang / Yan, Milin et al. | 2011
- 276
-
Study on the Deformation of Completion Casing for Salt Cavern Gas StorageWang, Jianjun / Yan, Xiangzhen / Lu, Caihong / Zhao, Haifeng / Luan, Zhiyong / Peng, Hanxiu et al. | 2011
- 284
-
Scheme Design of the Digital Management System of Oil and Gas PipelinesCen, Kang / Zhou, Daijun / Zhao, Xuefen et al. | 2011
- 295
-
Framework Design and Implementation of Real-Time Monitoring and Dynamic Analyzing System of Urban Gas NetworkLiu, Wu / Feng, Xiaohong / Xu, Yuan / Gu, Xueqin et al. | 2011
- 304
-
Emergency Rescue Decision Assistant System Based on GIS for Natural Gas PipelineLiu, Fujun / Wang, Xianggang / Qian, Yueqiang / Kong, Shuai / Zheng, Mulin et al. | 2011
- 315
-
Study on Breaks Analysis System for the Heating Pipeline Network Based on ComGISWang, Songling / Zhang, Heming / Wu, Zhengren et al. | 2011
- 323
-
Application of 3S Technologies in the Pipeline IndustryHan, Xiaoming et al. | 2011
- 330
-
The Application of GIS in the City Gas Network and Leakage Case Study Based on GISWu, Xiaonan / Huang, Kun / Shang, Bojun / Huang, Rui / Hu, Meilin et al. | 2011
- 339
-
Design and Application of a Sewerage Pipeline Network Maintenance Information Platform Based on GISZhang, Zhonggui / Wu, Xincai et al. | 2011
- 347
-
Research on Risk Management and Emergency Response of Oil Pipeline Based on WebGISWang, Weiqiang / Jiang, Han / Wu, Ming / Wang, Fuwei / Wu, Yuguo et al. | 2011
- 356
-
The Application of SCADA System in an Old Crude Trunk LineZhang, Fan / Shang, Mengping et al. | 2011
- 362
-
Design of Water Supply Network Management System Based on OCXsXiangwei, Kong / Qiji, Yuan / Yijie, Qiu / Ji, Li / Yongjie, Guo / Jiming, Yuan et al. | 2011
- 372
-
Research and Development of Natural Gas Pipeline Emergency Management System Based on GISWang, Lianwei / Dong, Shaohua / Zhou, Yongtao et al. | 2011
- 381
-
Research on the Application of UAV Remote Sensing in Geologic Hazards Investigation for Oil and Gas PipelinesGao, Jiaojiao / Yan, Yusen / Wang, Chengbiao et al. | 2011
- 391
-
Treatment Measures on Scale Forming in Oilfield PipelineYu, Lanlan / Wang, Baohui / Ji, Wenbo et al. | 2011
- 401
-
Research on the Real-Time Calculation of Gas Leakage and Diffusion and Hazards Prediction of Fire and Explosion for Nature Gas PipelineGuo, Xiaolian / Ling, Zhangwei / Liu, Fujun / Kong, Shuai / Qian, Yueqiang / Zheng, Mulin / Qian, Jiren / Li, Zili et al. | 2011
- 412
-
Hydraulic State Estimation of Post-Earthquake Water Distribution SystemsXu, Ying / Wu, Yuebin / Lv, Dagang et al. | 2011
- 421
-
Determination of Limit Load to Buried Gas Pipeline with Inner Crack under Rockfall Impact Load Based on VCCTYao, Anlin / Xu, Taolong / Li, Youlv / Zeng, Xiangguo et al. | 2011
- 431
-
D-S Evidence Theory in the Mountainous Gas Pipeline Evaluation of ApplicationHuang, Kun / Hu, Meilin / Wu, Xiaonan / Chen, Liqiong / Huang, Rui / Liu, Su et al. | 2011
- 440
-
Pipelines Deformation Control for Double-Row Supported ExcavationFang, Kai / Zhang, Zhongmiao / He, Jingyu / Liu, Xingwang et al. | 2011
- 448
-
Numerical Calculation of Buried Pipeline Impacted by Rockfalls and Landslide DepositsZhou, ZhaoMing / Wan, Fu / Li, Weiqin / Lin, Tiejun / Shi, Taihe et al. | 2011
- 458
-
New Evaluation for Seismic Settlement in Soft Clay Based on Analytic Hierarchy Process and ClusteringGe, Yunfeng / Tang, Huiming / Huang, Lei et al. | 2011
- 469
-
Risk Analysis of Oil Pipeline under Collapse and Rockfall at Different Heights of Rock SlopeDeng, Qinglu / Shi, Xiaowen / Zhu, Dapeng et al. | 2011
- 477
-
Numerical Simulation of Pigging Operation in Gas-Liquid Two-Phase Flow PipelinesXu, Jingyuan / Li, Changjun / Liu, Bin / Liu, Jiaxi et al. | 2011
- 492
-
Water Hammer Analysis of District Heating NetworksWu, Yuebin / Xu, Ying / Wei, Wang et al. | 2011
- 502
-
Simulation Analysis of Drag-Reduction Characteristics of Heavy Oil Flow by Aqueous-Base FoamZhu, Hongjun / Jing, Jiaqiang / Chen, Junwen et al. | 2011
- 512
-
Influence of Energy Equation on Gas Pipeline Transient SimulationLi, Jun / Qin, Chaokui / Guo, Chao et al. | 2011
- 523
-
Experimental Study on Water Cut Oil Flowing in Nanometer Coated PipelineLiu, Baojun / Zong, Zhichen / Wang, Peng / Du, Hong et al. | 2011
- 532
-
Simulating the Working Conditions of Pipeline System with Control ValvesZhang, Shifu / Zhang, Jiaen / Liu, Lianghua / Zhang, Qixin et al. | 2011
- 542
-
Prediction of Particle Erosion in Bend Based on Liquid-Solid Coupling SimulationZhang, Manlai / Liao, Ruiquan / Feng, Jin et al. | 2011
- 552
-
Study of Mixing at Cross Junction in Water Distribution Systems Based on Computational Fluid DynamicsLiu, Haixing / Yuan, Yixing / Zhao, Ming / Zheng, Xiaoming / Lu, Jing / Zhao, Hongbin et al. | 2011
- 562
-
Study of Numerical Simulation of Hydraulic Characteristics of Bifurcated Pressure PipelineRong, Guiwen / Liu, Yuling / Wei, Wenli et al. | 2011
- 569
-
Oil and Gas Pipeline Quantitative Risk Assessment System Development with Intermediate Database TechnologyZhang, Huaixin / Ren, Chiyuan / Liao, Kexi et al. | 2011
- 578
-
Submarine Pipeline HSE Management System and ApplicationWu, Guiguang / Liao, Kexi et al. | 2011
- 586
-
Research and Design of Horizontal Directional Drilling Attitude Measurement System Based on ARMGuo, Hong / Yao, AiGuo et al. | 2011
- 604
-
Integrated Project Delivery Method for Trenchless ProjectsGokhale, Sanjiv et al. | 2011
- 615
-
A New Form of Asset Management for Sewer NetworksBroere, W. / van der Hoop, G. / Bosch, J. W. et al. | 2011
- 626
-
Experimental Study on Friction Characteristic of Glass Reinforced Plastic Mortar PipeWu, Ying / Sun, Mingqing / Li, Zhuoqiu et al. | 2011
- 636
-
Numerical Simulation of Ground Surface Temperature Field of Buried Oil Pipeline with Multi-Spot LeakageQi, Hanbing / Xing, Chang / Wu, Guozhong / Li, Dong et al. | 2011
- 645
-
Experimental Study on Detection and Location of Pipeline Leakage Based on Acoustic Emission TechniqueXiang, Xingzhi / Fang, Zhaoxiao / Lu, Cheng et al. | 2011
- 653
-
Fuzzy Assessment of Leakage Detection Technology for Crude Oil PipelineMeng, Qingping / Jia, Jinzhang et al. | 2011
- 659
-
The Application of Adaptive Wavelet Neural Network in Ship Pipeline Leakage DetectionYin, Honghao / Peng, Zhongbo / Chen, Hui et al. | 2011
- 668
-
Study on Leakage Detection and Location Technology for Oil Transportation Pipelines Based on Infrasonic WaveWu, Weiqiang / Zhao, Huijun / Wang, Xiaobing / Zhou, Ning / Wang, Shuli et al. | 2011
- 681
-
Quantitative Analysis of Circumferential Magnetic Flux Leakage (CMFL) Signal for Oil and Gas Pipeline Based on RBF Neural NetworkChen, Liqiong / Cheng, Lei / Li, Guiliang / Wang, Sizhong et al. | 2011
- 690
-
Gas Pipeline Leakage Detection and Location Based on Transient SimulationLi, Jun / Yu, Jianjun / Ren, Shengfeng et al. | 2011
- 703
-
Based on the Back-Calculation Methods for the Sources Intensity Theory of Pipeline Leak-Detecting TechnologyWu, Xiaonan / Shang, Bojun / Hu, Meilin / Huang, Kun et al. | 2011
- 711
-
The Application of Infrasonic Wave and Its Signal Processing in the Leakage Detection and Localization for PipelinesWu, Weiqiang / Zhao, Huijun / Wang, Xiaobing / Zhou, Ning / Wang, Shuli et al. | 2011
- 725
-
Experimental Study on Ionic Soil Stabilizer Keeping the Hole Diameter of Clay Stratum in HDDCui, D. S. / Xiang, W. / Chen, Q. et al. | 2011
- 733
-
Operation Optimization of Heated Oil Transportation PipelineLi, Changjun / Wang, Jun / Wu, Xia / Jia, Wenlong et al. | 2011
- 744
-
Identifying Minimum Safe Distance between Adjacent Parallel PipelinesJia, Shaohui / Feng, Qingshan et al. | 2011
- 751
-
Stability Analysis on Truss Overhead Crossing Structure of Oil and Gas Transmission PipelineLiu, Yanqiang / Shi, Rui et al. | 2011
- 756
-
Study on the Heavy Oil Pipeline Heating Transportation in Fengcheng OilfieldWu, Xiaonan / Wang, Kaixiong / Mi, Lijun / Xie, Ping / Kun, Kuang / Han, Chao et al. | 2011
- 772
-
Reliability Inverse Analysis Method of X80 Pipeline Parameter DesignZhang, Lisong / Yan, Xiangzhen / Yang, Xiujuan et al. | 2011
- 780
-
Applied Research of Improved Electromagnetic-Like Mechanism Algorithm in the Layout Optimization of Oilfield Water Injecting Pipeline NetworkQi, Hanbing / Wang, Qiushi / Wu, Guozhong / Li, Dong et al. | 2011
- 788
-
Analysis of Static Stress of Floating Steel PipelineZhang, Shifu / Wang, Yunlong / Li, Hong / Zhang, Qixin et al. | 2011
- 798
-
Stress Analysis in the Structural Design of a Pipeline at an Offshore Oil FieldWang, Guichun / Zhao, Zidong / Chen, Weili / Li, Wusheng et al. | 2011
- 810
-
A Knowledge-Based System for Evaluating the Impact of Soil Properties on the Performance of Utility Location Technologies: Design and Case StudyFoo, K. Y. / Hao, T. / Curioni, G. / Chapman, D. N. / Metje, N. / Atkins, P. R. et al. | 2011
- 826
-
Engineering-Economic Analysis of Pipeline Transportation of Waxy Crude Oil in ChinaXing, Xiaokai / Dou, Dan / Wu, Changchun et al. | 2011
- 838
-
Qualitative Analysis and Design of Siphon in Flexible PipelineLiu, Chengqing / Zhao, Shichun et al. | 2011
- 849
-
The Initial Selection of Pipe Jacking Machine in Hefei CityLiu, Yingping / Wang, Shang / Wang, Yuanrong / Li, Dianzhong / Yang, Xiankang et al. | 2011
- 858
-
One Technique for Shield Tail Brushes' Repair Using Liquid Nitrogen Freezing Method in the Artesian AquiferLin, Cungang / Wu, Shiming / Zhang, Zhongmiao et al. | 2011
- 868
-
Treatment Technique for Axis Deviation in a Curved Pipe Jacking Project Shallow BuriedLiu, Hui / Yang, Zhuanyun et al. | 2011
- 876
-
Displacement Analysis of the I Type Dent on Pipeline Based on FE CalculationWu, Ying / Zhang, Peng / Ma, Jun / Huang, Yongshuo et al. | 2011
- 886
-
Deficient-Network Simulation Considering Pressure-Dependent DemandLiu, Jun / Yu, Guoping / Savic, Dragan et al. | 2011
- 901
-
Study on the Model of Failure Probability by Third-Party Damage for Gas Pipelines in Sichuan-Chongqing RegionLiao, Kexi / Cao, Bin / Luo, Min / Yang, Hong / Wu, Xia et al. | 2011
- 912
-
Research on Fatigue Mechanism and Fatigue Life of Drill Pipes Used in Horizontal Directional DrillingCao, Ming et al. | 2011
- 918
-
Research on the Analysis Method of Coiled Tubing Fatigue LifeYafeng, Ji / Hong, Zhang / Qingquan, Duan / Yanbin, Cao et al. | 2011
- 927
-
Research on Urban Water Supply Pipeline Breakage Probability ModelZheng, Chengzhi / Gao, Jinliang / Tan, Haoqiang / He, Wenjie / Zhang, Jichang et al. | 2011
- 941
-
Calculation and Analysis for Critical Parameters of Long-Span Suspended Pipeline Stress Deformation AreaLiao, KeXi / Li, Yang / Yao, Quanke et al. | 2011
- 949
-
Failure Classification Study of X70 Pipeline Crossing Earthquake Fault Based on Shell-Contact ModelYan, Xiangzhen / Zhang, Lisong / Yang, Xiujuan et al. | 2011
- 958
-
Failure Analysis of Horizontal Directional Drilling Crossing Drill Pipe FractureLu, Caihong / Liu, Yonggang / Wang, Xinhu / Jun, Wan Gjian / Song, Shengyin et al. | 2011
- 965
-
Numerical Analysis and Simulation of Pipeline CollapseKang, Yong et al. | 2011
- 973
-
Application of Metal Magnetic Memory Method in Long-Distance Oil and Gas Pipeline Defects DetectionLin, Song / Wang, Weibin / Zhao, Choumin / Feng, Zhanjun / Bi, Wuxi / Jiang, Xianyao et al. | 2011
- 981
-
Application Progress of Tri-Axial MFL Sensors TechnologyWang, Fuxiang / Feng, Qingshan / Zhou, Lijian et al. | 2011
- 990
-
Experimental Study on Magnetic Detection of Oil Well TubingFan, Jianchun / Wang, Yumei / Ren, Xuhui et al. | 2011
- 996
-
Internal Free Swimming Pipeline Leakage Detection Technology—SmartballPo, Audrey / Xing, Yin et al. | 2011
- 1006
-
Applications of Lifting Wavelet Packet Transform Based on a Novel Threshold Method in MFL Signal ProcessingSun, Shiyu / Ji, Fengzhu / Wang, Changlong / Zhang, Haipeng et al. | 2011
- 1017
-
Development of a New Intelligent Pig Based on Intense Magnetic Memory TechniqueZhan, Xianjue / Fan, Jianchun / Wen, Dong / Zhang, Haifeng et al. | 2011
- 1023
-
Prevention of Long-Buried Oil Pipeline Oil Theft Detection TechnologyYang, Wei et al. | 2011
- 1030
-
Corrected the Internal Corrosion Data Obtained through MFL by Considering CO2 CorrosionGao, Jian / Qin, Lin / Wang, Yihui / Wang, Fei / Wang, Yang et al. | 2011
- 1039
-
Principle and Technical Characteristics of Non-Contact Magnetic Tomography Method Inspection for Oil and Gas PipelineLiao, KeXi / Yao, Quanke / Zhang, Chun et al. | 2011
- 1049
-
Standard and Application by Using Non-Contact Magnetic Tomography Method for Pipeline Technical Conditions DiagnosisLiao, KeXi / Zhang, Chun et al. | 2011
- 1059
-
Progress in Analytical Methods of Composition in Nickel-Base Alloy PipesShao, Xiaodong / Liu, Yangqin / Li, Fagen / Wu, Jian et al. | 2011
- 1073
-
Modeling the Magnetic Field Distribution for Pipe Corrosion Pit with ANSYS SoftwareBi, Wuxi / Wang, Weibin / Zhao, Choumin / Xue, Zhiyuan / Lin, Song / Gao, Shanbu et al. | 2011
- 1081
-
Development of an Adaptive Vehicle for In-Pipe Inspection TaskHong, Zhao / Yang, Wang et al. | 2011
- 1090
-
Simulation of Gas Pipeline Leak Detection Based on Acoustic Emission and Wavelet Packet AnalysisPan, Dong / Zhou, Ning / Liu, Xuanya / Zhao, Huijun et al. | 2011
- 1099
-
Study on Analytical Method for Carbon and Sulfur in High Nickel Corrosion Resistant Alloy TubingLiu, Yangqin / Shao, Xiaodong / Qu, Lulu et al. | 2011
- 1104
-
The Five Types of Pipeline TrenchesHoward, Amster et al. | 2011
- 1115
-
Construction Method of Crossing River Pipe without CofferdamFu, Yong / Wang, Wenliang et al. | 2011
- 1119
-
Jacking Construction Technology of the Trenchless and the Grid MethodLi, Jiawen et al. | 2011
- 1126
-
Deformation Modulus and Shear Strength Estimation of Rock Mass in Gas Pipeline Area from ZhongXian to Wuhan, ChinaMei, Qinqin / Wang, Liangqing / Liang, Ye et al. | 2011
- 1134
-
Large Diameter Steel Pipe Stress Analysis When Installed by Means of Horizontal Directional DrillingAlbert, René et al. | 2011
- 1147
-
High-Risk, 610 mm (24 in.) Diameter, 1, 645 m (5, 400 ft.) HDD Project—A Case StudyTanzi, David J. / Botteicher, Richard (Bo) / Pathirage, Kapila / Andreasen, Jr., G. Christian et al. | 2011
- 1164
-
The Safety of Hot Work in City Gas PipelineZhang, Peng / Ma, Hongyan et al. | 2011
- 1171
-
The Application of Long-Distance Curved Pipe Jacking in Power Pipe ConstructionChen, Yong / Chen, Yongguang / Huang, Yihua et al. | 2011
- 1181
-
Thermal Stress Calculation and Its Application to Bending Angle Design of Flowlines of Subsea Christmas TreeQin, Rui / Tian, Hongping / Li, Qingping / Duan, Menglan / Luo, Xiaolan / Kang, Yongtian et al. | 2011
- 1191
-
Experimental Study of the Effect of Flow Improver on the Reducing Resistance of Oil-Water Mixture PipelineHan, Xuesong / Cui, Haiqing / Che, Fuli et al. | 2011
- 1204
-
Study on Compensation of Bent Pipes in Subsea LNG Cryogenic PipelineLiu, Su / Huang, Kun / Zhang, Chaoyi / Li, Xinzhan et al. | 2011
- 1214
-
Study on the Best Crossing Angle between Pipeline and FaultGu, Xiaoting / Zhang, Hong et al. | 2011
- 1225
-
Buckling of Flowlines of Subsea Christmas Tree Based on Genetic AlgorithmQin, Rui / Gu, Yuhong / Li, Qingping / Luo, Xiaolan / Duan, Menglan / Kang, Yongtian et al. | 2011
- 1234
-
Project Demonstration about CO2 Transportation PipelineLiu, Enbin / Li, Changjun / Peng, Shanbi / Zhang, Shuanglei et al. | 2011
- 1244
-
Laboratory Test of Statically-Loaded Large Diameter Steel Pipe with Native BackfillSharma, Jwala Raj / Najafi, Mohammad / Zheng, Zhen / Jain, Abhay et al. | 2011
- 1257
-
Water Pipeline Renewal Evaluation Using AWWA Class IV CIPP, Pipe Bursting, and Open-CutHashemi, Behnam / Iseley, Tom / Raulston, Jim et al. | 2011
- 1267
-
Research on Partly Freezing Sealing Technology for Large Diameter Natural Gas PipelineLiang, Zheng / Lan, Hongqiang et al. | 2011
- 1274
-
Analysis of Water Supply Capacity under the Condition of Trenchless Rehabilitation TechnologyGeng, Xin / Gao, Jinliang / Wu, Wenyan / Yuan, Yixing et al. | 2011
- 1285
-
Application Progress of Oil and Gas Pipeline Rehabilitation TechnologyKou, Jie / Yang, Wen et al. | 2011
- 1293
-
Study of Curing Reaction Kinetics and Dynamic Mechanical Property on nm-SiO2/Epoxy Used As the Matrix of Fiber Reinforced Composite Applied to the Repair and Local Reinforcement of Oil and Gas PipelinesZhang, Shuhui / Yan, Milin / Cui, Hong / Zhang, Wei et al. | 2011
- 1305
-
Effect of nm-SiO2 on the Matrix and Aramid Fiber/Epoxy Composite Applied to the Repair and Reinforcement of Oil and Gas PipelinesZhang, Shuhui / Yan, Milin / Cui, Hong / Zhang, Wei et al. | 2011
- 1316
-
Comparative Study on Water-Hammer Method and Barometric-Pulse Method for Water Supply Pipeline CleaningZhao, Ming / Han, Xiaoxi / Bao, Yuequan / Wu, Guoquan / Liu, Congsheng et al. | 2011
- 1324
-
Gaps of Decision Support Models for Pipeline Renewal and Recommendations for ImprovementMatthews, John / Selvakumar, Ariamalar / Condit, Wendy / Sterling, Ray et al. | 2011
- 1335
-
Development of an Automated Air Pressure Inversion System Using Vertical Roller Brackets (ABL System) for Steam Cured CIPP InstallationKoo, Dae-Hyun (Dan) / Song, Ho-Myeon / Cho, Jeong-Il / Jang, Chun-Ki et al. | 2011
- 1344
-
Modern Relining—Materials, Properties, and Curing MethodsAlexander, Jürgen / Lorenz, Reinhard et al. | 2011
- 1358
-
Numerical Analysis of the Influence of Foundation Pit Excavation on Many Underground Pipelines NearbyLiu, Hongyan / Lv, Shuran / Jia, Jialing et al. | 2011
- 1365
-
Evaluation of Geological Hazard Susceptibility Based on AHP and Fuzzy Comprehensive Evaluation in Zhongwu PipelineLiu, Liang / Jia, Shaohui / Zhou, Lijian / Feng, Qingshan / Li, Yi / Yu, Haichong et al. | 2011
- 1376
-
A Numerical Study on the Effect of Tunneling on Adjacent Buried PipelinesXu, Ming / Shi, Lifeng et al. | 2011
- 1388
-
Analysis of Vertical Displacement of Underground Pipeline Nearby Caused by Foundation Pit Excavation Based on Field TestLiu, Hongyan / Li, Houen / Huang, Yushi / Lv, Shuran et al. | 2011
- 1394
-
A Risk Management System of City Lifelines Based on ArcGISBai, Yongqiang / Lv, Lianghai / Tang, Renfeng / Bai, Guang / Zhang, Xiaofeng / Wang, Tong et al. | 2011
- 1401
-
Study on the Security Conditions of Parallel Laying Gas Transmission Pipelines under Blast LoadingXu, Taolong / Yao, Anlin / Zeng, Xiangguo / Li, Youlv et al. | 2011
- 1412
-
Influence Study of Site Conditions on Buried Pipeline's Seismic PerformanceWang, Lili / Wu, Xiaodan / Zhang, Xiaoqing et al. | 2011
- 1419
-
Optimization of Monitoring Point Placement of Water Quality in the Water Distribution System Based on TEVA-SPOTLiu, Haixing / Yuan, Yixing / Zhao, Ming / Lu, Jing / Zheng, Xiaoming / Zhao, Hongbin et al. | 2011
- 1429
-
3D FEM Simulation and Analysis of Compacting Effects on Underground Pipeline by Construction of Single Jacked PileLu, Qun / Yuan, Jianbo / Li, Huixia et al. | 2011
- 1438
-
Study on Application of Fiber Bragg Grating Strain Tube in Deep Displacement Monitoring of Pipeline LandslideMa, Yunbin / Chen, Yingjie / Tan, Dongjie / Ma, Tao et al. | 2011
- 1445
-
Fluid-Structure Coupling Vibration Study on Heating Pipe under Parametric ExcitationChen, Guiqing / Dong, Baozhu et al. | 2011
- 1454
-
Simulation Testing on the Shutdown and Safe Restart of Crude Oil PipelinesYang, Mei / Jing, Jiaqiang / Lei, Linglin / Tan, Jiatong / Chen, Junwen et al. | 2011
- 1465
-
Analysis of the Existing Buried Pipeline Parallel to Shield Tunneling Effects on the Stratum SettlementWu, Weiyi et al. | 2011
- 1472
-
Analysis on Potential Safety Hazard in Natural Gas Pipeline Network of BeijingYou, Qiuju / Fan, Jianchun / Zhu, Wei / Xing, Tao et al. | 2011
- 1481
-
Pipeline Digitalization and Integrity ManagementWang, Junqiang / Shuai, Jian et al. | 2011
- 1491
-
Monitoring Technology in Permafrost and Geotechnical Regions of MoHe-DaQing PipelinePengchao, Chen / Hong, Zhang / Hongju, Wang / Shibin, Zhang et al. | 2011
- 1502
-
Numerical Simulation of Natural Gas Pipeline LeakagePeng, Shanbi / Li, Changjun / Liu, Enbin / Liao, Kexi / Wang, Wuyi / Li, Junying et al. | 2011
- 1512
-
Smart Pipes: The Future for Proactive Asset ManagementWalton, Robert / Sadeghioon, Ali Mollazadeh / Metje, Nicole / Chapman, David / Ward, Michael et al. | 2011
- 1524
-
Research on Optimal Operation Methods of Heating Pipe NetworkZhao, Na / Wang, Songling / Wu, Zhengren et al. | 2011
- 1532
-
Establishment and Discovery of Pipeline Integrity Management SystemWang, Ting / Feng, Qing-shan / Zheng, Hong-long / Sun, Ling / Chang, Qing et al. | 2011
- 1541
-
Research on the Septic Tank of Existing Building Drainage System Based on the Sustainable Development ViewWu, Shan / Tang, Shiwen / Hu, Yueheng / Thibault, Simon et al. | 2011
- 1553
-
Pipe Ring Design of Thoroughfare North Arch of Hong Kong-Zhuhai-Macao BridgeWu, Yingliang / Chen, Yong et al. | 2011
- 1562
-
Analysis of Vortex-Induced Vibration of Offshore Riser and Pipeline with Unsupported Span in Steady CurrentLi, Huizhi / Zhang, Xingtao / Wang, Guichun / Li, Wusheng / Chen, Weili et al. | 2011
- 1571
-
Hydraulic Calculation Software Development of Water Supply Networks Based on AutoCADYang, Bin / Yu, Guoping / Wang, Dong et al. | 2011
- 1581
-
An Innovative In-Line Intercepting Double-Layer Drainage System: Concept and ProspectsJiang, Wenchao / Lv, Niannan / Yang, Zhengcheng / Song, Qianfeng / Zhang, Lianqiang et al. | 2011
- 1589
-
Mapping the Underworld: A Step-Change in the Approach to Utility Location and DesignationRoyal, A. C. D. / Rogers, C. D. F. / Atkins, P. R. / Chapman, D. N. / Chen, H. / Cohn, A. G. / Foo, K. Y. / Goddard, K. / Hayes, R. / Hao, T. et al. | 2011
- 1598
-
Pipeline Engineering in the Ground: The Impact of Ground Conditions on Pipeline Condition and Maintenance OperationsRoyal, A. C. D. / Rogers, C. D. F. / Atkins, P. R. / Chapman, D. N. / Curioni, G. / Foo, K. Y. / Hao, T. / Metje, N. / Moghareh Abed, T. / Shirgiri, N. et al. | 2011
- 1610
-
BHA Mechanical Analysis and Research for Automatic Directional DrillingChen, Gaojie / Yao, Aiguo / Lian, Zhipeng et al. | 2011
- 1620
-
Research on Water-Filled at First Time in the Long-Distance Water Transmission Pipelines with Gravity FlowYu, J. Y. / Wu, C. G. / Yuan, Y. X. / Chen, W. X. / Bian, X. L. / Wang, C. H. et al. | 2011
- 1628
-
Performance Compared Research of 75 Diameter Impregnated Diamond Core Bit between Chinese and ForeignYang, Daohe / Duan, Longchen / Li, Junping / Yan, TaiNing / Chen, Xiaosong / Wang, Hongbo et al. | 2011
- 1638
-
Effect of Induction Bending on 360 MPa Spiral Submerged-Arc Weld PipeChi, Qiang / Liu, Yinglai / Ji, Lingkang et al. | 2011
- 1648
-
Risk Assessment of City Gas Pipeline Based on Uncertain Analytic Hierarchy ProcessCao, Tao / Zhang, Huabing / Xiang, Xiaoqiang / Dai, Lianshuang / Zheng, Honglong / Liu, Yue et al. | 2011
- 1657
-
Natural Gas Pipeline Risk Assessment for Third-Party Interference Based on Fault Tree AnalysisLiang, Wei / Lin, Weipeng / Zhang, Laibin / Hu, Jinqiu / Guo, Cunjie et al. | 2011
- 1667
-
Geological Hazards Risk Evaluation of Pipeline Construction Site Based on Extension MethodZhang, Zhiguo / Shen, Naiqi / Li, Yongcheng / Wang, Yingshuang / Liu, Yufeng / Yan, Yusen et al. | 2011
- 1677
-
Wave-Induced Fatigue Reliability Study of Submarine Pipeline Span by First Passage Failure ApproachHan, Zhongying / Xue, Shifeng / Huang, Xiaoguang et al. | 2011
- 1688
-
Research on Quantitative Risk Evaluation of RBI Methodology in Gas Pipeline SystemsLiang, Rui / Zhang, Chunyan / Jiang, Feng et al. | 2011
- 1697
-
Risk Assessment of Underwater Gas Shield TunnelZeng, Hongbing / Zhang, Wentao / Feng, Ke / Xiang, Zhiqiang / Kang, Rui et al. | 2011
- 1705
-
Improved Risk Assessment of Pipeline Based on Fault Tree Quantitative AnalysisXiang, Xiaoqiang / Dai, Lianshuang / Cao, Tao / Zhang, Huabing et al. | 2011
- 1712
-
Research and Development for the Risk Assessment System of City Gas Transmission and Distribution NetworksZhang, Xiaofeng / Wang, Tong / Lv, Lianghai / Bai, Yongqiang et al. | 2011
- 1720
-
Study on Risk Assessment of Urban Gas Pipeline Based on Domino EffectWang, Zegen / Fu, Zhen / Zou, Yanshuang / Liu, Linsen / Liu, Hong et al. | 2011
- 1728
-
Oil/Gas Pipeline Typical Third-Party Endanger Reliability Research Considering Failure Transfer/Model CorrelationPeng, Xing yu / Liang, Guangchuan / Yu, Jiansheng / Liu, Zhengfen / Yang, Biao et al. | 2011
- 1740
-
High Consequence Areas (HCAs) Assessment for Long-Distance Oil/Gas PipelineMa, Jianlin / Chen, Liqiong / Zhang, PengpPh.D. / Wang, Sizhong et al. | 2011
- 1749
-
Study on Safety Assessment of City Gas PipelinesWang, Xuan et al. | 2011
- 1761
-
Application of SAFETI in the Analysis of Natural Gas Pipeline Leakage AccidentNi, Xiaoyang / Yang, Bo / Xu, Jiao et al. | 2011
- 1771
-
Numerical Experimentation of the Underground Pipeline Anti-To Float in Liquefaction Field with Gravel Draining Water LayerHe, Jianping / Chen, Weizhong et al. | 2011
- 1784
-
Analysis of Pipeline Failure Probability Caused by Earthquake Based on the Allowable StrainZhang, Huabing / Cheng, Wuyi / Zhou, Lijian / Zheng, Honglong et al. | 2011
- 1790
-
Uplift Response of Large-Diameter Buried Pipeline in Liquefiable Soil Using Pipe-Soil Coupling ModelZhu, Xiuxing / Xue, Shifeng / Tong, Xinghua / Sun, Xiang et al. | 2011
- 1802
-
Study on Mechanical Behaviors of Buried Pipelines Subjected to Three-Dimensional Earthquake Input MotionsYang, Runlin / Zhang, Shun et al. | 2011
- 1810
-
New Frontiers in University-City Collaboration for the Public Good: Review Process for New ProductsSener, Erdogan / Iseley, Tom / Wen, Guojun et al. | 2011
- 1818
-
Research on Ground Subsidence in Shield Tunneling Construction Based on CC MethodHe, Huagang / Liu, Weiguang / Kong, Yipping et al. | 2011
- 1825
-
Application of Cast-in-Situ Concrete Tubular Pile with Large Diameter in Pit ExcavationKong, Xiangbing / Xia, Tangdai / Zhai, Chaojiao / Hou, Jian et al. | 2011
- 1834
-
The Influence of Excavation in Red Clay by Six Sections with CRD Method on the Vaults Subsidence and Structural Internal ForceZhang, Dingbang et al. | 2011
- 1845
-
Mechanical Property Research on the Water Pressure Test for a Prestressed and Precast Concrete Segmental LiningLiu, Peng / Yang, Sizhong / Wang, Guanming / Wang, Guangming / Wang, Chen et al. | 2011
- 1856
-
Isolation Piles Protection Research of the Tianning Tower in the Construction of the Shield Tunnel of Ningbo Metro Line 1Yao, Yanming / Wang, Shijun et al. | 2011
- 1864
-
Study on Launching and Receiving Technology of Shield TunnelZhou, Xiaojun / Wang, Jinghe / Wang, Xiaobo / Hu, Hongyun et al. | 2011
- 1874
-
Optimization Study on Maintenance Structure of Shaft in Shield TunnelZhou, Xiaojun / Wang, Jinghe / Wang, Xiaobo / Hu, Hongyun / Wang, Xiaofeng et al. | 2011
- 1884
-
Analysis of Settlement Caused by TBM Construction in Sand Formations in BeijingLi, Hongan / Ma, Xiaochun et al. | 2011
- 1897
-
Analysis of Ground Settlement during Super Large EPBM TunnelingQiang, Pei et al. | 2011
- 1907
-
Study on the Deformation Law of Overlying Buried Gas Pipeline by Excavation of Shallow Double TunnelWang, Yali / Li, Yunpeng / Yuan, Honghu / Zhang, Huabin et al. | 2011
- 1920
-
Study on Mechanical Behaviors of Underground Pipelines Due to Excavation of Subway TunnelsYang, Runlin / Wang, Juanjuan et al. | 2011
- 1931
-
Progress in the Model Testing of Shield TunnelingHe, Chuan / Jiang, Yingchao / Xu, Guowen / Fang, Yong / Wang, Yang et al. | 2011
- 1938
-
Study on Thrust of Earth-Pressure-Balanced Shield Tunneling in GravelFang, Yong / He, Chuan / Xu, Guowen / Jiang, Yingchao / Wang, Yang et al. | 2011
- 1947
-
Under-Balance Method for Trenchless Pipeline Directional DrillingZhang, Peng / Huang, Jun / Huang, Yongshuo / Wu, Ying / Long, Xianchun et al. | 2011
- 1957
-
Technical Program of Trenchless Pipeline Directional Drilling Crossing Unfavorable StratumHuang, Yongshuo / Zhang, Peng / Duan, Yonghong / Wu, Ying / Long, Xianchun et al. | 2011
- 1968
-
The Main Environmental Geological Problems Caused by Directional Drilling Crossing in the Middle Yangtze RiverYin, Xiansong / Xie, Liming / Li, Shaoxiong et al. | 2011
- 1977
-
Design and Selection of the Project Scheme of Qing-Tie Oil Pipeline River-CrossingWei, Lixin / Pang, Renshan / Wang, Zhihua / Ju, Guoshuai et al. | 2011
- 1986
-
Computerized Simulation Software Development of the No-Dig ImpactorXiong, Qingshan / Liu, Shuangliang / Li, Jia / An, Chuanqi et al. | 2011
- 1993
-
Insight into Some Aspects of Pipe Jacking Techniques during Long Distance Installations in Municipal EngineeringYang, Zhuanyun et al. | 2011
- 2013
-
3D Numerical Simulation Analysis on Stability of Hole Wall and Pre-Estimation Technology of Hole Wall Instability in HDDLiu, Yuanliang / Xing, Liang et al. | 2011
- 2025
-
An Experimental Study on the Performance of PDM for HDDZhao, Yongzhe et al. | 2011
- 2032
-
Research and Application of Down-Hole Motor Borehole Technology for Directional Drilling in Coal MineZhao, Yongzhe / Shi, Zhijun / Liu, Qingxiu et al. | 2011
- 2039
-
Comprehensive Application of Both Pipe-Ramming and Intersection in Horizontal Directional Drilling Crossing ConstructionTu, Yanhui / Ma, Dianfei / Zhao, Peng et al. | 2011
- 2049
-
Preparation and Recycling of Drilling Mud in Large Scale Horizontal Directional Drilling Projects in Mainland ChinaShu, Biao / Ma, Baosong / Zeng, Cong / Lan, Haitao et al. | 2011
- 2060
-
Analysis on Failure Factors and a Case Study for a Microtunneling Pipe InstallationWen, Guojun / Koo, Dae-Hyun / Liu, Wei et al. | 2011
- 2070
-
Application of Trenchless Technology in Water Intaking Project Located on the Riverside of the Lower Reaches of the Yangtze RiverLei, Xiaoling / Zhong, Wei / Liu, Yubo et al. | 2011
- 2080
-
Excavation Analysis of Sheshui River Long Pipe-Jacking Tunnel for Gas Transmission Using Numerical SimulationLüˇ, Qiaosen / Luo, Xuedong / Zhang, Lei / Xu, Ying et al. | 2011
- 2088
-
Successful Practices of Environmental LG Vegetable Gum in Horizontal Directional DrillingCai, Jihua / Wu, Xiaoming / Gu, Sui et al. | 2011
- 2099
-
Applicability Analysis of Trenchless Corrosion Detecting Methods on Oil PipelineChen, Liqiong / Lu, Dexiu / Wang, Sizhong et al. | 2011
- 2109
-
Environmentally Friendly MEG Drilling Fluid System for Horizontal Well of Daqing Oil FieldZhao, Jingyuan / Sun, Yuxue / Zhang, Xinfa et al. | 2011
- 2119
-
Bore Planning Method of Single-Sided Directional Drilling for Pipeline Crossing Loess GullyWang, Xiaolin / Li, Yanjing / Kong, Lingxin et al. | 2011
- 2127
-
Borehole Stability Research on Weihe HDD CrossingLin, Tiejun / Lian, Zhanghua / Zhu, Xiaohua / Jia, Yanjie / Li, Jinhe / Ma, Xuqiang et al. | 2011
- 2134
-
Application of SDST in Guiding the String Design of Directional Crossing ReamingZhu, Xiaohua / Jia, Yanjie / Li, Guohui / Ma, Xiaocheng / Yang, Chunling / Li, Jinhe et al. | 2011
- 2143
-
A Novel Oscillating Orientation Device of DTH Hammer for Hard Rock Stratum Non-Dig DrillingWu, Yinzhu / Wu, Liping et al. | 2011
- 2151
-
Study on Correction of Safe Mud Weight Window (SMWW) for Horizontal WellZhao, Jingyuan / Sun, Yuxue / Li, Qiming / Zhang, Chunliang et al. | 2011
- 2160
-
Structural Design and Finite-Element Analysis of Three-Winged Auger Bit Applied to Nearly Horizontal Drilling in Soft CoalbedsLi, Quanxin et al. | 2011
- 2168
-
Design and Construction of Trenchless Directional Drilling for the Natural Gas Pipeline Project Crossing Zhantian LakeGao, Chengliang / Nie, Lei / Liang, Xiaoqiang / Wu, Jinghua / Pan, Dianqi et al. | 2011
- 2174
-
Microtunneling through a Very Soft Soil Condition—The Contractor's Perspective of a Case History 10 Years LaterAtalah, Alan et al. | 2011
- 2183
-
Application of Digital Photogrammetry in Trenchless EngineeringLueke, Jason S. / Pinghe, Sun / Ariaratnam, Samuel T. et al. | 2011
- 2193
-
Hardware Realization of Virtual Reality Based Training System for HDDLi, Chengwei / Liu, Xiaohao / Chen, Han / Liu, Wei / Wen, Guojun et al. | 2011
- 2199
-
A Parametric Study of Underground Utility Infrastructure in ChinaCao, Han / Ariaratnam, Samuel T. / Lueke, Jason S. / Wei, Hongchao / Sun, Pinghe / He, Renjun et al. | 2011
- 2209
-
Stability Analysis of Horizontal Directional Drilling Borehole Wall in Pre-Reinforced Sandy Pebble StratumZhang, Keneng / Liang, Xiaoqiang / Zhao, Ziliang / Li, Rui et al. | 2011
- 2216
-
Special Practices of Horizontal Directional Drilling in ChinaGao, Hong / Li, Guohui / Ma, Xiaocheng / Guo, Jun / Ma, Junru et al. | 2011
- 2225
-
Deviation Analysis and Correction of Direction Control for Horizontal Directional Drilling CrossingDai, Kemin / Jing, Jiaqiang / Li, Ye / Qin, Dailu / Chen, Zhe et al. | 2011
- 2236
-
The Structure and Operation Principle of Electric Pipe RammerLu, Hongzhi / Fang, Changliang / Wu, Zhaoming et al. | 2011
- 2244
-
Finite Element Analysis of Drilling Mechanism on Ordinary Cone Drill Bit during Impact-Compaction DrillingWang, Rusheng / Cao, Pinglu / Li, Guangxing / Yin, Qilei / Peng, Jianming et al. | 2011
- 2254
-
Study on Influence Factors to Application of Large-Scale HDD to Oil and Gas Pipe InstallationJiao, Ruyi / Zeng, Cong / Ma, Baosong et al. | 2011
- 2263
-
Application of Horizontal Directional Drilling in Crossing Gan River Project Adjacent to Shengmi BridgeZhang, Yuewu / Zhou, Pei / Ma, Baosong et al. | 2011
- 2272
-
Mechanical Analysis of Drill Strings in Horizontal Directional DrillingDou, Yihua / Cao, Yinping et al. | 2011
- 2285
-
Analysis and Modeling of Mechanical Parameters in Horizontal Directional Drilling Pressure-Fed ReamingWu, Xiaoming / Fu, Bixi / Qiu, Lingling et al. | 2011
- 2291
-
Magnetic Field Measurement to Detect and Locate Underground Power CableWang, P. / Goddard, K. F. / Lewin, P. L. / Swingler, S. / Atkins, P. / Foo, K. Y. et al. | 2011
- 2298
-
Investigation of the Key Technology for Large-Scale Directional Drilling Crossing for Oil and Gas PipelinesYijie, Qiu / Jiaqiang, Jing / Lu, Yang / Dailu, Qin / Xiangwei, Kong / Liang, Ming et al. | 2011
- 2309
-
A Review of Construction of Roadbed in High Speed Lines in China Combined with the Calculation of Pipe Load Subject to TrafficHuang, Gonghua et al. | 2011
- 2318
-
New Generation of Design Tools for Directional Drilling ProjectsBayat, Alireza / Lawrence, Karl / Knight, Mark / Rubeiz, Camille et al. | 2011
- 2332
-
Study on the Minimum Bend Radius of GRP Curved Jacking PipeChen, Jianzhong / Li, Zhuoqiu et al. | 2011
- 2338
-
The Status, Development, and Key Technologies of Pipeline Directional Drill ProjectZhang, Peng / Luo, Pingya / Wu, Ying / Huang, Yongshuo et al. | 2011
- 2350
-
Urban Curved Jacking Pipe Construction Survey ControlZhang, Hao et al. | 2011
- 2357
-
On the Behavior of a Stuck Curved Pipe-JackingShou, K. J. / Yen, J. H. et al. | 2011
- 2366
-
Buried Pipeline Optimization in Landslide AreaHuang, Fan / Lu, Hongzhi / Wu, Zhaoming et al. | 2011
- 2377
-
Characterization of Urban Runoff from Combined Sewer and Storm Sewer Catchments in Beijing, ChinaChe, W. / Zhang, W. / Liu, D. K. / Gan, Y. P. / Lv, F. F. et al. | 2011
- 2388
-
Remediation of Contaminated Soil and Groundwater Using Humic Acid in Permeable Reactive Barrier for Pipeline LeakageWang, Yajun / Wang, Jin-xi / Li, Chun-e et al. | 2011
- 2395
-
The Use of Different Chlorine Decay Models in Different Materials of Pipelines in Water Distribution SystemZhao, Zhiling / Yang, Jialu / Duan, Chunyi / Liu, Shupo et al. | 2011