Project management and scheduling (English)
- New search for: Oulamara, A.
- New search for: Portmann, M.-C.
- New search for: Oulamara, A.
- New search for: Portmann, M.-C.
In:
European Journal of Operational Research
;
189
, 3
;
1133-1135
;
2007
-
ISSN:
- Article (Journal) / Electronic Resource
-
Title:Project management and scheduling
-
Contributors:Oulamara, A. ( author ) / Portmann, M.-C. ( author )
-
Published in:European Journal of Operational Research ; 189, 3 ; 1133-1135
-
Publisher:
- New search for: Elsevier B.V.
-
Publication date:2007-01-01
-
Size:3 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Source:
Table of contents – Volume 189, Issue 3
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 579
-
The Youngest OR in EuropeRuiz, Rubén / Maroto, Concepción et al. | 2006
- 583
-
Testing the accuracy of employee-reported data: An inexpensive alternative approach to traditional methodsHales, Douglas N. / Sridharan, V. / Radhakrishnan, Abirami / Chakravorty, Satya S. / Siha, Samia M. et al. | 2006
- 594
-
Modelling impacts of cropping systems: Demands and solutions for DEX methodologyŽnidaršič, Martin / Bohanec, Marko / Zupan, Blaž et al. | 2006
- 609
-
Exact solution procedures for the balanced unidirectional cyclic layout problemÖncan, Temel / Altınel, İ. Kuban et al. | 2006
- 624
-
Modelling and forecasting mortality in SpainDebón, A. / Montes, F. / Puig, F. et al. | 2006
- 638
-
An evolutionary approach for bandwidth multicoloring problemsMalaguti, Enrico / Toth, Paolo et al. | 2006
- 652
-
A branch-and-price approach for integrating nurse and surgery schedulingBeliën, Jeroen / Demeulemeester, Erik et al. | 2006
- 669
-
Soft computing-based aggregation methods for human resource managementCanós, L. / Liern, V. et al. | 2006
- 682
-
An efficient approach for solving the lot-sizing problem with time-varying storage capacitiesGutiérrez, J. / Sedeño-Noda, A. / Colebrook, M. / Sicilia, J. et al. | 2006
- 694
-
Multiobjective service restoration in electric distribution networks using a local search based heuristicGarcia, Vinícius Jacques / França, Paulo Morelato et al. | 2006
- 706
-
Nonconvex optimization using negative curvature within a modified linesearchOlivares, Alberto / Moguerza, Javier M. / Prieto, Francisco J. et al. | 2006
- 723
-
Proactive heuristic procedures for robust project scheduling: An experimental analysisVan de Vonder, Stijn / Demeulemeester, Erik / Herroelen, Willy et al. | 2006
- 734
-
A bi-objective coordination setup problem in a two-stage production systemCiavotta, Michele / Detti, Paolo / Meloni, Carlo / Pranzo, Marco et al. | 2006
- 746
-
Real time management of a metro rail terminusFlamini, Marta / Pacciarelli, Dario et al. | 2006
- 762
-
Optimization models for the single delay management problem in public transportationHeilporn, Géraldine / De Giovanni, Luigi / Labbé, Martine et al. | 2006
- 775
-
Tolerance-based Branch and Bound algorithms for the ATSPTurkensteen, Marcel / Ghosh, Diptesh / Goldengorin, Boris / Sierksma, Gerard et al. | 2006
- 789
-
An asymmetric TSP with time windows and with time-dependent travel times and costs: An exact solution through a graph transformationAlbiach, José / Sanchis, José María / Soler, David et al. | 2006
- 803
-
Combinatorics for modern manufacturing, logistics and supply chains (ECCO XVIII)Kovalyov, Mikhail Y. / Martello, Silvano et al. | 2007
- 807
-
Selection, acquisition, and allocation of manufacturing technology in a multi-period environmentAhmed, Shabbir / Sahinidis, Nikolaos V. et al. | 2006
- 822
-
Supply chain optimization of petroleum organization under uncertainty in market demands and pricesAl-Othman, Wafa B.E. / Lababidi, Haitham M.S. / Alatiqi, Imad M. / Al-Shayji, Khawla et al. | 2006
- 841
-
Approximate methods for convex minimization problems with series–parallel structureBen-Israel, Adi / Levin, Genrikh / Levin, Yuri / Rozin, Boris et al. | 2006
- 856
-
Heuristic constructive algorithms for open shop scheduling to minimize mean flow timeBräsel, Heidemarie / Herms, André / Mörig, Marc / Tautenhahn, Thomas / Tusch, Jan / Werner, Frank et al. | 2007
- 871
-
Logistics scheduling with batching and transportationChen, Bo / Lee, Chung-Yee et al. | 2006
- 877
-
A single-item economic lot-sizing problem with a non-uniform resource: ApproximationChubanov, Sergei / Kovalyov, Mikhail Y. / Pesch, Erwin et al. | 2007
- 890
-
Network design and flow problems with cross-arc costsCohn, Amy / Davey, Melinda / Schkade, Lisa / Siegel, Amanda / Wong, Caris et al. | 2006
- 902
-
A heuristic multi-start decomposition approach for optimal design of serial machining linesGuschinskaya, O. / Dolgui, A. / Guschinsky, N. / Levin, G. et al. | 2006
- 914
-
A discrete EOQ problem is solvable in timeKovalev, Alexandr / Ng, C.T. et al. | 2006
- 914
-
A discrete EOQ problem is solvable in timeKovalev, Alexandr et al. | 2008
- 914
-
A discrete EOQ problem is solvable in Formula Not Shown timeKovalev, A. / Ng, C. T. et al. | 2008
- 920
-
Polyhedral combinatorics of multi-index axial transportation problemsKravtsov, M.K. / Lukshin, E.V. et al. | 2007
- 939
-
Algorithms for the q-model clustering problem with application in switching cabinet manufacturingMorgan, Shona D. / Fathi, Yahya et al. | 2007
- 952
-
Furniture supply chain tactical planning optimization using a time decomposition approachOuhimmou, M. / D’Amours, S. / Beauregard, R. / Ait-Kadi, D. / Chauhan, S. Singh et al. | 2007
- 971
-
A hybrid neuro-fuzzy analytical approach to mode choice of global logistics managementSheu, Jiuh-Biing et al. | 2006
- 987
-
Target market selection and marketing effort under uncertainty: The selective newsvendorTaaffe, Kevin / Geunes, Joseph / Romeijn, H. Edwin et al. | 2006
- 1004
-
Constraint programming for computing non-stationary (R,S) inventory policiesTarim, S. Armagan / Smith, Barbara M. et al. | 2006
- 1022
-
A new model and hybrid approach for large scale inventory routing problemsYu, Yugang / Chen, Haoxun / Chu, Feng et al. | 2007
- 1041
-
Advances in Retrial QueuesArtalejo, Jesús R. / Gómez-Corral, Antonio et al. | 2007
- 1042
-
Algorithmic analysis of the Geo/Geo/c retrial queueArtalejo, Jesus R. / Economou, Antonis / Gómez-Corral, Antonio et al. | 2007
- 1057
-
The BMAP/PH/N retrial queue with Markovian flow of breakdownsKim, Chesoong / Klimenok, Valentina I. / Orlovsky, Dmitry S. et al. | 2007
- 1073
-
Mobile customer model with retrialsMachihara, Fumiaki / Saitoh, Midori et al. | 2007
- 1088
-
A discrete-time retrial queueing model with one serverNobel, Rein / Moreno, Pilar et al. | 2007
- 1104
-
Convergence of the stationary distributions of M/M/s/K retrial queue as K tends to infinityShin, Yang Woo et al. | 2007
- 1118
-
Transient analysis of an M/G/1 retrial queue subject to disasters and server failuresWang, Jinting / Liu, Bin / Li, Jianghua et al. | 2007
- 1133
-
Project management and schedulingOulamara, A. / Portmann, M.-C. et al. | 2007
- 1136
-
Pre-emption in resource-constrained project schedulingBallestín, Francisco / Valls, Vicente / Quintanilla, Sacramento et al. | 2006
- 1153
-
GRASP and path relinking for project scheduling under partially renewable resourcesAlvarez-Valdes, R. / Crespo, E. / Tamarit, J.M. / Villa, F. et al. | 2006
- 1171
-
A genetic algorithm for the resource constrained multi-project scheduling problemGonçalves, J.F. / Mendes, J.J.M. / Resende, M.G.C. et al. | 2006
- 1191
-
Multi-mode project payment scheduling problems with bonus–penalty structureHe, Zhengwen / Xu, Yu et al. | 2006
- 1208
-
On path correlation and PERT biasBanerjee, Arunava / Paul, Anand et al. | 2007
- 1217
-
A representation model for the solving-time distribution of a set of design tasks in new product development (NPD)Dragut, A.B. / Bertrand, J.W.M. et al. | 2006
- 1234
-
An evolutionary approach to rehabilitation patient scheduling: A case studyChien, Chen-Fu / Tseng, Fang-Pin / Chen, Chien-Hung et al. | 2007
- 1254
-
Runway sequencing with holding patternsArtiouchine, Konstantin / Baptiste, Philippe / Dürr, Christoph et al. | 2006
- 1267
-
Predictive–reactive scheduling on a single resource with uncertain future jobsYang, Bibo / Geunes, Joseph et al. | 2006
- 1284
-
A branch-and-check algorithm for minimizing the weighted number of late jobs on a single machine with release datesSadykov, Ruslan et al. | 2006
- 1305
-
Lower bounds for the earliness–tardiness scheduling problem on parallel machines with distinct due datesKedad-Sidhoum, Safia / Solis, Yasmin Rios / Sourd, Francis et al. | 2006
- 1317
-
Batch scheduling of deteriorating reworkablesBarketau, M.S. / Cheng, T.C.E. / Kovalyov, M.Y. et al. | 2006
- 1327
-
On-line scheduling on a batch processing machine with unbounded batch size to minimize the makespanRidouard, Frédéric / Richard, Pascal / Martineau, Patrick et al. | 2006
- 1343
-
Recent contributions of OR to network optimizationArbib, Claudio / Felici, Giovanni et al. | 2007
- 1345
-
The Linear Ordering Problem with cumulative costsBertacco, Livio / Brunetta, Lorenzo / Fischetti, Matteo et al. | 2006
- 1358
-
Embedding a novel objective function in a two-phased local search for robust vertex coloringCaramia, Massimiliano / Dell’Olmo, Paolo et al. | 2007
- 1381
-
Application of a simulation-based dynamic traffic assignment modelFlorian, Michael / Mahut, Michael / Tremblay, Nicolas et al. | 2006
- 1393
-
An overview of Stackelberg pricing in networksvan Hoesel, Stan et al. | 2006
- 1403
-
Discrete time GI/Geom/1 queueing system with priorityNdreca, Sokol / Scoppola, Benedetto et al. | 2007
- 1409
-
Local search algorithms for political districtingRicca, Federica / Simeone, Bruno et al. | 2006
- IFC
-
Editorial Board| 2008