An improved ant algorithm for Multi-mode Resource Constrained Project Scheduling Problem∗ (English)
- New search for: Wuliang, Peng
- New search for: Min, Huang
- New search for: Yongping, Hao
- New search for: Wuliang, Peng
- New search for: Min, Huang
- New search for: Yongping, Hao
In:
RAIRO - Operations Research
;
48
, 4
;
595-614
;
2014
- Article (Journal) / Electronic Resource
-
Title:An improved ant algorithm for Multi-mode Resource Constrained Project Scheduling Problem∗
-
Contributors:
-
Published in:RAIRO - Operations Research ; 48, 4 ; 595-614
-
Publisher:
- New search for: EDP Sciences
-
Publication date:2014-10-01
-
Size:20 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
- New search for: 68M20 / 90C59
- Further information on Mathematics Subject Classification
-
Keywords:
-
Classification:
-
Source:
Table of contents – Volume 48, Issue 4
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 429
-
Multi-objective geometric programming problem with Karush−Kuhn−Tucker condition using ϵ-constraint methodOjha, A.K. / Ota, Rashmi Ranjan et al. | 2014
- 455
-
Two-stage robust optimization, state-space representable uncertainty and applicationsMinoux, Michel et al. | 2014
- 477
-
Estimating the supply chain efficiency loss when the seller has to estimate the buyer’s willingness to payBrusset, Xavier et al. | 2014
- 497
-
Block decomposition approach to compute a minimum geodetic set∗∗∗Ekim, Tınaz / Erey, Aysel et al. | 2014
- 509
-
On finding optimal parameters of an oscillatory model of handwritingAndré, Gaëtan / Messine, Frédéric et al. | 2014
- 521
-
Finite buffer GI/Geo/ 1 batch servicing queue with multiple working vacationsVijaya Laxmi, P. / Jyothsna, Kanithi et al. | 2014
- 545
-
Multi-objective Optimization Problem with Bounded ParametersBhurjee, Ajay Kumar / Panda, Geetanjali et al. | 2014
- 559
-
The nonlinear complementarity model of industrial symbiosis network equilibrium problemXu, Shiqin / Liu, Guoshan / Lv, Wendai / Liu, Yingmei et al. | 2014
- 595
-
An improved ant algorithm for Multi-mode Resource Constrained Project Scheduling Problem∗Wuliang, Peng / Min, Huang / Yongping, Hao et al. | 2014
- 615
-
An SMDP model for a multiclass multi-server queueing control problem considering conversion timesZhang, Zhicong / Li, Na / Li, Shuai / Yan, Xiaohui / Guo, Jianwen et al. | 2014