Attitude dynamics of a spacecraft with variable structure at presence of harmonic perturbations (English)
- New search for: Doroshin, Anton V.
- New search for: Krikunov, Mikhail M.
- New search for: Doroshin, Anton V.
- New search for: Krikunov, Mikhail M.
In:
Applied Mathematical Modelling
;
38
, 7-8
;
2073-2089
;
2013
-
ISSN:
- Article (Journal) / Electronic Resource
-
Title:Attitude dynamics of a spacecraft with variable structure at presence of harmonic perturbations
-
Contributors:Doroshin, Anton V. ( author ) / Krikunov, Mikhail M. ( author )
-
Published in:Applied Mathematical Modelling ; 38, 7-8 ; 2073-2089
-
Publisher:
- New search for: Elsevier Inc.
-
Publication date:2013-10-08
-
Size:17 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 38, Issue 7-8
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1919
-
Quasi-linear stochastic programming model based on expectation and variance and its application in transportation problemLi, Fachao / Jin, Chenxia / Wang, Li et al. | 2013
- 1929
-
A Monte Carlo algorithm for real time task scheduling on multi-core processors with software controlled dynamic voltage scalingMishra, Abhishek / Tripathi, Anil Kumar et al. | 2013
- 1948
-
Solving an inverse heat conduction problem using genetic algorithm: Sequential and multi-core parallelization approachPourgholi, Reza / Dana, Hassan / Tabasi, Seyed Hashem et al. | 2013
- 1959
-
Nash bargaining and leader–follower models in water allocation: Application to the Zarrinehrud River basin, IranSafari, Nasim / Zarghami, Mahdi / Szidarovszky, Ferenc et al. | 2013
- 1969
-
Free vibration analysis of a rigid bar supported by arbitrary elastic beamsWu, Jia-Jang et al. | 2013
- 1983
-
Inverse kinematics solutions for industrial robot manipulators with offset wristsKucuk, Serdar / Bingul, Zafer et al. | 2013
- 2000
-
An interactive dynamic approach based on hybrid swarm optimization for solving multiobjective programming problem with fuzzy parametersAbo-Sinna, M.A. / Yousria Abo-Elnaga, Y. / Mousa, A.A. et al. | 2013
- 2015
-
Multiple response optimisation: An approach from multiobjective stochastic programmingDíaz-García, José A. / Bashiri, Mahdi et al. | 2013
- 2028
-
Interval data without sign restrictions in DEAHatami-Marbini, Adel / Emrouznejad, Ali / Agrell, Per J. et al. | 2013
- 2037
-
Dynamic modelling and input-energy comparison for the elevator systemChen, Kun-Yung / Huang, Ming-Shyan / Fung, Rong-Fong et al. | 2013
- 2051
-
Optimization of power production through coordinated use of hydroelectric and conventional power unitsDoganis, Philip / Sarimveis, Haralambos et al. | 2013
- 2063
-
Order acceptance and due-date quotation in low machine ratesIranpoor, Mehdi / Fatemi Ghomi, S.M.T. / Zandieh, M. et al. | 2013
- 2073
-
Attitude dynamics of a spacecraft with variable structure at presence of harmonic perturbationsDoroshin, Anton V. / Krikunov, Mikhail M. et al. | 2013
- 2090
-
Actuator fault detection and estimation for the Lur’e differential inclusion systemHuang, Jun / Yu, Lei / Zhang, Maoqing / Zhu, Fanglai / Han, Zhengzhi et al. | 2013
- 2101
-
The extended linear assignment method for multiple criteria decision analysis based on interval-valued intuitionistic fuzzy setsChen, Ting-Yu et al. | 2013
- 2118
-
A new mixed integer linear programming model for the multi level uncapacitated facility location problemKratica, Jozef / Dugošija, Djordje / Savić, Aleksandar et al. | 2013
- 2130
-
Utilization of characteristic polynomials in vibration analysis of non-uniform beams under a moving mass excitationAhmadi, Mehdi / Nikkhoo, Ali et al. | 2013
- 2141
-
An efficient decision making approach in incomplete soft setKong, Zhi / Zhang, Guodong / Wang, Lifu / Wu, Zhaoxia / Qi, Shiqing / Wang, Haifang et al. | 2013
- 2151
-
Fractional multi-commodity flow problem: Duality and optimality conditionsFakhri, Ashkan / Ghatee, Mehdi et al. | 2013
- 2163
-
Boussinesq indentation of a transversely isotropic half-space reinforced by a buried inextensible membraneShodja, H.M. / Ahmadi, S.F. / Eskandari, M. et al. | 2013
- 2173
-
Dynamic model of worm propagation in computer networkMishra, Bimal Kumar / Pandey, Samir Kumar et al. | 2013
- 2180
-
Multi-server machine repair problems under a (V, R) synchronous single vacation policyWu, Chia-Huang / Ke, Jau-Chuan et al. | 2013
- 2190
-
Continuous interval-valued intuitionistic fuzzy aggregation operators and their applications to group decision makingZhou, Ligang / Tao, Zhifu / Chen, Huayou / Liu, Jinpei et al. | 2013
- 2206
-
Dynamic modeling of copper flash smelting process at a Smelter in ChinaLiu, Jian-hua / Gui, Wei-hua / Xie, Yong-fang / Yang, Chun-hua et al. | 2013
- 2214
-
The inverse solution of the atomic mixing equations by an operator-splitting methodKirkup, Stephen / Yazdani, Javad / Aspey, Robin / Badheka, Ranjan et al. | 2013
- 2224
-
Transient behavior of a two-processor heterogeneous system with catastrophes, server failures and repairsAmmar, Sherif I. et al. | 2013
- 2235
-
Numerical solution of high-order differential equations by using periodized Shannon waveletsShi, Zhi / Li, Fumin et al. | 2013
- 2249
-
Location of cross-docking centers and vehicle routing scheduling under uncertainty: A fuzzy possibilistic–stochastic programming modelMousavi, S. Meysam / Vahdani, Behnam / Tavakkoli-Moghaddam, R. / Hashemi, H. et al. | 2013
- 2265
-
An enhanced finite volume method to model 2D linear elastic structuresSuliman, R. / Oxtoby, O.F. / Malan, A.G. / Kok, S. et al. | 2013
- 2280
-
Modeling and optimization of energy efficient routing in wireless sensor networksLee, Jeong-Hun / Moon, Ilkyeong et al. | 2013
- 2290
-
Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain managementTing, Pin-Shou / Chung, Kun-Jen et al. | 2013
- 2296
-
On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdownTing, Pin-Shou / Chung, Kun-Jen et al. | 2013
- IFC
-
Editorial Board| 2014